B433 Utility Repair FA460026Q0008
Summary
AI-generated · Dec 18, 2025The project requires replacing all piping, valves, lift station pumps, controls and associated control wiring/conduit, and related components inside the B433 lift station and the adjacent manhole. The new piping must run through the manhole walls to the connection with the 6 gravity main, upgrading the wastewater conveyance and related infrastructure.
A site visit will be held for bidders to inspect the facility. Attendees must complete and submit the Offutt Air Force Base Entry Authority List by the stated deadline. The contract falls under the Service Contract Labor Standards (FAR 52.222-41). Questions may be submitted by the designated deadline, with responses posted to the solicitation, and bids must be submitted by the specified bid due date.
Requirements The Contractor shall replace the existing piping, valves, lift station pumps, controls & control wiring/conduit, and associated components in the B433 lift station and adjacent equipment manhole. The piping shall replaced through the manhole walls out to the 6 gravity main connection. Applicable Labor Laws This solicitation is subject to the Service Contract Labor Standards FAR 52.222-41. Site Visit A site visit will occur on 6 January 2026 at 2:00 PM CST. All interested attendees must complete the Offutt Air Force Base Entry Authority List and submit it to the contracting office by 5 January 2026 at 11:00 AM CST. Questions/Answers Questions for solicitation are due by 8 January 2026 at 2:00 PM CST. Answers to all questions will be posted on sam.gov by 12 January 2026 2:00 PM CST. Offer Due Date and Time Thursday, 15 January 2026 at 11:00 AM CST. POC All offers and questions pertaining to this solicitation shall be sent by email to: 2d Lt Liv Nemeck at liv.nemeck.1@us.af.mil 1st Lt Ryan Brewster at ryan.brewster.3@us.af.mil
From Solicitation posted on Dec 17, 2025Amendment 001 - The purpose of this amendment is to attach drawings titled "6 Sanitary Sewer Lift Station". Requirements The Contractor shall replace the existing piping, valves, lift station pumps, controls & control wiring/conduit, and associated components in the B433 lift station and adjacent equipment manhole. The piping shall replaced through the manhole walls out to the 6 gravity main connection. Applicable Labor Laws This solicitation is subject to the Service Contract Labor Standards FAR 52.222-41. Site Visit A site visit will occur on 6 January 2026 at 2:00 PM CST. All interested attendees must complete the Offutt Air Force Base Entry Authority List and submit it to the contracting office by 5 January 2026 at 11:00 AM CST. Questions/Answers Questions for solicitation are due by 8 January 2026 at 2:00 PM CST. Answers to all questions will be posted on sam.gov by 12 January 2026 2:00 PM CST. Offer Due Date and Time Thursday, 15 January 2026 at 11:00 AM CST. POC All offers and questions pertaining to this solicitation shall be sent by email to: 2d Lt Liv Nemeck at liv.nemeck.1@us.af.mil 1st Lt Ryan Brewster at ryan.brewster.3@us.af.mil
From Solicitation posted on Jan 06, 2026Amendment 001 - The purpose of this amendment is to attach drawings titled "6 Sanitary Sewer Lift Station". Amendment 002 - The purpose of this amendment is to attach the sign in sheet from the site visit titled "Site Visit Sign In Sheet". Requirements The Contractor shall replace the existing piping, valves, lift station pumps, controls & control wiring/conduit, and associated components in the B433 lift station and adjacent equipment manhole. The piping shall replaced through the manhole walls out to the 6 gravity main connection. Applicable Labor Laws This solicitation is subject to the Service Contract Labor Standards FAR 52.222-41. Site Visit A site visit will occur on 6 January 2026 at 2:00 PM CST. All interested attendees must complete the Offutt Air Force Base Entry Authority List and submit it to the contracting office by 5 January 2026 at 11:00 AM CST. Questions/Answers Questions for solicitation are due by 8 January 2026 at 2:00 PM CST. Answers to all questions will be posted on sam.gov by 12 January 2026 2:00 PM CST. Offer Due Date and Time Thursday, 15 January 2026 at 11:00 AM CST. POC All offers and questions pertaining to this solicitation shall be sent by email to: 2d Lt Liv Nemeck at liv.nemeck.1@us.af.mil 1st Lt Ryan Brewster at ryan.brewster.3@us.af.mil
From Solicitation posted on Jan 07, 2026Amendment 001 - The purpose of this amendment is to attach drawings titled "6 Sanitary Sewer Lift Station". Amendment 002 - The purpose of this amendment is to attach the sign in sheet from the site visit titled "Site Visit Sign In Sheet". Amendment 003 - The purpose of this amendment is to attach the questions and answers titled "Questions and Answers" and to attach a second set of drawings titled "7 Control Panel Manhole Det". Requirements The Contractor shall replace the existing piping, valves, lift station pumps, controls & control wiring/conduit, and associated components in the B433 lift station and adjacent equipment manhole. The piping shall replaced through the manhole walls out to the 6 gravity main connection. Applicable Labor Laws This solicitation is subject to the Service Contract Labor Standards FAR 52.222-41. Site Visit A site visit will occur on 6 January 2026 at 2:00 PM CST. All interested attendees must complete the Offutt Air Force Base Entry Authority List and submit it to the contracting office by 5 January 2026 at 11:00 AM CST. Questions/Answers Questions for solicitation are due by 8 January 2026 at 2:00 PM CST. Answers to all questions will be posted on sam.gov by 12 January 2026 2:00 PM CST. Offer Due Date and Time Thursday, 15 January 2026 at 11:00 AM CST. POC All offers and questions pertaining to this solicitation shall be sent by email to: 2d Lt Liv Nemeck at liv.nemeck.1@us.af.mil 1st Lt Ryan Brewster at ryan.brewster.3@us.af.mil
From Solicitation posted on Jan 09, 2026Notice history
4Details
Award Information
Not yet awarded
Documents
8Contacts
Phone
Phone
Agency
Place of Performance
USA