Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 3 notices 16 documents

Beamline M1 Mirrors AM202505-13

Solicitation AM202505-13 Copied Notice ID b9619012738147f4a4b27fed37eab46c Copied ENERGY, DEPARTMENT OF — BERKELEY NATL LAB - DOE CONTRACTOR
SAM.gov
Posted
Sep 04, 2025
Deadline
Sep 25, 2025
Set-aside
NONE
NAICS
334510
PSC
5860

Summary

AI-generated · Aug 24, 2025

Proposals are sought for Beamline M1 mirrors to support Lawrence Berkeley National Laboratory’s ALS-U upgrade of the Advanced Light Source. The upgraded facility will use an MBA lattice to produce a soft X-ray source that is orders of magnitude brighter, with up to 100–1000 times higher brightness and a significantly larger fraction of coherent light in the soft X-ray region.

The existing ALS infrastructure—including up to 40 beamlines, an experimental hall, computing resources, ancillary laboratories, offices, and related facilities—will be heavily leveraged in the upgrade, underscoring the critical role of Beamline M1 mirrors in delivering the enhanced performance. No specific special requirements are listed in the description.

Lawrence Berkeley National Laboratory ( University or LBNL ) requests a proposal for Beamline M1 Mirrors. ALS-U is an upgrade project to the LBNL Advanced Light Source. The ALS is a 1.9 GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. The ALS facility includes an accelerator complex and photon delivery system that is capable of providing the foundations for an upgrade that will achieve world-leading soft x-ray coherent flux. The existing ALS provides a ready-made foundation, including conventional facilities and also includes extensive beamlines (up to 40 simultaneously operating beamlines) and instrumentation, an experimental hall, computing resources, ancillary laboratories, offices, and related infrastructure that will be heavily utilized in an upgrade scenario. The ALS will be upgraded with an MBA lattice design that will provide a soft x-ray source that is orders of magnitudes brighter an up to 100-1000 times increase in brightness and will provide a significantly higher fraction of coherent light in the soft x-ray region than is currently available at ALS.

From Solicitation posted on Jul 11, 2025

Lawrence Berkeley National Laboratory ( University or LBNL ) requests a proposal for Beamline M1 Mirrors. ALS-U is an upgrade project to the LBNL Advanced Light Source. The ALS is a 1.9 GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. The ALS facility includes an accelerator complex and photon delivery system that is capable of providing the foundations for an upgrade that will achieve world-leading soft x-ray coherent flux. The existing ALS provides a ready-made foundation, including conventional facilities and also includes extensive beamlines (up to 40 simultaneously operating beamlines) and instrumentation, an experimental hall, computing resources, ancillary laboratories, offices, and related infrastructure that will be heavily utilized in an upgrade scenario. The ALS will be upgraded with an MBA lattice design that will provide a soft x-ray source that is orders of magnitudes brighter an up to 100-1000 times increase in brightness and will provide a significantly higher fraction of coherent light in the soft x-ray region than is currently available at ALS.

From Solicitation posted on Aug 28, 2025

Amendment 1 is hereby issued to this RFQ on September 4, 2025 to extend the Proposal Due Date until September 25, 2025. All other terms of this RFQ remain the same. Please ensure that you have reviewed all attachments. _____________________________________________________________________ Lawrence Berkeley National Laboratory ( University or LBNL ) requests a proposal for Beamline M1 Mirrors. ALS-U is an upgrade project to the LBNL Advanced Light Source. The ALS is a 1.9 GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. The ALS facility includes an accelerator complex and photon delivery system that is capable of providing the foundations for an upgrade that will achieve world-leading soft x-ray coherent flux. The existing ALS provides a ready-made foundation, including conventional facilities and also includes extensive beamlines (up to 40 simultaneously operating beamlines) and instrumentation, an experimental hall, computing resources, ancillary laboratories, offices, and related infrastructure that will be heavily utilized in an upgrade scenario. The ALS will be upgraded with an MBA lattice design that will provide a soft x-ray source that is orders of magnitudes brighter an up to 100-1000 times increase in brightness and will provide a significantly higher fraction of coherent light in the soft x-ray region than is currently available at ALS.

From Solicitation posted on Sep 04, 2025

Notice history

3
  1. Solicitation Posted Jul 11, 2025 View
  2. Solicitation Posted Aug 28, 2025
    No changes from previous notice
  3. Solicitation LATEST Posted Sep 04, 2025
    • Description: Description was updated
    • Response Deadline: Sep 02, 2025Sep 25, 2025

Details

Solicitation number AM202505-13
Notice ID b9619012738147f4a4b27fed37eab46c
Notice type Solicitation
Product / Service (PSC) 5860
NAICS 334510
Set-aside No Set aside used
Place of performance Berkeley, California
Archive date Oct 10, 2025

Award Information

Not yet awarded

Contacts

primary
Anita Mathias

Email

Phone

secondary
Brian Zatkow

Email

Phone

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
BERKELEY NATL LAB - DOE CONTRACTOR

Place of Performance

Berkeley, California 94720
USA

Dates

Posted Sep 04, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 25, 2025 10 months ago