Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 3 notices 5 documents

Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction 1240LU25Q0041

Solicitation 1240LU25Q0041 Copied Notice ID 9225d0660b194e11980e0f32144b7df1 Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA INTERMOUNTAIN 9
SAM.gov
Posted
Aug 21, 2025
Deadline
Sep 16, 2025
Set-aside
SBA
NAICS
238990
PSC
5660

Summary

AI-generated · Aug 24, 2025

Remove and reconstruct a 4-wire disaster-relief fence system on Forest Service land, including all associated braces and gates. Forest Service will provide fence materials; the contractor must furnish all labor, equipment, transportation, and supplies to remove existing components (wire, T-posts, line/corner braces, and line posts) and install the new fence with steel posts, three top barbed wires and one bottom smooth wire, plus single and double brace replacements. Include installation of a 14-foot swing gate and a 12-foot wire gate, with any required removal and replacement of a post-and-rail fence as indicated in the pay items; mobilization and all other listed tasks are included in the contract.

Location is the Horse Prairie Cabin area near Dillon, MT. A site visit is encouraged under standard site investigation procedures, but no official site visit will be conducted; contractors should assess access and weather conditions that could affect travel. The project is estimated at $25,000 to $100,000 and has a roughly one-year performance window, starting in fall and ending in late 2026, subject to an approved work schedule.

C.1 SCOPE OF CONTRACT The intent of the contract is to provide for the construction of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service. The work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction. Work covered under each Pay Item in the Schedule of Items includes: Pay Item No. 1 Mobilization: The work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Pay Item No. 1 Remove wire posts and stays: The work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands Pay Item No. 2 Replace wire posts and stays: The work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs. Pay Item No. 3 Remove and replace single brace: The work shall consist of the removal and construction of single braces. See Specifications for installation specs. Pay Item No. 4 Remove and replace double brace: The work shall consist of the removal and construction of double braces. See Specifications for installation specs. Pay Item No. 5 Installation of 14ft swing Gate: The work shall consist of the installation of a 14-foot swing gate. Pay Item No. 6 Removal and replacement of 12ft wire gate: The work shall consist of the Removal and replacement of 12ft wire gate. Pay Item No. 7 Removal and replacement of post and rail fence: The work shall consist of the installation of a 12-foot wire gate. C.2 PROJECT LOCATION Horse Prairie Cabin 420 Barrett St, Dillon MT 59725 C.3 MAGNITUDE OF CONSTRUCTION PROJECT Between $25,000 and $100,000. C.4 SITE VISIT Per FAR Part 52.236-3 Site Investigation and Conditions Affecting the Work , contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads. C.5 PERIOD OF PERFORMANCE Work on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.

From Combined Synopsis/Solicitation posted on Aug 21, 2025

C.1 SCOPE OF CONTRACT The intent of the contract is to provide for the construction of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service. The work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction. Work covered under each Pay Item in the Schedule of Items includes: Pay Item No. 1 Mobilization: The work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Pay Item No. 1 Remove wire posts and stays: The work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands Pay Item No. 2 Replace wire posts and stays: The work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs. Pay Item No. 3 Remove and replace single brace: The work shall consist of the removal and construction of single braces. See Specifications for installation specs. Pay Item No. 4 Remove and replace double brace: The work shall consist of the removal and construction of double braces. See Specifications for installation specs. Pay Item No. 5 Installation of 14ft swing Gate: The work shall consist of the installation of a 14-foot swing gate. Pay Item No. 6 Removal and replacement of 12ft wire gate: The work shall consist of the Removal and replacement of 12ft wire gate. Pay Item No. 7 Removal and replacement of post and rail fence: The work shall consist of the installation of a 12-foot wire gate. C.2 PROJECT LOCATION Horse Prairie Cabin 420 Barrett St, Dillon MT 59725 C.3 MAGNITUDE OF CONSTRUCTION PROJECT Between $25,000 and $100,000. C.4 SITE VISIT Per FAR Part 52.236-3 Site Investigation and Conditions Affecting the Work , contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads. C.5 PERIOD OF PERFORMANCE Work on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.

From Combined Synopsis/Solicitation posted on Aug 25, 2025

Amendment 0001 09/05/2025: Add Questions and Answers document Add document: 5 Big hollow disaster fence location Add document: 6- Example Fence Segment Condition Pictures C.1 SCOPE OF CONTRACT The intent of the contract is to provide for the construction of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service. The work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction. Work covered under each Pay Item in the Schedule of Items includes: Pay Item No. 1 Mobilization: The work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Pay Item No. 1 Remove wire posts and stays: The work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands Pay Item No. 2 Replace wire posts and stays: The work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs. Pay Item No. 3 Remove and replace single brace: The work shall consist of the removal and construction of single braces. See Specifications for installation specs. Pay Item No. 4 Remove and replace double brace: The work shall consist of the removal and construction of double braces. See Specifications for installation specs. Pay Item No. 5 Installation of 14ft swing Gate: The work shall consist of the installation of a 14-foot swing gate. Pay Item No. 6 Removal and replacement of 12ft wire gate: The work shall consist of the Removal and replacement of 12ft wire gate. Pay Item No. 7 Removal and replacement of post and rail fence: The work shall consist of the installation of a 12-foot wire gate. C.2 PROJECT LOCATION Horse Prairie Cabin 420 Barrett St, Dillon MT 59725 C.3 MAGNITUDE OF CONSTRUCTION PROJECT Between $25,000 and $100,000. C.4 SITE VISIT Per FAR Part 52.236-3 Site Investigation and Conditions Affecting the Work , contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads. C.5 PERIOD OF PERFORMANCE Work on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.

From Combined Synopsis/Solicitation posted on Sep 05, 2025

Notice history

3
  1. Combined Synopsis/Solicitation Posted Aug 21, 2025
  2. Combined Synopsis/Solicitation Posted Aug 25, 2025
    No changes from previous notice
  3. Combined Synopsis/Solicitation LATEST Posted Sep 05, 2025
    • Description: Description was updated

Details

Solicitation number 1240LU25Q0041
Notice ID 9225d0660b194e11980e0f32144b7df1
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 5660
NAICS 238990
Place of performance Dillon, Montana
Archive date Oct 01, 2025

Award Information

Not yet awarded

Contacts

primary
Daniel Franco

Email

Phone

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA INTERMOUNTAIN 9

Place of Performance

Dillon, Montana 59725
USA

Dates

Posted Aug 21, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 16, 2025 10 months ago