Base Galveston Generator Breaker and Interlock Key 70Z02925QNEWO0038
Summary
AI-generated · Aug 24, 2025Install interlock keys for breakers on the second floor of an 80 kW generator serving a multi-mission building at Base Galveston, including all labor, materials, and equipment. Work must follow the Statement of Work, with a facility visit and field measurements highly encouraged to understand existing conditions; a pre-conference will occur after award before work starts.
Award is firm-fixed price to the lowest price technically acceptable bidder, with small-business participation restricted to set-aside bidders. Bidders must be SAM.gov-registered. The contractor must designate, in the schedule of costs, the portions of work to be performed with the contractor’s own forces, and costs for materials and equipment installed by the contractor’s labor may be included (executive, administrative, and clerical labor excluded). For site visits, coordinate with the designated point of contact; submit quotes to the specified procurement email.
The United States Coast Guard is accepting quotes for qualified individuals or firms to provide all labor, materials, and equipment necessary to install inerlock keys for breakers on the second floor from 80KW generator for multi-mission building at Base Galveston. Prior to submitting a quote, it is mandatory to examine the Statement of Work (SOW), and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held before starting the work at Base Galveston. All work is to be completed in accordance with the SOW. This will be a firm-fixed priced purchase order awarded to the lowest reasonable price technically acceptable bidder. This is a set aside 100% for small business. All contractors must be actively registered in SAM.gov The Contractor shall submit, simultaneously with the schedule of costs required by the Payments under Fixed-Price Service Contracts clause of the contract, a statement designating the portions of contract work to be performed with the Contractor's own forces. The approved schedule of costs will be used in determining the value of a work activity/event, or portions thereof, of the work for the purpose of this article. In establishing the percent of work to be performed by the Contractor. Cost of material and equipment installed by such labor may be included. The work by the Contractor's executive, administrative and clerical forces shall be excluded in establishing compliance with the requirements of this clause. For site visits please contact: Mr. Nashaun Hawkins (847) 627-0653 Email: Nashaun.C.Hawkins@uscg.mil Submit quotes to: Melissa.N.Navarro@uscg.mil NAICS: 238210 PSC: N059 36.204 Disclosure of the magnitude of construction projects. Under $25,000
From Combined Synopsis/Solicitation posted on Aug 22, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA