BARREL-ROTARY, CONTR | 40A | UH-60 SERIES SPE4A726R0056
Summary
AI-generated · Oct 29, 2025Barrel-rotary, CONTR for UH-60 series (NSN 1615-010957108) is being procured as an Indefinite-Quantity Contract with a two-year base period and no option years, set aside for small business. Estimated annual quantity is about 280 units. The part is manufactured by Precision Gear Industries LLC and Sikorsky Aircraft Corporation (both listed with the same P/N 70301-02114-103).
The award requires First Article Testing and Government Production Lot Testing. First Article units due 365 days after award, with government testing and notification in 90 days; production lot sample due 365 days after First Article approval, with production lot testing and notification in 90 days; production units due 30 days after government approval. FOB is destination; inspection/acceptance: First Article at origin, production units at origin for inspection and acceptance. Data rights are restricted to DoD-certified contractors for unclassified data per DoD 5220.22M, certified via DD Form 2345 to DLIS. The solicitation will be available on DIBBS; no paper copies will be provided, and download requires the latest Adobe Acrobat Reader.
BARREL-ROTARY, CONTR | 40A | UH-60 SERIES NSN: 1615-010957108, IQC PR: 1000212415, ITEM: BARREL-ROTARY, CONTR THIS PART IS MANUFACTURED BY THE FOLLOWING SOURCES: PRECISION GEAR INDUSTRIES LLC 21540 P/N 70301-02114-103 SIKORSKY AIRCRAFT CORPORATION 78286 P/N 70301-02114-103 THE SOLICITATION WILL BE ISSUED AS A TOTAL SMALL BUSINESS SET-ASIDE THIS PROCUREMENT IS FOR AN INDEFINITE QUANTITY CONTRACT FOR A BASE PERIOD OF 2 YEARS WITH ZERO (0) OPTIONS. THE ESTIMATED ANNUAL QUANTITY IS 280 EACH. GOVERNMENT FIRST ARTICLE TESTING AND GOVERNMENT PRODUCTION LOT TESTING ARE REQUIRED. DELIVERY OF THE FIRST ARTICLE UNITS WILL BE 365 DAYS ARO. GOVERNMENT TESTING, EVALUATION, AND NOTIFICATION WILL BE 90 DAYS. DELIVERY OF THE PRODUCTION LOT SAMPLE WILL BE 365 DAYS AFTER FIRST ARTICLE APPROVAL. GOVERNMENT PRODUCTION LOT TESTING, EVALUATION, AND NOTIFICATION WILL BE 90 DAYS. DELIVERY OF THE PRODUCTION UNITS WILL BE 30 DAYS AFTER GOVERNMENT APPROVAL. FOB IS AT DESTINATION. FIRST ARTICLE TERMS: INSPECTION AT ORIGIN, ACCEPTANCE AT DESTINATION. PRODUCTION UNIT TERMS: INSPECTION AND ACCEPTANCE AT ORIGIN. THIS ITEM CITED REQUIRES DATA WHICH IS RESTRICTED TO CONTRACTORS CERTIFIED BY DOD TO ACCESS UNCLASSIFIED DATA PER DOD 5220.22M. CERTIFICATION IS OBTAINED BY SUBMITTING DD FORM 2345, MILITARY CRITICAL TECHNICAL DATA AGREEMENT, TO THE DEFENSE LOGISTICS INFORMATION SERVICES. A COPY OF THE SOLICITATION WILL BE AVAILABLE VIA THE DLA INTERNET BID BOARD SYSTEM (DIBBS) AT HTTPS://WWW.DIBBS.BSM.DLA.MIL/RFP ON THE ISSUE DATE CITED IN THE SOLICITATION. FROM THE DIBBS HOMEPAGE, SELECT REQUESTS FOR PROPOSAL (RFP) / INVITATION FOR BID (IFB) FROM THE MENU UNDER THE TAB SOLICITATIONS. THEN SEARCH FOR AND CHOOSE THE RFP YOU WISH TO DOWNLOAD. SOLICITATIONS ARE IN PORTABLE DOCUMENT FORMAT (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT READER. THIS SOFTWARE IS AVAILABLE FREE AT HTTP://WWW.ADOBE.COM. A PAPER COPY OF THE SOLICITATION WILL NOT BE AVAILABLE TO REQUESTORS. THE SOLICITATION WILL BE ISSUED ON OR ABOUT NOVEMBER 12, 2025.
From Presolicitation posted on Oct 28, 2025Notice history
1-
Presolicitation LATEST Posted Oct 28, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA