Beaver Lake Dam Rehabilitation at Mark Twain National Forest 12363N25Q4227
Summary
AI-generated · Sep 04, 2025Beaver Lake Dam Rehabilitation at Mark Twain National Forest involves repairing a failed piping and control structure that caused the water surface to drop about 7 feet. The project replaces the existing corrugated metal piping with reinforced concrete piping to restore stability and flow.
Additionally, a new filter drain, a plunge pool, and a new control structure will be constructed, and a modular retaining wall will be built to provide access to the control structure.
The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.
From Combined Synopsis/Solicitation posted on Sep 03, 2025The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.
From Combined Synopsis/Solicitation posted on Sep 04, 2025The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.
From Combined Synopsis/Solicitation posted on Sep 09, 2025The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure.
From Combined Synopsis/Solicitation posted on Sep 15, 2025Notice history
4-
-
Combined Synopsis/Solicitation Posted Sep 04, 2025No changes from previous notice
-
Combined Synopsis/Solicitation Posted Sep 09, 2025No changes from previous notice
-
Combined Synopsis/Solicitation LATEST Posted Sep 15, 2025No changes from previous notice