AI-generated · Apr 24, 2026Remodel two bathrooms with a focus on plumbing and tiling. Dismantle and dispose of the existing bathtub and tiles, relocate fittings, and install shower cabins. Shower trays must be installed with the lowest possible rim height above the finished floor to maximize accessibility and ease of entry.
Tiling and drywall work included: remove and dispose of old tiles, prepare surfaces (plastering, moisture insulation, wall leveling, leveling screed), construct drywall, and tile the floor and walls. The project is estimated to range from $25,000 to $100,000.
This tender specification covers the plumbing and tiling works for 2 bathrooms. Shower trays shall be installed to achieve the minimum possible rim height above the finished floor level to maximize accessibility and ease of entry. The work consists of, but is not limited to the following: - Dismantling + disposal of bathtub, tiles - Plumbing installations: Delivery Update and relocate fittings Installation and assembly of shower cabins - Tiling and drywall work: Removal and disposal of tiles Prepare surfaces including plastering work, moisture insulation, wall leveling, leveling screed Construction of a drywall Tiling of floor and wall Estimated size of the project according to FAR 36.204 is between $25,000 and $100,000.
From Presolicitation posted on Apr 23, 2026This tender specification covers the plumbing and tiling works for a total of 4 bathrooms, 2 of which in one residential location. Shower trays shall be installed to achieve the minimum possible rim height above the finished floor level to maximize accessibility and ease of entry. The work consists of, but is not limited to the following: - Dismantling + disposal of bathtub, tiles - Dismantling, temporary interim storage and reinstallation of sink and mirror cabinet - Plumbing installations: Delivery Update and relocate fittings Installation and assembly of shower cabins - Tiling and drywall work: Removal and disposal of tiles Prepare surfaces including plastering work, moisture insulation, wall leveling, leveling screed Construction of a drywall Tiling of floor and wall All according to detailed Specifications / SoW attached. Estimated size of the project according to FAR 36.204 is between $25,000 and $100,000.
From Solicitation posted on May 20, 2026Notice history
2-
Presolicitation Posted Apr 23, 2026
-
Solicitation LATEST Posted May 20, 2026View changes (4)
- Title: Bathroom remodeling. → Bathroom remodeling
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jun 11, 2026 → May 27, 2026