Bean Ridge Tower Remediation 6973GH-26-R-00074

Solicitation 6973GH-26-R-00074 Copied Notice ID 9868a00c1a224fa2ae556b671d8091df Copied TRANSPORTATION, DEPARTMENT OF — 6973GH FRANCHISE ACQUISITION SVCS
SAM.gov
Posted
Feb 10, 2026
Deadline
Feb 18, 2026
Set-aside
SBA
NAICS
237130
PSC
Z2BG

Summary

AI-generated · Feb 11, 2026

Implement tensioning of the guy wire system, install guy wire bracket assemblies, install tower lightning protection, perform corrosion abatement, and complete minor repairs to properly tension the designated USFS communication tower. All work must conform to applicable industry standards for the specific tower, and the contractor must furnish all labor, tools, equipment, materials, and the necessary technical expertise to complete the tasks.

The scope of this contract includes the implementation of guy system tensioning, installation of guy wire bracket assemblies, tower lightning protection, corrosion abatement, and any minor repairs necessary to properly tension the designated USFS communication tower. All work shall conform to applicable industry standards relevant to the specific tower structure identified. The selected contractor is responsible for furnishing all labor, tools, equipment, materials, and technical expertise necessary to complete the tasks.

From Solicitation posted on Feb 10, 2026

UPDATE (1) One - ADDITIONAL PHOTOS 6973GH-26-R-00074. The purpose of this update is to respond to an Request for Information (RFI) for Pre-Bid Site Walk-thru and additional site photos. There will not be an opportunity for a pre bid site walk-thru. Additional site photos are hereby provided as attatchment "Bean Ridge Photo Deck. 2". All other terms and conditions remain in full force and effect. ---------------------------------------------------------------------------------------------------------------------------------------------------------------- The scope of this contract includes the implementation of guy system tensioning, installation of guy wire bracket assemblies, tower lightning protection, corrosion abatement, and any minor repairs necessary to properly tension the designated USFS communication tower. All work shall conform to applicable industry standards relevant to the specific tower structure identified. The selected contractor is responsible for furnishing all labor, tools, equipment, materials, and technical expertise necessary to complete the tasks.

From Solicitation posted on Feb 11, 2026

UPDATE (1) One - ADDITIONAL PHOTOS 6973GH-26-R-00074. The purpose of this update is to respond to an Request for Information (RFI) for Pre-Bid Site Walk-thru and additional site photos. - There will not be an opportunity for a pre bid site walk-thru. - Additional site photos are hereby provided as attatchment "Bean Ridge Photo Deck. 2". All other terms and conditions remain in full force and effect. ---------------------------------------------------------------------------------------------------------------------------------------------------------------- The scope of this contract includes the implementation of guy system tensioning, installation of guy wire bracket assemblies, tower lightning protection, corrosion abatement, and any minor repairs necessary to properly tension the designated USFS communication tower. All work shall conform to applicable industry standards relevant to the specific tower structure identified. The selected contractor is responsible for furnishing all labor, tools, equipment, materials, and technical expertise necessary to complete the tasks.

From Solicitation posted on Feb 12, 2026

UPDATE (2) Two - RFIs / Responses and ADDITIONAL PHOTOS - 6973GH-26-R-00074. SOW Requirement 2.b, Repairs, bullet 5 states: Install new security wire on the perimeter fence of the compound. Can the Government confirm that torque arm assemblies are the preferred solution to this requirement? If not, please confirm if 3-runs of barbed wire across the top of the fence is an acceptable solution? Replace existing barbed wire at the top of the compound fence with new barbed wire. Picture of existing attached. SOW Requirement 2.e, Site Specific Requirements, bullet 1 states: Installation of four guy wire bracket assemblies on tower. Question: Can the Government provide additional information on the current brackets such as make/model or provide a product cut sheet? No brackets are currently installed, and guy wires are wrapped around the tower leg. The requirement is for four new Rohn 55 guy bracket assemblies to be installed. Picture of existing guy attachment attached. SOW Requirement 2.e, bullet 5 states: Remove and trim excess transmission line as required and re-terminate the line. Question: Are the current connectors re-usable? No If not, can the Government provide the current connector brand model and connector type? The connector brand model and type is not currently available. UPDATE (1) One - ADDITIONAL PHOTOS 6973GH-26-R-00074. The purpose of this update is to respond to an Request for Information (RFI) for Pre-Bid Site Walk-thru and additional site photos. There will not be an opportunity for a pre bid site walk-thru. Additional site photos are hereby provided as attatchment "Bean Ridge Photo Deck. 2". All other terms and conditions remain in full force and effect. ---------------------------------------------------------------------------------------------------------------------------------------------------------------- The scope of this contract includes the implementation of guy system tensioning, installation of guy wire bracket assemblies, tower lightning protection, corrosion abatement, and any minor repairs necessary to properly tension the designated USFS communication tower. All work shall conform to applicable industry standards relevant to the specific tower structure identified. The selected contractor is responsible for furnishing all labor, tools, equipment, materials, and technical expertise necessary to complete the tasks.

From Solicitation posted on Feb 17, 2026

Notice history

4
  1. Solicitation Posted Feb 10, 2026
  2. Solicitation Posted Feb 11, 2026
    • Title: Bean Ridge Tower Remediation*UPDATE - Bean Ridge Tower Remediation - ADDITIONAL PHOTOS
    • Description: Description was updated
  3. Solicitation Posted Feb 12, 2026
    • Description: Description was updated
  4. Solicitation LATEST Posted Feb 17, 2026
    • Title: *UPDATE - Bean Ridge Tower Remediation - ADDITIONAL PHOTOS*UPDATE - Bean Ridge Tower Remediation - RFI / Responses and ADDITIONAL PHOTOS
    • Description: Description was updated
    • Response Deadline: Feb 18, 2026Feb 24, 2026

Details

Solicitation number 6973GH-26-R-00074
Notice ID 9868a00c1a224fa2ae556b671d8091df
Notice type Solicitation
Product / Service (PSC) Z2BG
NAICS 237130
Place of performance Thebes, Illinois
Archive date Mar 05, 2026

Award Information

Not yet awarded

Contacts

primary
Edward Wright

Email

Phone

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL AVIATION ADMINISTRATION
6973GH FRANCHISE ACQUISITION SVCS

Place of Performance

Thebes, Illinois 62990
USA

Dates

Posted Feb 10, 2026 5 months ago
Last Updated Aug 06, 2026 1 day ago
Due Feb 18, 2026 5 months ago