B407 Roof Inlet Pipe Lining Repair PANMCC26P0000045033
Summary
AI-generated · Jun 24, 2026Repair five roof inlet drain lines (3 to 6 inches) using an in-place epoxy resin pipe-lining system at Spates Hall (Building 407), Joint Base Myer-Henderson Hall, Fort Myer, VA. This emergency construction and repair work is intended to stop active water infiltration and prevent imminent mold growth; see the attached Statement of Work for details.
The Government requires a construction and repair service agreement to address water infiltration from roof inlet pipes at Spates Hall (Building 407) on Joint Base Myer-Henderson Hall, Fort Myer, VA. The primary objective is to repair five 3-inch to 6-inch roof drain lines using an in-place epoxy resin pipe-lining system. This is an emergency requirement intended to stop active water damage and prevent the imminent risk of mold growth within the facility. See attached Statement of Work(SOW)
From Sources Sought posted on Jun 23, 2026Notice history
1-
Sources Sought LATEST Posted Jun 23, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA