BK27 IPC Base Life Support (BLS) Service in Philippines (Amendment 1) M68450-26-Q-H006
Summary
AI-generated · Aug 07, 2026Base Life Support (BLS) for BK27 IPC in the Philippines requires contractor-provided support including generator fuel (two drums of 50 gallons each), a 1-ton material-handling forklift (fuel supplied by the contractor), hazmat collection, and, in the original scope, room divider rental (which has been removed in Amendment 1). Submit a one-page quote, a 1–2 page service plan/capability statement detailing all BLS services across the period of performance, and a completed Foreign Vendor Information Form, along with the fully filled solicitation document. Quotes must be emailed to Capt. Annie A. Berg and SSgt. Jacie Liu by the RFQ close of 9 Aug 2026 PH time, with questions due by 7 Aug. This is a RFQ, not a binding order.
Amendment 1 updates several items: lead time is shortened to equal or shorter than 5 days (down from 7 days); room dividers are removed from the requirement; the forklift scope changes from 5-ton to 1-ton capacity; flight line access is not required; forklift operation hours are limited to 0800–1800 with no 24-hours-on-call; the government will provide fork extenders and the contractor must supply fuel for the forklift; hazard waste generator ID is not provided by the government. The generator fuel requirement remains (2 drums x 50 gallons) and hazmat collection continues to be part of the scope.
See attached documents for detail: "D1. Solicitation M68450-26-Q-H006 BK27 IPC BLS", "D1. Performance Work Statement (PWS)", and "D1. FOREIGN VENDOR INFORMATION FORM". RFQ/Solicitation Number: M68450-26-Q-H006 RFQ Date: 4 Aug 2026 (California time) PROJECT: Base Life Support Service for BK27 IPC (Generator Fuel, Room Divider rental, HAZMAT collection & MHE) QUESTION CLOSE: 7 Aug 2026 at 11:59 pm [Philippines standard time] RFQ CLOSE: 9 Aug 2026 at 11:59pm [Philippines standard time] Period of Performance: see attached Performance Work Statement (PWS). Location: Philippines, see attached PWS. This is a Request for Quote. This is NOT an order. This document is not legally binding and does not commit the US Government in anyway. Upon completion of this quote, please email your response to both Capt Annie A. Berg at annie.berg@usmc.mil and SSgt Liu, Jacie at jacie.liu@usmc.mil. All quotes are due to the Contracting Officer no later than 9 Aug 2026 at 11:59pm [Philippines standard time]. Quotes may not be accepted past the RFQ close date & time specified unless determined to be in the best interest of the Government by the Contracting Officer. General Requirements. Quotes shall consist of, at a minimum: 1.Completed this Solicitation document with all required information filled. All yellow highlighted ares needs to be completed by quoters. RFQ with required information and applicable representations and certifications. • Contractor information on the first page. • Total amount, lead time, signature and date on the first page. • Check “[ ] does or [ ] does not” in provision 52.204-26 • Check “[ ] does or [ ] does not” in provision 252.204-7016 • Check “[ ] will or [ ] will not” in provision 252.204-7017 2. One page quotation in PDF form. 3. Provide a 1-2 page service plan/technical capability statement, providing specifications of all BLS services outlined within the PWS throughout the period of performance. 4. Completed FORIEGN VENDOR INFORMATION FORM.
From Combined Synopsis/Solicitation posted on Aug 04, 2026Amendment 1: See attached “D1. Performance Work Statement (PWS) (Amendment 1)” and “D1. Solicitation M68450-26-Q-H006 BK27 IPC BLS (Amendment 1)” for detail. Required lead time: changed from “equal or shorter than 7 days” to “equal or shorter than 5 days”. The rental requirement of “room dividers” has been removed, and the 5-ton forklift has been replaced by 1-ton forklift. After careful consideration, the contracting officer shortened the required lead time to ensure enough time for quotes evaluation. Thank you very much for your understanding. Questions and Answers: Question 1: Room dividers - what is the preferred height and acceptable minimum/maximum height range? Answer: removed “room dividers” from the BLS requirement. Question 2: For Material handling equipment (5 Ton forklift), is flight line access needed inside the airport? Answer: Will not be used on flight line. However, the area the forklift will be used in has some trees that cannot be removed, therefore requires 1-ton forklift to work around the trees. Forklift larger than 1-ton forklift will not be technically acceptable. Contractor must provide the fuel necessary for the forklift to operate. Question 3: Forklift hours – Does the Operators and equipment need to be available 24 hours on Call? Answer: Operation hours will be limited to 0800-1800. “24-hours on call” is not required. Question 4: Hazardous waste – what is the Hazardous Waste Generator (HWG) ID? Answer: Unable to provide. The Government Technical Point of Contact (TPOC) currently does not have the answer. Question 5: MHE operations – what are the necessary lifting accessories? Answer: Only lifting accessories necessary will be fork extenders, which the government TPOC will provide. Question 6: Summary of the Requirements – • Generator Fuel - 2 drums x 50gallons • 1-ton Forklift • Hazmat Collection Room Dividers are removed from the requirement. They are no longer needed. RFQ/Solicitation Number: M68450-26-Q-H006 RFQ Date: 4 Aug 2026 (California time), Amendment 1 date: 7 August 2026 (California time) PROJECT: Base Life Support Service for BK27 IPC (Generator Fuel, Room Divider rental, HAZMAT collection & MHE) QUESTION CLOSE: 7 Aug 2026 at 11:59 pm [Philippines standard time] RFQ CLOSE: 9 Aug 2026 at 11:59pm [Philippines standard time] Period of Performance: see attached Performance Work Statement (PWS) (Amendment 1). Location: Philippines, see attached PWS (Amednment 1). This is a Request for Quote. This is NOT an order. This document is not legally binding and does not commit the US Government in anyway. Upon completion of this quote, please email your response to both Capt Annie A. Berg at annie.berg@usmc.mil and SSgt Liu, Jacie at jacie.liu@usmc.mil. All quotes are due to the Contracting Officer no later than 9 Aug 2026 at 11:59pm [Philippines standard time]. Quotes may not be accepted past the RFQ close date & time specified unless determined to be in the best interest of the Government by the Contracting Officer. General Requirements. Quotes shall consist of, at a minimum: 1.Completed this Solicitation document with all required information filled. All yellow highlighted ares needs to be completed by quoters. RFQ with required information and applicable representations and certifications. • Contractor information on the first page. • Total amount, lead time, signature and date on the first page. • Check “[ ] does or [ ] does not” in provision 52.204-26 • Check “[ ] does or [ ] does not” in provision 252.204-7016 • Check “[ ] will or [ ] will not” in provision 252.204-7017 2. One page quotation in PDF form. 3. Provide a 1-2 page service plan/technical capability statement, providing specifications of all BLS services outlined within the PWS throughout the period of performance. 4. Completed FORIEGN VENDOR INFORMATION FORM.
From Combined Synopsis/Solicitation posted on Aug 07, 2026Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Aug 07, 2026View changes (2)
- Title: BK27 IPC Base Life Support (BLS) Service in Philippines → BK27 IPC Base Life Support (BLS) Service in Philippines (Amendment 1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
PHL