Bldg 650 Vault Upgrade FA520925Q9029
Summary
AI-generated · Sep 13, 2025Remove and dispose of existing desks, chairs, communication racks, carpet, electrical/communication wiring, and floor tiles. Install a 10 H raised floor with ramps and design/install all electrical cables incorporating first-floor gear box, main panel, sub panel, UPS, CRAC units, 14 communication racks (A&B), shut-off switch, lights, alarm system, and environmental alarm, using the provided drawings and equipment list.
Install two 20T CRAC units (A&B) that alternate for cooling with under-floor venting and drainage per the vent drawings. Install two 100 KVA UPS systems including power cables, grounding, power panels, (A&B) power to each rack, PDUs, and under-floor ladder rack. Install 14 communication racks plus 1 half rack, with grounding, power, and above-rack cable management baskets per drawings. Install emergency shut-off switch, environmental monitoring, ISP fiber optic distribution cables (room-to-room), and rack-to-hub interconnect fiber cables.
Vendor shall remove and dispose of existing desks, chairs, communication racks, carpet, electrical/comm. wiring and floor tiles. The vendor shall install 10 H raised floor with ramps. The vendor shall design and install all electrical cables incorporating 1st floor gear box, main panel, sub panel, UPS, CRAC Units, 14 communication racks (A&B), shut off switch, lights, alarm system, and environmental alarm (utilize drawings and equipment list). The vendor shall install two 20T CRAC Units (A&B), that alternate when cooling w/under floor venting (utilize vent drawing) and drainage. The vendor shall install two 100KVA UPS including power cables, grounding, power panels, (A&B) power to each rack, PDUs, under floor ladder rack (utilize drawings). The vendor shall install 14 communication racks, 1 half rack, grounding, power and above rack cable wire management basket (utilize drawings). The vendor shall install emergency shut off switch, environment monitoring, ISP fiber optic distribution cables (rm to rm), rack interconnect fiber cables (rack to hub rack).
From Combined Synopsis/Solicitation posted on Sep 10, 2025Vendor shall remove and dispose of existing desks, chairs, communication racks, carpet, electrical/comm. wiring and floor tiles. The vendor shall install 10”H raised floor with ramps. The vendor shall design and install all electrical cables incorporating 1st floor gear box, main panel, sub panel, UPS, CRAC Units, 14 communication racks (A&B), shut off switch, lights, alarm system, and environmental alarm (utilize drawings and equipment list). The vendor shall install two 20T CRAC Units (A&B), that alternate when cooling w/under floor venting (utilize vent drawing) and drainage. The vendor shall install two 100KVA UPS including power cables, grounding, power panels, (A&B) power to each rack, PDUs, under floor ladder rack (utilize drawings). The vendor shall install 14 communication racks, 1 half rack, grounding, power and above rack cable wire management basket (utilize drawings). The vendor shall install emergency shut off switch, environment monitoring, ISP fiber optic distribution cables (rm to rm), rack interconnect fiber cables (rack to hub rack).
From Combined Synopsis/Solicitation posted on Sep 12, 2025Vendor shall remove and dispose of existing desks, chairs, communication racks, carpet, electrical/comm. wiring and floor tiles. The vendor shall install 10 H raised floor with ramps. The vendor shall design and install all electrical cables incorporating 1st floor gear box, main panel, sub panel, UPS, CRAC Units, 14 communication racks (A&B), shut off switch, lights, alarm system, and environmental alarm (utilize drawings and equipment list). The vendor shall install two 20T CRAC Units (A&B), that alternate when cooling w/under floor venting (utilize vent drawing) and drainage. The vendor shall install two 100KVA UPS including power cables, grounding, power panels, (A&B) power to each rack, PDUs, under floor ladder rack (utilize drawings). The vendor shall install 14 communication racks, 1 half rack, grounding, power and above rack cable wire management basket (utilize drawings). The vendor shall install emergency shut off switch, environment monitoring, ISP fiber optic distribution cables (rm to rm), rack interconnect fiber cables (rack to hub rack).
From Combined Synopsis/Solicitation posted on Sep 16, 2025Notice history
3-
-
Combined Synopsis/Solicitation Posted Sep 12, 2025View changes (2)
- Description: Description was updated
- Set-Aside: Local Area Set-Aside (FAR 26.2) → No Set aside used
-
Combined Synopsis/Solicitation LATEST Posted Sep 16, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 18, 2025 → Sep 22, 2025