AI-generated · Sep 06, 2025Provide and install backflow prevention equipment and related valves and fittings: supply two 8" backflow preventers (Zurn/Wilkins or equivalent), one 4" BFP, and one 1.5" BFP; supply and install two 8" main gate valves on the effluent side of the BFPs; replace two 8" ductile iron elbows (90s), one 8" tee, and seven bolt-and-gasket kits. All work must be performed during off hours.
Perform chiller room pipe work: replace a leaking IO-inch (likely 1-inch) schedule 40 welded pipe up to 8 feet in the chiller room ceiling, disconnecting the chemical feed line as needed; install two new thread-o-lets, cap one, and connect the new chemical line; replace pipe back to the ball valve with Schedule 80 PVC using new split rings, then have leaks checked and monitored by building engineers for 24 hours before insulation. Install insulation and wrap the new pipe into the existing system. Reuse of plastic vinyl 90s is allowed if not damaged. The contractor must provide and use a smoke eater during all welding, grinding, cutting, and torching, and supply fire safety equipment and notify building engineers when sparks or fire activities will occur.
The Contractor shall furnish all equipment, materials, and labor required to perform the following 3 mechanical services: Backflow Preventors Supply and install 2 each 8 Zurn/Wilkins or equivalent BFP Supply and install 1 each 4 Zurn/Wilkins or equivalent BFP Supply and install 1 each 1.5 Zurn/Wilkins or equivalent BFP Main Gate Valves Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the seven bolt & gasket kits. NOTE-This work will need to be completed during off hours. Chiller Pipe Replacement Replace the IO-inch schedule 40-weld pipe (up to 8 feet) that is leaking in the ceiling of the chiller room. Remove the section of IO-inch schedule 40 weld pipe (up to 8 feet) Tis will require disconnecting the chemical feed line. Install 2 new thread-o-lets, plug one off and connect the new chemical line. Replace the schedule 80 PVC all the way back to the ball valve with new split rings. Leak checked to be performed and monitored by building engineers for 24 hours before insulating Install new insulation and wrapping over new pipe and tie into existing. The plastic vinyl 90's may be reused if not damaged during removal The contractor shall provide and use a smoke eater during all welding, grinding, cutting, and torching of the pipe. Provide necessary fire safety equipment and inform building engineers when fire or sparks will be taking place.
From Solicitation posted on Sep 05, 2025The Contractor shall furnish all equipment, materials, and labor required to perform the following 3 mechanical services: - Backflow Preventors - Supply and install 2 each 8” Zurn/Wilkins or equivalent BFP - Supply and install 1 each 4” Zurn/Wilkins or equivalent BFP - Supply and install 1 each 1.5” Zurn/Wilkins or equivalent BFP - Main Gate Valves - Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the seven bolt & gasket kits. - NOTE-This work will need to be completed during off hours. - Chiller Pipe Replacement - Replace the IO-inch schedule 40-weld pipe (up to 8 feet) that is leaking in the ceiling of the chiller room. - Remove the section of IO-inch schedule 40 weld pipe (up to 8 feet) Tis will require disconnecting the chemical feed line. - Install 2 new thread-o-lets, plug one off and connect the new chemical line. - Replace the schedule 80 PVC all the way back to the ball valve with new split rings. - Leak checked to be performed and monitored by building engineers for 24 hours before insulating - Install new insulation and wrapping over new pipe and tie into existing. - The plastic vinyl 90's may be reused if not damaged during removal - The contractor shall provide and use a smoke eater during all welding, grinding, cutting, and torching of the pipe. - Provide necessary fire safety equipment and inform building engineers when fire or sparks will be taking place.
From Solicitation posted on Sep 12, 2025The Contractor shall furnish all equipment, materials, and labor required to perform the following 3 mechanical services: Backflow Preventors Supply and install 2 each 8 Zurn/Wilkins or equivalent BFP Supply and install 1 each 4 Zurn/Wilkins or equivalent BFP Supply and install 1 each 1.5 Zurn/Wilkins or equivalent BFP Main Gate Valves Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the seven bolt & gasket kits. NOTE-This work will need to be completed during off hours. Chiller Pipe Replacement Replace the IO-inch schedule 40-weld pipe (up to 8 feet) that is leaking in the ceiling of the chiller room. Remove the section of IO-inch schedule 40 weld pipe (up to 8 feet) Tis will require disconnecting the chemical feed line. Install 2 new thread-o-lets, plug one off and connect the new chemical line. Replace the schedule 80 PVC all the way back to the ball valve with new split rings. Leak checked to be performed and monitored by building engineers for 24 hours before insulating Install new insulation and wrapping over new pipe and tie into existing. The plastic vinyl 90's may be reused if not damaged during removal The contractor shall provide and use a smoke eater during all welding, grinding, cutting, and torching of the pipe. Provide necessary fire safety equipment and inform building engineers when fire or sparks will be taking place.
From Solicitation posted on Sep 16, 2025Notice history
3-
-
Solicitation Posted Sep 12, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 11, 2025 → Sep 16, 2025