Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 7 notices 12 documents

Bemiss Field Tree Cutting FA483025Q0062

Solicitation FA483025Q0062 Copied Notice ID eab5ddede13949f8a5f63b5169164a29 Copied DEPT OF DEFENSE — FA4830 23 CONS CC
SAM.gov
Posted
Jul 29, 2025
Deadline
Jul 31, 2025
Set-aside
SBA
NAICS
115310
PSC
F014

Summary

AI-generated · Aug 23, 2025

Remove approximately 22 acres of trees north of the HC-130 assault strip on Grand Bay Range, Moody AFB, GA, to eliminate obstacle height violations and safety risks to aircraft operations. The contractor must provide all labor, equipment, and on-site disposal in compliance with environmental regulations and base safety protocols; fallen trees must be left on-site and cannot be harvested due to embedded bullets and metal fragments. Work is FOB destination to Bemiss Field, with a required mobilization plan and timeline, fully burdened pricing via the attached Pricing Schedule, and proof of insurance. Quoters must be SAM-registered, and the award will use a Lowest Price Technically Acceptable (LPTA) evaluation that considers technical approach, mobilization/timeline, past performance, and price.

Numerous amendments have added new requirements and information: base access requirements and a base-pass process (including a REAL ID requirement) and a site-visit; Q&A procedures; additional attachments such as a Q&A responses, firebreak and cutting-area maps, and revised SOW/maps; and updates to wage determinations and period-of-performance language. Deadlines and attachments have been adjusted across amendments (e.g., updated wage-determination revision, new attachments, and extended or clarified submission timelines).

This is a combined synopsis and solicitation for a commercial service prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and A WRITTEN SOLICITATION WILL NOT BE ISSUED. The solicitation number for this procurement is FA483025Q0062 and it is issued as a Request for Quotation (RFQ). All References to offer or offeror in the clauses and provisions incorporated below are deemed to have the meaning of quotation and quoter respectively. Any quotation received in response to this RFQ is not binding until the contractor either signs the purchase order issued at time of award or starts of performance. The Government intends to evaluate quotations and award a single contract without discussions with Quoters; therefore, the Quoter s initial quotation should contain the Quoter s best terms from a price and technical standpoint. The Government does reserve the right to conduct discussions if deemed by the Contracting Officer to be in the best interest of the Government. This RFQ and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular (FAC) 2025-03, DFARS Change 01/17/2025, and DAFFARS Change 10/16/2024. In accordance with FAR 52.219-1 the North American Industry Classification System (NAICS) is 115310. The small business size standard is $11.5 million. The Government intends to award a single contract from this solicitation. This acquisition will be set aside 100% for Small Businesses in accordance with FAR 19.502-2(a). Description: This RFQ solicits quotes for tree cutting services on approximately 22 acres located north of the HC-130 assault strip on Grand Bay Range, Moody AFB. The project involves felling trees that present obstacle height violations and critical safety concerns for aircraft operations. All fallen trees must be left on-site and cannot be sold or harvested due to the presence of embedded bullets and metal fragments. The selected contractor will be responsible for all labor, equipment, and disposal compliant with environmental regulations and base safety protocols. Several trees north of the HC-130 assault strip on Grand Bay Range, Moody AFB, exceed obstacle height limits and pose critical safety risks, necessitating an adjustment to the assault strip's landing threshold. This adjustment considerably reduces the usable airstrip length for short-field HC-130 operations. Approximately 22 acres of trees require cutting. The fallen trees must remain on-site and cannot be sold or harvested due to the possibility of embedded bullets and metal fragments. FOB Point: Destination (Bemiss Field on Grand Bay Range (GBR), Moody AFB, GA.) Period of Performance: It is anticipated the project will start within 15 calendar days of the award. All quoters must be registered with System for Award Management (SAM) and the online representation and certification in SAM must be completed. Information concerning SAM requirements may be viewed via the internet at https://www.sam.gov or by calling 866-606- 8220, or 334-206-7828 for international calls. Quoters that reject the terms and conditions of the solicitation may be excluded from consideration. The below listed FAR, Defense Federal Acquisition Regulation Supplement (DFARS), and Department of the Air Force Federal Acquisition Regulation Supplement (DAFFARS) clauses apply to this RFQ and will be incorporated into the resulting contract. All clauses may be viewed in full text via the internet at http://acquisition.gov. The Certificate of Compliance with Insurance Requirements (Attachment 4) applies to the solicitation. The following provisions and clauses will be incorporated: FAR 52.212-1 Instruction to Offerors Commercial Items FAR 52.212-2 Evaluation-Commercial Items Quotations shall contain the following information: RFQ Number Time Specified for Receipt of Quotations Name Address CAGE/UEI Telephone Number of Quoter Name and Email address of Representative authorized to discuss quote Any Discount Terms Acknowledgement of all Solicitation Amendments (if applicable). Quotations shall also include the following required documentation: Price: Quoted prices must be submitted using the Pricing Schedule at Attachment 7. Quoters shall insert unit prices in the attached pricing schedule, rounded to the nearest cent (for example $0.02 not $0.0231). Quoters rejecting the terms and conditions may be excluded from consideration. Note: Department of Labor (DOL) Wage Determination 2015-4493 Rev. 28, dated 05/23/2025, at Attachment 2, applies. Technical: The quoter must submit technical documentation that clearly demonstrates a complete and realistic plan to meet objectives stated in Parts I & II of the Statement of Work (SOW). The technical submission shall also include a mobilization plan and a timeline for completion of the requirement. The quoter shall also provide proof of insurance by completing Attachment 4. The technical documentation submitted for this Request for Quote shall be no more than ten (10) pages. Past Performance: Past Performance will be evaluated Acceptable or Unacceptable IAW FAR15.305(a)(2)(iv). An unknown or neutral past performance is considered acceptable. Evaluation: IAW FAR 52.212-2, Evaluation-Commercial Items, the Government will award a contract to the quoter who presents the best value continuum using Lowest Price-Technically Acceptable (LPTA). Award will be made to the lowest-priced proposal meeting or exceeding acceptable standards for non-price factors. These non-price factors will be Technical and Past Performance, and both will be rated on an Acceptable" or "Unacceptable" basis. Price: Evaluation of price will consider the total of the service to be provided. The CLIN price will be evaluated as the fully burdened price, rounded to the nearest cent. Offerors will be ranked from lowest to highest according to the total evaluated price. The two lowest priced proposals will be evaluated first. Technical: The Technical approach will be evaluated based on the quoters ability to meet the objectives stated in the SOW, mobilization plan, and timeline to complete requirement. Past Performance: Evaluation of past performance will consider past performance information obtained from any suitable source, such as Air Force automated past performance data bases (i.e. CPARS, PPIRS), direct local business experience with the quoter, or similar. A site visit will be held on 14 July 2025 at 2:00 PM EST. Interested vendors will meet at the 23d Contracting Squadron, 4380 Alabama Road, Moody AFB, GA 31699 (Attachment 9- Base Map). Parties will then proceed to the Grand Bay Range. If you wish to attend, fill out Attachment 5 - Base Pass Request and email it to the contracting POCs no later than 2:00 PM EST 3 July 2025. A government issued REAL ID is required for entrance into the installation. Questions and Answers: Should you have any questions about this requirement, please submit them no later than 2:00 PM EST 16 July 2025, all questions must be emailed to the POCs via Attachment 3. Answers to all questions will be posted to SAM.gov when the government has generated any and all answers. Should an amendment be necessary to allow for additional time, this solicitation may be extended with a later quotation due date. Response Time: Quotations will be accepted electronically no later than 2:00 PM EST on Tuesday, 29 July 2025. All quotations shall be marked with the RFQ number and title. Email quotations shall be sent to both the primary and alternate points of contact identified below. Primary Point of Contact: Connor-Marie Smith, Email: connor-marie.smith@us.af.mil, Phone 229-257-2811 Alternate Point of Contact: Ms. Amanda Richardson, Email: amanda.richardson.13@us.af.mil, Phone: 229- 460-4917 Wage Determination: IAW FAR 52.222-41 Wage Determination No.: 2015-4493 Rev. 28 Dated: 05/23/2025 applies and can be found at www.sam.gov ATTACHMENTS: Attachment 1 Statement of Work Attachment 2 Wage Determination 15-4493 Rev. 28 Attachment 3 Official Questions Form Attachment 4 - Required Insurance Compliance Attachment 5 Base Pass Request Attachment 6 Georgia Forestry Manual Attachment 7 Pricing Schedule Attachment 8 Provisions and Clauses Attachment 9- Base Map

From Combined Synopsis/Solicitation posted on Jun 27, 2025

This is a combined synopsis and solicitation for a commercial service prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and A WRITTEN SOLICITATION WILL NOT BE ISSUED. The solicitation number for this procurement is FA483025Q0062 and it is issued as a Request for Quotation (RFQ). All References to offer or offeror in the clauses and provisions incorporated below are deemed to have the meaning of quotation and quoter respectively. Any quotation received in response to this RFQ is not binding until the contractor either signs the purchase order issued at time of award or starts of performance. The Government intends to evaluate quotations and award a single contract without discussions with Quoters; therefore, the Quoter s initial quotation should contain the Quoter s best terms from a price and technical standpoint. The Government does reserve the right to conduct discussions if deemed by the Contracting Officer to be in the best interest of the Government. This RFQ and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular (FAC) 2025-03, DFARS Change 01/17/2025, and DAFFARS Change 10/16/2024. In accordance with FAR 52.219-1 the North American Industry Classification System (NAICS) is 115310. The small business size standard is $11.5 million. The Government intends to award a single contract from this solicitation. This acquisition will be set aside 100% for Small Businesses in accordance with FAR 19.502-2(a). Description: This RFQ solicits quotes for tree cutting services on approximately 22 acres located north of the HC-130 assault strip on Grand Bay Range, Moody AFB. The project involves felling trees that present obstacle height violations and critical safety concerns for aircraft operations. All fallen trees must be left on-site and cannot be sold or harvested due to the presence of embedded bullets and metal fragments. The selected contractor will be responsible for all labor, equipment, and disposal compliant with environmental regulations and base safety protocols. Several trees north of the HC-130 assault strip on Grand Bay Range, Moody AFB, exceed obstacle height limits and pose critical safety risks, necessitating an adjustment to the assault strip's landing threshold. This adjustment considerably reduces the usable airstrip length for short-field HC-130 operations. Approximately 22 acres of trees require cutting. The fallen trees must remain on-site and cannot be sold or harvested due to the possibility of embedded bullets and metal fragments. FOB Point: Destination (Bemiss Field on Grand Bay Range (GBR), Moody AFB, GA.) Period of Performance: It is anticipated the project will start within 15 calendar days of the award. All quoters must be registered with System for Award Management (SAM) and the online representation and certification in SAM must be completed. Information concerning SAM requirements may be viewed via the internet at https://www.sam.gov or by calling 866-606- 8220, or 334-206-7828 for international calls. Quoters that reject the terms and conditions of the solicitation may be excluded from consideration. The below listed FAR, Defense Federal Acquisition Regulation Supplement (DFARS), and Department of the Air Force Federal Acquisition Regulation Supplement (DAFFARS) clauses apply to this RFQ and will be incorporated into the resulting contract. All clauses may be viewed in full text via the internet at http://acquisition.gov. The Certificate of Compliance with Insurance Requirements (Attachment 4) applies to the solicitation. The following provisions and clauses will be incorporated: FAR 52.212-1 Instruction to Offerors Commercial Items FAR 52.212-2 Evaluation-Commercial Items Quotations shall contain the following information: RFQ Number Time Specified for Receipt of Quotations Name Address CAGE/UEI Telephone Number of Quoter Name and Email address of Representative authorized to discuss quote Any Discount Terms Acknowledgement of all Solicitation Amendments (if applicable). Quotations shall also include the following required documentation: Price: Quoted prices must be submitted using the Pricing Schedule at Attachment 7. Quoters shall insert unit prices in the attached pricing schedule, rounded to the nearest cent (for example $0.02 not $0.0231). Quoters rejecting the terms and conditions may be excluded from consideration. Note: Department of Labor (DOL) Wage Determination 2015-4493 Rev. 28, dated 05/23/2025, at Attachment 2, applies. Technical: The quoter must submit technical documentation that clearly demonstrates a complete and realistic plan to meet objectives stated in Parts I & II of the Statement of Work (SOW). The technical submission shall also include a mobilization plan and a timeline for completion of the requirement. The quoter shall also provide proof of insurance by completing Attachment 4. The technical documentation submitted for this Request for Quote shall be no more than ten (10) pages. Past Performance: Past Performance will be evaluated Acceptable or Unacceptable IAW FAR15.305(a)(2)(iv). An unknown or neutral past performance is considered acceptable. Evaluation: IAW FAR 52.212-2, Evaluation-Commercial Items, the Government will award a contract to the quoter who presents the best value continuum using Lowest Price-Technically Acceptable (LPTA). Award will be made to the lowest-priced proposal meeting or exceeding acceptable standards for non-price factors. These non-price factors will be Technical and Past Performance, and both will be rated on an Acceptable" or "Unacceptable" basis. Price: Evaluation of price will consider the total of the service to be provided. The CLIN price will be evaluated as the fully burdened price, rounded to the nearest cent. Offerors will be ranked from lowest to highest according to the total evaluated price. The two lowest priced proposals will be evaluated first. Technical: The Technical approach will be evaluated based on the quoters ability to meet the objectives stated in the SOW, mobilization plan, and timeline to complete requirement. Past Performance: Evaluation of past performance will consider past performance information obtained from any suitable source, such as Air Force automated past performance data bases (i.e. CPARS, PPIRS), direct local business experience with the quoter, or similar. A site visit will be held on 14 July 2025 at 2:00 PM EST. Interested vendors will meet at the 23d Contracting Squadron, 4380 Alabama Road, Moody AFB, GA 31699 (Attachment 9- Base Map). Parties will then proceed to the Grand Bay Range. If you wish to attend, fill out Attachment 5 - Base Pass Request and email it to the contracting POCs no later than 2:00 PM EST 8 July 2025. A government issued REAL ID is required for entrance into the installation. Questions and Answers: Should you have any questions about this requirement, please submit them no later than 2:00 PM EST 16 July 2025, all questions must be emailed to the POCs via Attachment 3. Answers to all questions will be posted to SAM.gov when the government has generated any and all answers. Should an amendment be necessary to allow for additional time, this solicitation may be extended with a later quotation due date. Response Time: Quotations will be accepted electronically no later than 2:00 PM EST on Tuesday, 29 July 2025. All quotations shall be marked with the RFQ number and title. Email quotations shall be sent to both the primary and alternate points of contact identified below. Primary Point of Contact: Connor-Marie Smith, Email: connor-marie.smith@us.af.mil, Phone 229-257-2811 Alternate Point of Contact: Ms. Amanda Richardson, Email: amanda.richardson.13@us.af.mil, Phone: 229- 460-4917 Wage Determination: IAW FAR 52.222-41 Wage Determination No.: 2015-4493 Rev. 28 Dated: 05/23/2025 applies and can be found at www.sam.gov ATTACHMENTS: Attachment 1 Statement of Work Attachment 2 Wage Determination 15-4493 Rev. 28 Attachment 3 Official Questions Form Attachment 4 - Required Insurance Compliance Attachment 5 Base Pass Request Attachment 6 Georgia Forestry Manual Attachment 7 Pricing Schedule Attachment 8 Provisions and Clauses Attachment 9- Base Map Amendment 001: The purpose of this is to extend the deadline to submit a Base Pass Request from 3 July to 8 July. Additionally to clarify this is a new requirement.

