B228 Remove, Furnish, and Replace Hanger Door Operating System FA446025Q0027
Summary
AI-generated · Aug 24, 2025Remove, furnish, and replace the canopy hanger door operator system, including all labor, transportation, tools, equipment, materials, and services needed to complete the installation per the Performance Work Statement. Work must comply with all applicable federal, state, and local regulations and standard overhead door installation practices. The prime contractor must hold an Arkansas overhead door license and provide a copy of the license with the solicitation documents. Complete the work within 30 days of award, with reference materials including the PWS, a SCA wage determination, and related solicitation attachments.
Amendment A0001 changed the competition to Full and Open Competition, and updated the solicitation attachments accordingly. Amendment A0002 rescheduled the required site visit to a later date (the exact date of the site visit was moved).
The contractor shall provide all qualified personnel, transportation, tools, equipment, materials and services required to remove and replacement of Operator System for the existing canopy hanger door. The contractor shall accomplish all services to meet the requirements of the Performance Work Statement (PWS). Work shall follow compliance with all Federal, State, and local regulations and hangar/overhead door installation. Prime contractor must be licensed for overhead door work in the State of Arkansas and produce a copy of the license as part of the contract solicitation requirements. Work shall be accomplished within 30 days of contract award. IAW Attachment, PWS - B228 Operating Hanger Door Sys. Also see Attachments: SCA Wage Determination - B228 Hangar Door Sys PWS - B228 Operating Hanger Door Sys ComboSolicitation - B228 Operating Hanger Door Sys
From Combined Synopsis/Solicitation posted on Jul 29, 2025The contractor shall provide all qualified personnel, transportation, tools, equipment, materials and services required to remove and replacement of Operator System for the existing canopy hanger door. The contractor shall accomplish all services to meet the requirements of the Performance Work Statement (PWS). Work shall follow compliance with all Federal, State, and local regulations and hangar/overhead door installation. Prime contractor must be licensed for overhead door work in the State of Arkansas and produce a copy of the license as part of the contract solicitation requirements. Work shall be accomplished within 30 days of contract award. IAW Attachment, PWS - B228 Operating Hanger Door Sys. Also see Attachments: SCA Wage Determination - B228 Hangar Door Sys PWS - B228 Operating Hanger Door Sys ComboSolicitation - B228 Operating Hanger Door Sys -------------------------------------------------------------------------------------------------------------------- AMENDMENT A0001: This amendement will be changing to Full and Open Competition. see the following attachments: Updated Solicitation - FA446025Q00270001 Amendment - FA446025Q00270001 -------------------------------------------------------------------------------------------------------------------- AMENDMENT A0002: This Amendment will be changing the site visit date from 8/13/2025 at 9:30 AM to 8/15/2025 at 9:30 AM. see the following attachments: Updated Solicitation - FA446025Q00270002 Amendment - FA446025Q00270002
From Combined Synopsis/Solicitation posted on Aug 13, 2025Notice history
2-
Combined Synopsis/Solicitation Posted Jul 29, 2025
-
Combined Synopsis/Solicitation LATEST Posted Aug 13, 2025View changes (3)
- Description: Description was updated
- Response Deadline: Aug 15, 2025 → Aug 22, 2025
- Set-Aside: Total Small Business Set-Aside (FAR 19.5) → No Set aside used
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA