Black Avenue Furnace Replacement 1240LS26Q0003
Summary
AI-generated · Jan 07, 2026Decommission, remove, and replace a non-functional natural gas furnace at a Forest Service-owned residential facility, performing all work per the attached Statement of Work. The project site is in Big Piney, Wyoming, and includes proper decommissioning, removal, site prep, and installation of a replacement furnace according to the specified requirements.
Respondents must submit: Schedule of Items with company information; a certification that repairs can be completed by the date listed in the SOW and Delivery Information; any issued amendments; Exhibit 1 Past Performance and Equipment Questionnaire; Exhibit 2 SF-1413 Subcontractor Form (if applicable); and a Technical Response aligned with the Evaluation Criteria (price, technical acceptability, and past performance). Attachments include the Solicitation Terms and Conditions, Schedule of Items, Wage Determination, and related exhibits.
The United States Department of Agriculture (USDA), Forest Service (FS), Intermountain Region, Bridger-Teton National Forest has a need for decommissioning, removal and replacement of a non-functional natural gas furnace at a Forest Service owned residential facility. Project location is at 421 Black Avenue, Big Piney, WY, 83113. See Attachment 2 Statement of Work. The following documents are included as attachments to this solicitation and can be accessed via the Attachments/Links section of the posting. Attachment 1 Solicitation Terms and Conditions. Attachment 2 Statement of Work. Attachment 3 Schedule of Items. Attachment 4 Wage Determination. Exhibit #1 Past Performance and Equipment Questionnaire. Exhibit #2 SF-1413 Subcontractor Form (If Applicable). AT A MINIMUM, QUOTERS SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR RESPONSE TO THIS SOLICITATION: 1.Schedule of Items (including Quoter s Company Information) 2.Certification that repairs can be completed by the date listed in the SOW, and in theDelivery Information Section. See Exhibit #1. 3.Any Amendment that may be issued. 4.Exhibit #1 Past Performance and Equipment Questionnaire. 5.Exhibit #2 SF-1413 Subcontractor Form (If Applicable). 6.Technical Response as Identified in Evaluation and Basis for Award, EvaluationCriteria, Price, Technical Acceptability, and Past Performance.
From Combined Synopsis/Solicitation posted on Jan 06, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA