Contacts, documents and full notice history are available with a subscription.
Sources Sought Expired 1 notice

B695 Tank Farm Revitalization-Design-Build B673616

Solicitation B673616 Copied Notice ID 9a2f817ed62341b3a60c5c704c7c6441 Copied ENERGY, DEPARTMENT OF — LLNS – DOE CONTRACTOR
SAM.gov
Posted
Jun 01, 2026
Deadline
Jun 15, 2026
Set-aside
None
NAICS
238220
PSC
N/A

Summary

AI-generated · Jun 02, 2026

Design-build of the B695 Tank Farm Revitalization encompasses design, demolition, and installation of a centralized reagent-dosing system that delivers five reagents from 55-gallon drums into the nine 5,000-gallon waste-treatment tanks; removal and replacement of the nine tank mixer assemblies; and design and installation of nine coarse bubble diffusers. An optional scope may include instrumentation removal and installation.

These nine tanks are part of LLNL’s RHWM-operated waste treatment facility. The upgrade aims to improve operational efficiency, safety, and regulatory compliance. The base scope uses the existing PLC to control dosing, with specified amounts; mixers must mix a 5,000-gallon tank in 10 minutes; each diffuser provides about 60 scfm per tank. The optional instrumentation scope covers sensors for pH/ORP, conductivity, oxygen, TSS, and liquid level on each tank.

Lawrence Livermore National Security, LLC (hereinafter called LLNS ) is seeking sources for the performance of the design build of the B695 Tank Farm Revitalization. Tank Farm Improvement Project Summary This project scope includes the design, demolition, and installation of five chemical reagent dosing systems for nine 5,000-gallon waste treatment tanks; the removal and replacement of the nine tank mixer assemblies (one for each of nine waste treatment tanks); design and installation of nine coarse bubble diffusers, one for each of nine waste treatment tanks); and an optional instrumentation removal and instillation. The nine waste treatment tanks are part of Lawrence Livermore National Laboratory s (LLNL) waste treatment facility operated by the Radioactive and Hazardous Waste Management (RHWM) program. This renovation aims to upgrade the wastewater treatment system to improve operational efficiency, enhance safety, and ensure continued compliance with regulatory requirements. The following provides a description of the planned systems. Base Scope Reagent Dosing System The new reagent dosing system will be a centralized system to dose 5 different reagents from 55-gallon drums into nine 5,000-gallon treatment tanks. The system will operate through the existing PLC system and dose specified amounts. Tank Mixers The tank mixer assemblies shall include blades, shaft, gearbox, and motor. The mixer shall be capable of thoroughly mixing the 5,000-gallon tank in 10 mins. Course Bubble Diffusers The course bubble diffusers will be installed inside each of the nine 5,000-gal treatment tanks and be capable of aerating the liquid with 60 scfm per tank. Optional Scope Instrumentation The new instrumentation shall be pH/ORP, conductivity, oxygen, TSS, and liquid level sensor on each tank to aid in treatment and handling of the stored waste.

From Sources Sought posted on Jun 01, 2026

Notice history

1
  1. Sources Sought LATEST Posted Jun 01, 2026 View

Details

Solicitation number B673616
Notice ID 9a2f817ed62341b3a60c5c704c7c6441
Notice type Sources Sought
NAICS 238220
Place of performance Livermore, California
Archive date Jun 22, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Gary Arruda

Email

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
LLNS – DOE CONTRACTOR

Place of Performance

Livermore, California 94550
USA

Dates

Posted Jun 01, 2026 2 months ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 15, 2026 1 month ago