Base St. Louis Fence Repairs 70Z02925QNEWO0039
Summary
AI-generated · Aug 24, 2025Repair and replacement of fencing at Base St. Louis, with all labor, materials, and equipment required to complete the work. Prospective bidders must review the Statement of Work and are strongly encouraged to visit the facility to take field measurements and become familiar with existing conditions; a pre-conference will occur after contract award. Work must be performed in accordance with the SOW, under a firm-fixed-price arrangement awarded to the lowest reasonable price technically acceptable bidder, and the effort is a 100% small-business set-aside. All contractors must be SAM.gov-registered.
The contractor must submit, with the schedule of costs, a statement designating portions of work to be performed with the contractor’s own forces; the approved cost schedule will determine the value of work activities, and costs for materials and equipment installed by such labor may be included. Administrative and clerical labor are excluded from the calculation. For site visits, arrangements should be made with the designated site contact; quotes should be submitted to the designated contracting office. Estimated magnitude of the project is under $25,000.
The United States Coast Guard is accepting quotes for qualified individuals or firms to provide all labor, materials, and equipment necessary to repair and replace pieces of fencing location at Base St. Louis. Prior to submitting a quote, it is mandatory to examine the Statement of Work (SOW), and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held before starting the work at Base St. Louis. All work is to be completed in accordance with the SOW. This will be a firm-fixed priced purchase order awarded to the lowest reasonable price technically acceptable bidder. This is a set aside 100% for small business. All contractors must be actively registered in SAM.gov The Contractor shall submit, simultaneously with the schedule of costs required by the Payments under Fixed-Price Construction Contracts clause of the contract, a statement designating the portions of contract work to be performed with the Contractor's own forces. The approved schedule of costs will be used in determining the value of a work activity/event, or portions thereof, of the work for the purpose of this article. In establishing the percent of work to be performed by the Contractor. Cost of material and equipment installed by such labor may be included. The work by the Contractor's executive, administrative and clerical forces shall be excluded in establishing compliance with the requirements of this clause. For site visits please contact: Eva Johnson Email: Eva.M.Johnson@uscg.mil Submit quotes to: Kala.m. lowe@uscg.mil NAICS: 238990 PSC: 5660 36.204 Disclosure of the magnitude of construction projects. Under $25,000
From Combined Synopsis/Solicitation posted on Aug 21, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA