Bank Stabilization and Navigation Project (BSNP) River Structure Maintenance Multiple Award Task Order Contract (MATOC) W9128F25DA019
Summary
AI-generated · Sep 04, 2025Bank Stabilization and Navigation Project River Structure Maintenance MATOC pools five pre-qualified contractors to perform river structure maintenance work under a shared $49 million capacity. A first task order has been awarded to Midwest Construction Co for $49 million, signaling ongoing use of the pool for river stabilization and navigation-related construction, with potential for future task orders to other MATOC awardees as needs arise.
One of 5 Contractors in MATOC Pool. $49M shared capacity
From Award Notice posted on Sep 03, 2025Notice history
1Details
Award Information
Award Notices
Posted: Sep 03, 2025
One of 5 Contractors in MATOC Pool. $49M shared capacity
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| MIDWEST CONSTRUCTION CO | VPLVZEFWPLK9 | 0C704 | Nebraska City, NE |
Contacts
Agency
Place of Performance
USA