From Combined Synopsis/Solicitation posted on Jul 01, 2025

This is a combined synopsis and solicitation for a commercial service prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and A WRITTEN SOLICITATION WILL NOT BE ISSUED. The solicitation number for this procurement is FA483025Q0062 and it is issued as a Request for Quotation (RFQ). All References to offer or offeror in the clauses and provisions incorporated below are deemed to have the meaning of quotation and quoter respectively. Any quotation received in response to this RFQ is not binding until the contractor either signs the purchase order issued at time of award or starts of performance. The Government intends to evaluate quotations and award a single contract without discussions with Quoters; therefore, the Quoter s initial quotation should contain the Quoter s best terms from a price and technical standpoint. The Government does reserve the right to conduct discussions if deemed by the Contracting Officer to be in the best interest of the Government. This RFQ and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular (FAC) 2025-03, DFARS Change 01/17/2025, and DAFFARS Change 10/16/2024. In accordance with FAR 52.219-1 the North American Industry Classification System (NAICS) is 115310. The small business size standard is $11.5 million. The Government intends to award a single contract from this solicitation. This acquisition will be set aside 100% for Small Businesses in accordance with FAR 19.502-2(a). Description: This RFQ solicits quotes for tree cutting services on approximately 22 acres located north of the HC-130 assault strip on Grand Bay Range, Moody AFB. The project involves felling trees that present obstacle height violations and critical safety concerns for aircraft operations. All fallen trees must be left on-site and cannot be sold or harvested due to the presence of embedded bullets and metal fragments. The selected contractor will be responsible for all labor, equipment, and disposal compliant with environmental regulations and base safety protocols. Several trees north of the HC-130 assault strip on Grand Bay Range, Moody AFB, exceed obstacle height limits and pose critical safety risks, necessitating an adjustment to the assault strip's landing threshold. This adjustment considerably reduces the usable airstrip length for short-field HC-130 operations. Approximately 22 acres of trees require cutting. The fallen trees must remain on-site and cannot be sold or harvested due to the possibility of embedded bullets and metal fragments. FOB Point: Destination (Bemiss Field on Grand Bay Range (GBR), Moody AFB, GA.) Period of Performance: Grand Bay Range is anticipated to close for two (2) weeks in September or October. The exact timeframe will be coordinated between Contractor and Government post award. All quoters must be registered with System for Award Management (SAM) and the online representation and certification in SAM must be completed. Information concerning SAM requirements may be viewed via the internet at https://www.sam.gov or by calling 866-606- 8220, or 334-206-7828 for international calls. Quoters that reject the terms and conditions of the solicitation may be excluded from consideration. The below listed FAR, Defense Federal Acquisition Regulation Supplement (DFARS), and Department of the Air Force Federal Acquisition Regulation Supplement (DAFFARS) clauses apply to this RFQ and will be incorporated into the resulting contract. All clauses may be viewed in full text via the internet at http://acquisition.gov. The Certificate of Compliance with Insurance Requirements (Attachment 4) applies to the solicitation. The following provisions and clauses will be incorporated: FAR 52.212-1 Instruction to Offerors Commercial Items FAR 52.212-2 Evaluation-Commercial Items Quotations shall contain the following information: RFQ Number Time Specified for Receipt of Quotations Name Address CAGE/UEI Telephone Number of Quoter Name and Email address of Representative authorized to discuss quote Any Discount Terms Acknowledgement of all Solicitation Amendments (if applicable). Quotations shall also include the following required documentation: Price: Quoted prices must be submitted using the Pricing Schedule at Attachment 7. Quoters shall insert unit prices in the attached pricing schedule, rounded to the nearest cent (for example $0.02 not $0.0231). Quoters rejecting the terms and conditions may be excluded from consideration. Note: Department of Labor (DOL) Wage Determination 2015-4493 Rev. 28, dated 05/23/2025, at Attachment 2, applies. Technical: The quoter must submit technical documentation that clearly demonstrates a complete and realistic plan to meet objectives stated in Parts I & II of the Statement of Work (SOW). The technical submission shall also include a mobilization plan and a timeline for completion of the requirement. The quoter shall also provide proof of insurance by completing Attachment 4. The technical documentation submitted for this Request for Quote shall be no more than ten (10) pages. Past Performance: Past Performance will be evaluated Acceptable or Unacceptable IAW FAR15.305(a)(2)(iv). An unknown or neutral past performance is considered acceptable. Evaluation: IAW FAR 52.212-2, Evaluation-Commercial Items, the Government will award a contract to the quoter who presents the best value continuum using Lowest Price-Technically Acceptable (LPTA). Award will be made to the lowest-priced proposal meeting or exceeding acceptable standards for non-price factors. These non-price factors will be Technical and Past Performance, and both will be rated on an Acceptable" or "Unacceptable" basis. Price: Evaluation of price will consider the total of the service to be provided. The CLIN price will be evaluated as the fully burdened price, rounded to the nearest cent. Offerors will be ranked from lowest to highest according to the total evaluated price. The two lowest priced proposals will be evaluated first. Technical: The Technical approach will be evaluated based on the quoters ability to meet the objectives stated in the SOW, mobilization plan, and timeline to complete requirement. Past Performance: Evaluation of past performance will consider past performance information obtained from any suitable source, such as Air Force automated past performance data bases (i.e. CPARS, PPIRS), direct local business experience with the quoter, or similar. A site visit will be held on 14 July 2025 at 2:00 PM EST. Interested vendors will meet at the 23d Contracting Squadron, 4380 Alabama Road, Moody AFB, GA 31699 (Attachment 9- Base Map). Parties will then proceed to the Grand Bay Range. If you wish to attend, fill out Attachment 5 - Base Pass Request and email it to the contracting POCs no later than 2:00 PM EST 8 July 2025. A government issued REAL ID is required for entrance into the installation. Questions and Answers: Should you have any questions about this requirement, please submit them no later than 2:00 PM EST 16 July 2025, all questions must be emailed to the POCs via Attachment 3. Answers to all questions will be posted to SAM.gov when the government has generated any and all answers. Should an amendment be necessary to allow for additional time, this solicitation may be extended with a later quotation due date. Response Time: Quotations will be accepted electronically no later than 2:00 PM EST on Tuesday, 29 July 2025. All quotations shall be marked with the RFQ number and title. Email quotations shall be sent to both the primary and alternate points of contact identified below. Primary Point of Contact: Connor-Marie Smith, Email: connor-marie.smith@us.af.mil, Phone 229-257-2811 Alternate Point of Contact: Ms. Amanda Richardson, Email: amanda.richardson.13@us.af.mil, Phone: 229- 460-4917 Wage Determination: IAW FAR 52.222-41 Wage Determination No.: 2015-4493 Rev. 28 Dated: 05/23/2025 applies and can be found at www.sam.gov ATTACHMENTS: Attachment 1 Statement of Work Attachment 2 Wage Determination 15-4493 Rev. 28 Attachment 3 Official Questions Form Attachment 4 - Required Insurance Compliance Attachment 5 Base Pass Request Attachment 6 Georgia Forestry Manual Attachment 7 Pricing Schedule Attachment 8 Provisions and Clauses Attachment 9- Base Map Amendment 001: The purpose of this is to extend the deadline to submit a Base Pass Request from 3 July to 8 July. Additionally to clarify this is a new requirement. Amendment 002: Incorporation of Attachments 10- Q&A Responses, Attachment 11- Firebreak and Cutting Area Map, and change to Period of Performance verbiage.

From Combined Synopsis/Solicitation posted on Jul 17, 2025

This is a combined synopsis and solicitation for a commercial service prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and A WRITTEN SOLICITATION WILL NOT BE ISSUED. The solicitation number for this procurement is FA483025Q0062 and it is issued as a Request for Quotation (RFQ). All References to offer or offeror in the clauses and provisions incorporated below are deemed to have the meaning of quotation and quoter respectively. Any quotation received in response to this RFQ is not binding until the contractor either signs the purchase order issued at time of award or starts of performance. The Government intends to evaluate quotations and award a single contract without discussions with Quoters; therefore, the Quoter s initial quotation should contain the Quoter s best terms from a price and technical standpoint. The Government does reserve the right to conduct discussions if deemed by the Contracting Officer to be in the best interest of the Government. This RFQ and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular (FAC) 2025-03, DFARS Change 01/17/2025, and DAFFARS Change 10/16/2024. In accordance with FAR 52.219-1 the North American Industry Classification System (NAICS) is 115310. The small business size standard is $11.5 million. The Government intends to award a single contract from this solicitation. This acquisition will be set aside 100% for Small Businesses in accordance with FAR 19.502-2(a). Description: This RFQ solicits quotes for tree cutting services on approximately 22 acres located north of the HC-130 assault strip on Grand Bay Range, Moody AFB. The project involves felling trees that present obstacle height violations and critical safety concerns for aircraft operations. All fallen trees must be left on-site and cannot be sold or harvested due to the presence of embedded bullets and metal fragments. The selected contractor will be responsible for all labor, equipment, and disposal compliant with environmental regulations and base safety protocols. Several trees north of the HC-130 assault strip on Grand Bay Range, Moody AFB, exceed obstacle height limits and pose critical safety risks, necessitating an adjustment to the assault strip's landing threshold. This adjustment considerably reduces the usable airstrip length for short-field HC-130 operations. Approximately 22 acres of trees require cutting. The fallen trees must remain on-site and cannot be sold or harvested due to the possibility of embedded bullets and metal fragments. FOB Point: Destination (Bemiss Field on Grand Bay Range (GBR), Moody AFB, GA.) Period of Performance: Grand Bay Range is anticipated to close for two (2) weeks in September or October. The exact timeframe will be coordinated between Contractor and Government post award. All quoters must be registered with System for Award Management (SAM) and the online representation and certification in SAM must be completed. Information concerning SAM requirements may be viewed via the internet at https://www.sam.gov or by calling 866-606- 8220, or 334-206-7828 for international calls. Quoters that reject the terms and conditions of the solicitation may be excluded from consideration. The below listed FAR, Defense Federal Acquisition Regulation Supplement (DFARS), and Department of the Air Force Federal Acquisition Regulation Supplement (DAFFARS) clauses apply to this RFQ and will be incorporated into the resulting contract. All clauses may be viewed in full text via the internet at http://acquisition.gov. The Certificate of Compliance with Insurance Requirements (Attachment 4) applies to the solicitation. The following provisions and clauses will be incorporated: FAR 52.212-1 Instruction to Offerors Commercial Items FAR 52.212-2 Evaluation-Commercial Items Quotations shall contain the following information: RFQ Number Time Specified for Receipt of Quotations Name Address CAGE/UEI Telephone Number of Quoter Name and Email address of Representative authorized to discuss quote Any Discount Terms Acknowledgement of all Solicitation Amendments (if applicable). Quotations shall also include the following required documentation: Price: Quoted prices must be submitted using the Pricing Schedule at Attachment 7. Quoters shall insert unit prices in the attached pricing schedule, rounded to the nearest cent (for example $0.02 not $0.0231). Quoters rejecting the terms and conditions may be excluded from consideration. Note: Department of Labor (DOL) Wage Determination 2015-4493 Rev. 28, dated 05/23/2025, at Attachment 2, applies. Technical: The quoter must submit technical documentation that clearly demonstrates a complete and realistic plan to meet objectives stated in Parts I & II of the Statement of Work (SOW). The technical submission shall also include a mobilization plan and a timeline for completion of the requirement. The quoter shall also provide proof of insurance by completing Attachment 4. The technical documentation submitted for this Request for Quote shall be no more than ten (10) pages. Past Performance: Past Performance will be evaluated Acceptable or Unacceptable IAW FAR15.305(a)(2)(iv). An unknown or neutral past performance is considered acceptable. Evaluation: IAW FAR 52.212-2, Evaluation-Commercial Items, the Government will award a contract to the quoter who presents the best value continuum using Lowest Price-Technically Acceptable (LPTA). Award will be made to the lowest-priced proposal meeting or exceeding acceptable standards for non-price factors. These non-price factors will be Technical and Past Performance, and both will be rated on an Acceptable" or "Unacceptable" basis. Price: Evaluation of price will consider the total of the service to be provided. The CLIN price will be evaluated as the fully burdened price, rounded to the nearest cent. Offerors will be ranked from lowest to highest according to the total evaluated price. The two lowest priced proposals will be evaluated first. Technical: The Technical approach will be evaluated based on the quoters ability to meet the objectives stated in the SOW, mobilization plan, and timeline to complete requirement. Past Performance: Evaluation of past performance will consider past performance information obtained from any suitable source, such as Air Force automated past performance data bases (i.e. CPARS, PPIRS), direct local business experience with the quoter, or similar. A site visit will be held on 14 July 2025 at 2:00 PM EST. Interested vendors will meet at the 23d Contracting Squadron, 4380 Alabama Road, Moody AFB, GA 31699 (Attachment 9- Base Map). Parties will then proceed to the Grand Bay Range. If you wish to attend, fill out Attachment 5 - Base Pass Request and email it to the contracting POCs no later than 2:00 PM EST 8 July 2025. A government issued REAL ID is required for entrance into the installation. Questions and Answers: Should you have any questions about this requirement, please submit them no later than 2:00 PM EST 16 July 2025, all questions must be emailed to the POCs via Attachment 3. Answers to all questions will be posted to SAM.gov when the government has generated any and all answers. Should an amendment be necessary to allow for additional time, this solicitation may be extended with a later quotation due date. Response Time: Quotations will be accepted electronically no later than 2:00 PM EST on Tuesday, 29 July 2025. All quotations shall be marked with the RFQ number and title. Email quotations shall be sent to both the primary and alternate points of contact identified below. Primary Point of Contact: Connor-Marie Smith, Email: connor-marie.smith@us.af.mil, Phone 229-257-2811 Alternate Point of Contact: Ms. Amanda Richardson, Email: amanda.richardson.13@us.af.mil, Phone: 229- 460-4917 Wage Determination: IAW FAR 52.222-41 Wage Determination No.: 2015-4493 Rev. 28 Dated: 05/23/2025 applies and can be found at www.sam.gov ATTACHMENTS: Attachment 1 Statement of Work Attachment 2 Wage Determination 15-4493 Rev. 28 Attachment 3 Official Questions Form Attachment 4 - Required Insurance Compliance Attachment 5 Base Pass Request Attachment 6 Georgia Forestry Manual Attachment 7 Pricing Schedule Attachment 8 Provisions and Clauses Attachment 9- Base Map Attachment 10- REVISED Question and Answer responses 18 July 2025 Attachment 11- Firebreak and Cutting Area Map Amendment 001: The purpose of this is to extend the deadline to submit a Base Pass Request from 3 July to 8 July. Additionally to clarify this is a new requirement. Amendment 002: Incorporation of Attachments 10- Q&A Responses, Attachment 11- Firebreak and Cutting Area Map, and change to Period of Performance verbiage. Amendment 003: The purpose of Amendment 003 is to provide revised responses to Attachment 10 Q&A Responses.

From Combined Synopsis/Solicitation posted on Jul 18, 2025

This is a combined synopsis and solicitation for a commercial service prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and A WRITTEN SOLICITATION WILL NOT BE ISSUED. The solicitation number for this procurement is FA483025Q0062 and it is issued as a Request for Quotation (RFQ). All References to offer or offeror in the clauses and provisions incorporated below are deemed to have the meaning of quotation and quoter respectively. Any quotation received in response to this RFQ is not binding until the contractor either signs the purchase order issued at time of award or starts of performance. The Government intends to evaluate quotations and award a single contract without discussions with Quoters; therefore, the Quoter s initial quotation should contain the Quoter s best terms from a price and technical standpoint. The Government does reserve the right to conduct discussions if deemed by the Contracting Officer to be in the best interest of the Government. This RFQ and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular (FAC) 2025-03, DFARS Change 01/17/2025, and DAFFARS Change 10/16/2024. In accordance with FAR 52.219-1 the North American Industry Classification System (NAICS) is 115310. The small business size standard is $11.5 million. The Government intends to award a single contract from this solicitation. This acquisition will be set aside 100% for Small Businesses in accordance with FAR 19.502-2(a). Description: This RFQ solicits quotes for tree cutting services on approximately 22 acres located north of the HC-130 assault strip on Grand Bay Range, Moody AFB. The project involves felling trees that present obstacle height violations and critical safety concerns for aircraft operations. All fallen trees must be left on-site and cannot be sold or harvested due to the presence of embedded bullets and metal fragments. The selected contractor will be responsible for all labor, equipment, and disposal compliant with environmental regulations and base safety protocols. Several trees north of the HC-130 assault strip on Grand Bay Range, Moody AFB, exceed obstacle height limits and pose critical safety risks, necessitating an adjustment to the assault strip's landing threshold. This adjustment considerably reduces the usable airstrip length for short-field HC-130 operations. Approximately 22 acres of trees require cutting. The fallen trees must remain on-site and cannot be sold or harvested due to the possibility of embedded bullets and metal fragments. FOB Point: Destination (Bemiss Field on Grand Bay Range (GBR), Moody AFB, GA.) Period of Performance: Grand Bay Range is anticipated to close for two (2) weeks in September or October. The exact timeframe will be coordinated between Contractor and Government post award. All quoters must be registered with System for Award Management (SAM) and the online representation and certification in SAM must be completed. Information concerning SAM requirements may be viewed via the internet at https://www.sam.gov or by calling 866-606- 8220, or 334-206-7828 for international calls. Quoters that reject the terms and conditions of the solicitation may be excluded from consideration. The below listed FAR, Defense Federal Acquisition Regulation Supplement (DFARS), and Department of the Air Force Federal Acquisition Regulation Supplement (DAFFARS) clauses apply to this RFQ and will be incorporated into the resulting contract. All clauses may be viewed in full text via the internet at http://acquisition.gov. The Certificate of Compliance with Insurance Requirements (Attachment 4) applies to the solicitation. The following provisions and clauses will be incorporated: FAR 52.212-1 Instruction to Offerors Commercial Items FAR 52.212-2 Evaluation-Commercial Items Quotations shall contain the following information: RFQ Number Time Specified for Receipt of Quotations Name Address CAGE/UEI Telephone Number of Quoter Name and Email address of Representative authorized to discuss quote Any Discount Terms Acknowledgement of all Solicitation Amendments (if applicable). Quotations shall also include the following required documentation: Price: Quoted prices must be submitted using the Pricing Schedule at Attachment 7. Quoters shall insert unit prices in the attached pricing schedule, rounded to the nearest cent (for example $0.02 not $0.0231). Quoters rejecting the terms and conditions may be excluded from consideration. Note: Department of Labor (DOL) Wage Determination 2015-4493 Rev. 29, dated 7/08/2025, at Attachment 2, applies. Technical: The quoter must submit technical documentation that clearly demonstrates a complete and realistic plan to meet objectives stated in Parts I & II of the Statement of Work (SOW). The technical submission shall also include a mobilization plan and a timeline for completion of the requirement. The quoter shall also provide proof of insurance by completing Attachment 4. The technical documentation submitted for this Request for Quote shall be no more than ten (10) pages. Past Performance: Past Performance will be evaluated Acceptable or Unacceptable IAW FAR15.305(a)(2)(iv). An unknown or neutral past performance is considered acceptable. Evaluation: IAW FAR 52.212-2, Evaluation-Commercial Items, the Government will award a contract to the quoter who presents the best value continuum using Lowest Price-Technically Acceptable (LPTA). Award will be made to the lowest-priced proposal meeting or exceeding acceptable standards for non-price factors. These non-price factors will be Technical and Past Performance, and both will be rated on an Acceptable" or "Unacceptable" basis. Price: Evaluation of price will consider the total of the service to be provided. The CLIN price will be evaluated as the fully burdened price, rounded to the nearest cent. Offerors will be ranked from lowest to highest according to the total evaluated price. The two lowest priced proposals will be evaluated first. Technical: The Technical approach will be evaluated based on the quoters ability to meet the objectives stated in the SOW, mobilization plan, and timeline to complete requirement. Past Performance: Evaluation of past performance will consider past performance information obtained from any suitable source, such as Air Force automated past performance data bases (i.e. CPARS, PPIRS), direct local business experience with the quoter, or similar. A site visit will be held on 14 July 2025 at 2:00 PM EST. Interested vendors will meet at the 23d Contracting Squadron, 4380 Alabama Road, Moody AFB, GA 31699 (Attachment 9- Base Map). Parties will then proceed to the Grand Bay Range. If you wish to attend, fill out Attachment 5 - Base Pass Request and email it to the contracting POCs no later than 2:00 PM EST 8 July 2025. A government issued REAL ID is required for entrance into the installation. Questions and Answers: Should you have any questions about this requirement, please submit them no later than 2:00 PM EST 16 July 2025, all questions must be emailed to the POCs via Attachment 3. Answers to all questions will be posted to SAM.gov when the government has generated any and all answers. Should an amendment be necessary to allow for additional time, this solicitation may be extended with a later quotation due date. Response Time: Quotations will be accepted electronically no later than 2:00 PM EST on Tuesday, 29 July 2025. All quotations shall be marked with the RFQ number and title. Email quotations shall be sent to both the primary and alternate points of contact identified below. Primary Point of Contact: Connor-Marie Smith, Email: connor-marie.smith@us.af.mil, Phone 229-257-2811 Alternate Point of Contact: Ms. Amanda Richardson, Email: amanda.richardson.13@us.af.mil, Phone: 229- 460-4917 Wage Determination: IAW FAR 52.222-41 Wage Determination No.: 2015-4493 Rev. 29 Dated: 7/08/2025 applies and can be found at www.sam.gov ATTACHMENTS: Attachment 1 Statement of Work Attachment 2 Wage Determination 15-4493 Rev. 29 Attachment 3 Official Questions Form Attachment 4 - Required Insurance Compliance Attachment 5 Base Pass Request Attachment 6 Georgia Forestry Manual Attachment 7 Pricing Schedule Attachment 8 Provisions and Clauses Attachment 9- Base Map Attachment 10- REVISED Question and Answer responses 18 July 2025 Attachment 11- Firebreak and Cutting Area Map Amendment 001: The purpose of this is to extend the deadline to submit a Base Pass Request from 3 July to 8 July. Additionally to clarify this is a new requirement. Amendment 002: Incorporation of Attachments 10- Q&A Responses, Attachment 11- Firebreak and Cutting Area Map, and change to Period of Performance verbiage. Amendment 003: The purpose of Amendment 003 is to provide revised responses to Attachment 10 Q&A Responses. Amendment 004: The purpose of Amendment 004 is to update the Wage Determination to the 29th Revision, dated 7/08/2025.

From Combined Synopsis/Solicitation posted on Jul 23, 2025

This is a combined synopsis and solicitation for a commercial service prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and A WRITTEN SOLICITATION WILL NOT BE ISSUED. The solicitation number for this procurement is FA483025Q0062 and it is issued as a Request for Quotation (RFQ). All References to offer or offeror in the clauses and provisions incorporated below are deemed to have the meaning of quotation and quoter respectively. Any quotation received in response to this RFQ is not binding until the contractor either signs the purchase order issued at time of award or starts of performance. The Government intends to evaluate quotations and award a single contract without discussions with Quoters; therefore, the Quoter s initial quotation should contain the Quoter s best terms from a price and technical standpoint. The Government does reserve the right to conduct discussions if deemed by the Contracting Officer to be in the best interest of the Government. This RFQ and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular (FAC) 2025-03, DFARS Change 01/17/2025, and DAFFARS Change 10/16/2024. In accordance with FAR 52.219-1 the North American Industry Classification System (NAICS) is 115310. The small business size standard is $11.5 million. The Government intends to award a single contract from this solicitation. This acquisition will be set aside 100% for Small Businesses in accordance with FAR 19.502-2(a). Description: This RFQ solicits quotes for tree cutting services on approximately 22 acres located north of the HC-130 assault strip on Grand Bay Range, Moody AFB. The project involves felling trees that present obstacle height violations and critical safety concerns for aircraft operations. All fallen trees must be left on-site and cannot be sold or harvested due to the presence of embedded bullets and metal fragments. The selected contractor will be responsible for all labor, equipment, and disposal compliant with environmental regulations and base safety protocols. Several trees north of the HC-130 assault strip on Grand Bay Range, Moody AFB, exceed obstacle height limits and pose critical safety risks, necessitating an adjustment to the assault strip's landing threshold. This adjustment considerably reduces the usable airstrip length for short-field HC-130 operations. Approximately 22 acres of trees require cutting. The fallen trees must remain on-site and cannot be sold or harvested due to the possibility of embedded bullets and metal fragments. FOB Point: Destination (Bemiss Field on Grand Bay Range (GBR), Moody AFB, GA.) Period of Performance: Grand Bay Range is anticipated to close for two (2) weeks in September or October. The exact timeframe will be coordinated between Contractor and Government post award. All quoters must be registered with System for Award Management (SAM) and the online representation and certification in SAM must be completed. Information concerning SAM requirements may be viewed via the internet at https://www.sam.gov or by calling 866-606- 8220, or 334-206-7828 for international calls. Quoters that reject the terms and conditions of the solicitation may be excluded from consideration. The below listed FAR, Defense Federal Acquisition Regulation Supplement (DFARS), and Department of the Air Force Federal Acquisition Regulation Supplement (DAFFARS) clauses apply to this RFQ and will be incorporated into the resulting contract. All clauses may be viewed in full text via the internet at http://acquisition.gov. The Certificate of Compliance with Insurance Requirements (Attachment 4) applies to the solicitation. The following provisions and clauses will be incorporated: FAR 52.212-1 Instruction to Offerors Commercial Items FAR 52.212-2 Evaluation-Commercial Items Quotations shall contain the following information: RFQ Number Time Specified for Receipt of Quotations Name Address CAGE/UEI Telephone Number of Quoter Name and Email address of Representative authorized to discuss quote Any Discount Terms Acknowledgement of all Solicitation Amendments (if applicable). Quotations shall also include the following required documentation: Price: Quoted prices must be submitted using the Pricing Schedule at Attachment 7. Quoters shall insert unit prices in the attached pricing schedule, rounded to the nearest cent (for example $0.02 not $0.0231). Quoters rejecting the terms and conditions may be excluded from consideration. Note: Department of Labor (DOL) Wage Determination 2015-4493 Rev. 29, dated 7/08/2025, at Attachment 2, applies. Technical: The quoter must submit technical documentation that clearly demonstrates a complete and realistic plan to meet objectives stated in Parts I & II of the Statement of Work (SOW). The technical submission shall also include a mobilization plan and a timeline for completion of the requirement. The quoter shall also provide proof of insurance by completing Attachment 4. The technical documentation submitted for this Request for Quote shall be no more than ten (10) pages. Past Performance: Past Performance will be evaluated Acceptable or Unacceptable IAW FAR15.305(a)(2)(iv). An unknown or neutral past performance is considered acceptable. Evaluation: IAW FAR 52.212-2, Evaluation-Commercial Items, the Government will award a contract to the quoter who presents the best value continuum using Lowest Price-Technically Acceptable (LPTA). Award will be made to the lowest-priced proposal meeting or exceeding acceptable standards for non-price factors. These non-price factors will be Technical and Past Performance, and both will be rated on an Acceptable" or "Unacceptable" basis. Price: Evaluation of price will consider the total of the service to be provided. The CLIN price will be evaluated as the fully burdened price, rounded to the nearest cent. Offerors will be ranked from lowest to highest according to the total evaluated price. The two lowest priced proposals will be evaluated first. Technical: The Technical approach will be evaluated based on the quoters ability to meet the objectives stated in the SOW, mobilization plan, and timeline to complete requirement. Past Performance: Evaluation of past performance will consider past performance information obtained from any suitable source, such as Air Force automated past performance data bases (i.e. CPARS, PPIRS), direct local business experience with the quoter, or similar. A site visit will be held on 14 July 2025 at 2:00 PM EST. Interested vendors will meet at the 23d Contracting Squadron, 4380 Alabama Road, Moody AFB, GA 31699 (Attachment 9- Base Map). Parties will then proceed to the Grand Bay Range. If you wish to attend, fill out Attachment 5 - Base Pass Request and email it to the contracting POCs no later than 2:00 PM EST 8 July 2025. A government issued REAL ID is required for entrance into the installation. Questions and Answers: Should you have any questions about this requirement, please submit them no later than 2:00 PM EST 16 July 2025, all questions must be emailed to the POCs via Attachment 3. Answers to all questions will be posted to SAM.gov when the government has generated any and all answers. Should an amendment be necessary to allow for additional time, this solicitation may be extended with a later quotation due date. Response Time: Quotations will be accepted electronically no later than 2:00 PM EST on Thursday, 31 July 2025. All quotations shall be marked with the RFQ number and title. Email quotations shall be sent to both the primary and alternate points of contact identified below. Primary Point of Contact: Connor-Marie Smith, Email: connor-marie.smith@us.af.mil, Phone 229-257-2811 Alternate Point of Contact: Ms. Amanda Richardson, Email: amanda.richardson.13@us.af.mil, Phone: 229- 460-4917 Wage Determination: IAW FAR 52.222-41 Wage Determination No.: 2015-4493 Rev. 29 Dated: 7/08/2025 applies and can be found at www.sam.gov ATTACHMENTS: Attachment 1 Statement of Work Attachment 2 Wage Determination 15-4493 Rev. 29 Attachment 3 Official Questions Form Attachment 4 - Required Insurance Compliance Attachment 5 Base Pass Request Attachment 6 Georgia Forestry Manual Attachment 7 Pricing Schedule Attachment 8 Provisions and Clauses Attachment 9- Base Map Attachment 10- REVISED Question and Answer responses 18 July 2025 Attachment 11- Firebreak and Cutting Area Map Amendment 001: The purpose of this is to extend the deadline to submit a Base Pass Request from 3 July to 8 July. Additionally to clarify this is a new requirement. Amendment 002: Incorporation of Attachments 10- Q&A Responses, Attachment 11- Firebreak and Cutting Area Map, and change to Period of Performance verbiage. Amendment 003: The purpose of Amendment 003 is to provide revised responses to Attachment 10 Q&A Responses. Amendment 004: The purpose of Amendment 004 is to update the Wage Determination to the 29th Revision, dated 7/08/2025. Amendment 005: The purpose of Amendment 005 is to extend the RFQ deadline to 2:00PM EST July 31, 2025, and to update the solicitation attachment titled "Solicitation Amendment - FA483025Q00620001".

From Combined Synopsis/Solicitation posted on Jul 28, 2025

This is a combined synopsis and solicitation for a commercial service prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and A WRITTEN SOLICITATION WILL NOT BE ISSUED. The solicitation number for this procurement is FA483025Q0062 and it is issued as a Request for Quotation (RFQ). All References to offer or offeror in the clauses and provisions incorporated below are deemed to have the meaning of quotation and quoter respectively. Any quotation received in response to this RFQ is not binding until the contractor either signs the purchase order issued at time of award or starts of performance. The Government intends to evaluate quotations and award a single contract without discussions with Quoters; therefore, the Quoter s initial quotation should contain the Quoter s best terms from a price and technical standpoint. The Government does reserve the right to conduct discussions if deemed by the Contracting Officer to be in the best interest of the Government. This RFQ and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular (FAC) 2025-03, DFARS Change 01/17/2025, and DAFFARS Change 10/16/2024. In accordance with FAR 52.219-1 the North American Industry Classification System (NAICS) is 115310. The small business size standard is $11.5 million. The Government intends to award a single contract from this solicitation. This acquisition will be set aside 100% for Small Businesses in accordance with FAR 19.502-2(a). Description: This RFQ solicits quotes for tree cutting services on approximately 22 acres located north of the HC-130 assault strip on Grand Bay Range, Moody AFB. The project involves felling trees that present obstacle height violations and critical safety concerns for aircraft operations. All fallen trees must be left on-site and cannot be sold or harvested due to the presence of embedded bullets and metal fragments. The selected contractor will be responsible for all labor, equipment, and disposal compliant with environmental regulations and base safety protocols. Several trees north of the HC-130 assault strip on Grand Bay Range, Moody AFB, exceed obstacle height limits and pose critical safety risks, necessitating an adjustment to the assault strip's landing threshold. This adjustment considerably reduces the usable airstrip length for short-field HC-130 operations. Approximately 22 acres of trees require cutting. The fallen trees must remain on-site and cannot be sold or harvested due to the possibility of embedded bullets and metal fragments. FOB Point: Destination (Bemiss Field on Grand Bay Range (GBR), Moody AFB, GA.) Period of Performance: Grand Bay Range is anticipated to close for two (2) weeks in September or October. The exact timeframe will be coordinated between Contractor and Government post award. All quoters must be registered with System for Award Management (SAM) and the online representation and certification in SAM must be completed. Information concerning SAM requirements may be viewed via the internet at https://www.sam.gov or by calling 866-606- 8220, or 334-206-7828 for international calls. Quoters that reject the terms and conditions of the solicitation may be excluded from consideration. The below listed FAR, Defense Federal Acquisition Regulation Supplement (DFARS), and Department of the Air Force Federal Acquisition Regulation Supplement (DAFFARS) clauses apply to this RFQ and will be incorporated into the resulting contract. All clauses may be viewed in full text via the internet at http://acquisition.gov. The Certificate of Compliance with Insurance Requirements (Attachment 4) applies to the solicitation. The following provisions and clauses will be incorporated: FAR 52.212-1 Instruction to Offerors Commercial Items FAR 52.212-2 Evaluation-Commercial Items Quotations shall contain the following information: RFQ Number Time Specified for Receipt of Quotations Name Address CAGE/UEI Telephone Number of Quoter Name and Email address of Representative authorized to discuss quote Any Discount Terms Acknowledgement of all Solicitation Amendments (if applicable). Quotations shall also include the following required documentation: Price: Quoted prices must be submitted using the Pricing Schedule at Attachment 7. Quoters shall insert unit prices in the attached pricing schedule, rounded to the nearest cent (for example $0.02 not $0.0231). Quoters rejecting the terms and conditions may be excluded from consideration. Note: Department of Labor (DOL) Wage Determination 2015-4493 Rev. 29, dated 7/08/2025, at Attachment 2, applies. Technical: The quoter must submit technical documentation that clearly demonstrates a complete and realistic plan to meet objectives stated in Parts I & II of the Statement of Work (SOW). The technical submission shall also include a mobilization plan and a timeline for completion of the requirement. The quoter shall also provide proof of insurance by completing Attachment 4. The technical documentation submitted for this Request for Quote shall be no more than ten (10) pages. Past Performance: Past Performance will be evaluated Acceptable or Unacceptable IAW FAR15.305(a)(2)(iv). An unknown or neutral past performance is considered acceptable. Evaluation: IAW FAR 52.212-2, Evaluation-Commercial Items, the Government will award a contract to the quoter who presents the best value continuum using Lowest Price-Technically Acceptable (LPTA). Award will be made to the lowest-priced proposal meeting or exceeding acceptable standards for non-price factors. These non-price factors will be Technical and Past Performance, and both will be rated on an Acceptable" or "Unacceptable" basis. Price: Evaluation of price will consider the total of the service to be provided. The CLIN price will be evaluated as the fully burdened price, rounded to the nearest cent. Offerors will be ranked from lowest to highest according to the total evaluated price. The two lowest priced proposals will be evaluated first. Technical: The Technical approach will be evaluated based on the quoters ability to meet the objectives stated in the SOW, mobilization plan, and timeline to complete requirement. Past Performance: Evaluation of past performance will consider past performance information obtained from any suitable source, such as Air Force automated past performance data bases (i.e. CPARS, PPIRS), direct local business experience with the quoter, or similar. A site visit will be held on 14 July 2025 at 2:00 PM EST. Interested vendors will meet at the 23d Contracting Squadron, 4380 Alabama Road, Moody AFB, GA 31699 (Attachment 9- Base Map). Parties will then proceed to the Grand Bay Range. If you wish to attend, fill out Attachment 5 - Base Pass Request and email it to the contracting POCs no later than 2:00 PM EST 8 July 2025. A government issued REAL ID is required for entrance into the installation. Questions and Answers: Should you have any questions about this requirement, please submit them no later than 2:00 PM EST 16 July 2025, all questions must be emailed to the POCs via Attachment 3. Answers to all questions will be posted to SAM.gov when the government has generated any and all answers. Should an amendment be necessary to allow for additional time, this solicitation may be extended with a later quotation due date. Response Time: Quotations will be accepted electronically no later than 2:00 PM EST on Thursday, 31 July 2025. All quotations shall be marked with the RFQ number and title. Email quotations shall be sent to both the primary and alternate points of contact identified below. Primary Point of Contact: Connor-Marie Smith, Email: connor-marie.smith@us.af.mil, Phone 229-257-2811 Alternate Point of Contact: Ms. Amanda Richardson, Email: amanda.richardson.13@us.af.mil, Phone: 229- 460-4917 Wage Determination: IAW FAR 52.222-41 Wage Determination No.: 2015-4493 Rev. 29 Dated: 7/08/2025 applies and can be found at www.sam.gov ATTACHMENTS: Attachment 1 Statement of Work Attachment 2 Wage Determination 15-4493 Rev. 29 Attachment 3 Official Questions Form Attachment 4 - Required Insurance Compliance Attachment 5 Base Pass Request Attachment 6 Georgia Forestry Manual Attachment 7 Pricing Schedule Attachment 8 Provisions and Clauses Attachment 9- Base Map Attachment 10- REVISED Question and Answer responses 28 July 2025 Attachment 11- Firebreak and Cutting Area Map Amendment 001: The purpose of this is to extend the deadline to submit a Base Pass Request from 3 July to 8 July. Additionally to clarify this is a new requirement. Amendment 002: Incorporation of Attachments 10- Q&A Responses, Attachment 11- Firebreak and Cutting Area Map, and change to Period of Performance verbiage. Amendment 003: The purpose of Amendment 003 is to provide revised responses to Attachment 10 Q&A Responses. Amendment 004: The purpose of Amendment 004 is to update the Wage Determination to the 29th Revision, dated 7/08/2025. Amendment 005: The purpose of Amendment 005 is to extend the RFQ deadline to 2:00PM EST July 31, 2025, and to update the solicitation attachment titled "Solicitation Amendment - FA483025Q00620001". Amendment 006: The purpose of Amendment 006 is to provide clarification to Attachment 10 Q&A Responses.

From Combined Synopsis/Solicitation posted on Jul 29, 2025

Notice history

7
  1. Combined Synopsis/Solicitation Posted Jun 27, 2025 View
  2. Combined Synopsis/Solicitation Posted Jul 01, 2025
    • Description: Description was updated
  3. Combined Synopsis/Solicitation Posted Jul 17, 2025
    • Description: Description was updated
  4. Combined Synopsis/Solicitation Posted Jul 18, 2025
    • Description: Description was updated
  5. Combined Synopsis/Solicitation Posted Jul 23, 2025
    • Description: Description was updated
  6. Combined Synopsis/Solicitation Posted Jul 28, 2025
    • Description: Description was updated
    • Response Deadline: Jul 29, 2025Jul 31, 2025
  7. Combined Synopsis/Solicitation LATEST Posted Jul 29, 2025
    • Description: Description was updated

Details

Solicitation number FA483025Q0062
Notice ID eab5ddede13949f8a5f63b5169164a29
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) F014
NAICS 115310
Place of performance Fort Moore, Georgia
Archive date Aug 15, 2025

Award Information

Not yet awarded

Contacts

primary
Connor-Marie Smith

Email

Phone

secondary
Amanda Richardson

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR COMBAT COMMAND
FA4830 23 CONS CC

Place of Performance

Fort Moore, Georgia 31699
USA

Dates

Posted Jul 29, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 31, 2025 1 year ago