Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation WOSB Expired 3 notices 5 documents

B1319 Carpet, Asbestos, Furniture FA468625QS001

Solicitation FA468625QS001 Copied Notice ID 522d9a01bb1747c68a23b73efb534ac1 Copied DEPT OF DEFENSE — FA4686 9 CONS PK
SAM.gov
Posted
Jul 16, 2025
Deadline
Aug 11, 2025
Set-aside
WOSB
NAICS
238990
PSC
Z2AA

Summary

AI-generated · Aug 24, 2025

Furnish all supervision, labor, tools, equipment, materials, operations, and incidentals to remove existing carpet and install new carpet tiles with cove base in the specified building area, with subfloor preparation (grinding may be necessary). Follow the Air Force Carpet II Ordering Guide for material procurement (no markup) and move/return all office furniture within the MUNS office as described. In addition to carpet replacement, perform ACM removal in the same area, including preparing an abatement plan with certifications, removing/disposing of ACM and debris per the plan, providing air clearance samples via a California-certified asbestos consultant, and submitting NESHAP notifications to the EPA and base environmental contacts at least ten business days before abatement; submit a hazardous waste manifest to the base environmental manager. The government will remove wall hangings and the contractor will protect fixed items during ACM removal. Work must be performed in accordance with the attached delivery/performance schedule and applicable FAR clauses; site visits are required and the project is set aside for a Woman Owned Small Business.

Amendments update administrative details: Amendment 1 corrects the offer due date and site-visit date information, while Amendment 2 extends the RFI due date; site visit information is amended accordingly. All other terms and conditions remain as stated, including the requirement to submit standard representations, the evaluation criteria in Attachment 3, and the required NESHAP/air clearance processes.

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number is FA468625QS001 and the solicitation is issued as a request for quotation (RFQ). (iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circulation 2025-03. (iv) This requirement will be set-aside as a Woman Owned Small Business Concern and the associated NAICS code is 238990 - all other specialty trade contractors and a small business size standard of $19M. (v) A list of line item number(s) and items, quantities, and units of measure is identified in Attachment 1, Section B - Supplies or Services & Prices or Costs. Offerors shall return completed as part of quote submission. (vi) Description of requirement: The Contractor shall furnish all supervision, labor, tools, equipment, materials, operations, and incidentals as required to complete the following work: Carpet Removal and Installation. The contractor shall replace carpet with new carpet tiles and cove base in the building listed in the SON. The contractor must follow the Air Force Carpet II Ordering Guide for material procurement (no markup allowed) and is responsible for moving and returning all furniture within the MUNS office as detailed in the SON. In addition to carpet replacement, the project includes ACM removal in the same area. The contractor must prepare the subfloor (grinding may be necessary), submit an abatement plan with certifications, remove/dispose of all ACM and debris per the plan, provide air clearance sample results via a CA-certified asbestos consultant, and submit NESHAP notifications to the EPA and base environmental contacts at least 10 business days before starting abatement. A hazardous waste manifest must also be submitted to the base environmental manager. The government will remove wall hangings, and the contractor will protect fixed items during ACM removal. (vii) Date(s) and place(s) of delivery and acceptable and FOB point is identified in Attachment 1, Section F - Deliveries or Performance Schedules. (ix) The provision at 52.212-2, Evaluation - Commercial Products and Commercial Services, applies to this acquisition and the specific evaluation criteria to be included is identified in Attachment 3. (x) Offerors shall included a completed copy of the provision at 5.212-3, Offeror Representations and Certifications - Commercial Products and Commercial Services, with its offer. (xi) The clause at 52.212-4, Contract Terms and Conditions- Commercial Products and Commercial Services, applies to this acquisition. (xii) The clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders- Commercial Products and Commercial Services, applies to this acquisition and the additional FAR clauses cited in Attachment 1 are applicable to the acquisition. (xiii) There are no additional contract requirement(s) or terms and conditions (such as contract financing arrangements or warranty requirements) necessary for this acquisition. (xiv) The Defense Priorities and Allocation Systems (DPAS) and assigned rating is not applicable. (xv) Offers are due 11 July 2025 at 10:00 AM PST to the POCs identified in the Contact Information Section of this notice. **A site visit will be held for this requirement on the date listed in Attachment 3 - Site Visit Information. Please review full attachment for instructions on when EALs and questions are due to the Government.**

From Combined Synopsis/Solicitation posted on Jul 16, 2025

Amendment 1: Correct the offer due date typo in the synopsis information in the description to reflect the correct offer due date. Quotes are due 11 August 2025, at 10 AM PST. Additionally, correct Attach 3- Site Visit infromation to reflect the correct site visit date if 29 July 2025. _________________________________________________________________________________________________ This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number is FA468625QS001 and the solicitation is issued as a request for quotation (RFQ). (iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circulation 2025-03. (iv) This requirement will be set-aside as a Woman Owned Small Business Concern and the associated NAICS code is 238990 - all other specialty trade contractors and a small business size standard of $19M. (v) A list of line item number(s) and items, quantities, and units of measure is identified in Attachment 1, Section B - Supplies or Services & Prices or Costs. Offerors shall return completed as part of quote submission. (vi) Description of requirement: The Contractor shall furnish all supervision, labor, tools, equipment, materials, operations, and incidentals as required to complete the following work: Carpet Removal and Installation. The contractor shall replace carpet with new carpet tiles and cove base in the building listed in the SON. The contractor must follow the Air Force Carpet II Ordering Guide for material procurement (no markup allowed) and is responsible for moving and returning all furniture within the MUNS office as detailed in the SON. In addition to carpet replacement, the project includes ACM removal in the same area. The contractor must prepare the subfloor (grinding may be necessary), submit an abatement plan with certifications, remove/dispose of all ACM and debris per the plan, provide air clearance sample results via a CA-certified asbestos consultant, and submit NESHAP notifications to the EPA and base environmental contacts at least 10 business days before starting abatement. A hazardous waste manifest must also be submitted to the base environmental manager. The government will remove wall hangings, and the contractor will protect fixed items during ACM removal. (vii) Date(s) and place(s) of delivery and acceptable and FOB point is identified in Attachment 1, Section F - Deliveries or Performance Schedules. (ix) The provision at 52.212-2, Evaluation - Commercial Products and Commercial Services, applies to this acquisition and the specific evaluation criteria to be included is identified in Attachment 3. (x) Offerors shall included a completed copy of the provision at 5.212-3, Offeror Representations and Certifications - Commercial Products and Commercial Services, with its offer. (xi) The clause at 52.212-4, Contract Terms and Conditions- Commercial Products and Commercial Services, applies to this acquisition. (xii) The clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders- Commercial Products and Commercial Services, applies to this acquisition and the additional FAR clauses cited in Attachment 1 are applicable to the acquisition. (xiii) There are no additional contract requirement(s) or terms and conditions (such as contract financing arrangements or warranty requirements) necessary for this acquisition. (xiv) The Defense Priorities and Allocation Systems (DPAS) and assigned rating is not applicable. (xv) Offers are due 11 August 2025 at 10:00 AM PST to the POCs identified in the Contact Information Section of this notice. **A site visit will be held for this requirement on the date listed in Attachment 3 - Site Visit Information. Please review full attachment for instructions on when EALs and questions are due to the Government.**

From Combined Synopsis/Solicitation posted on Jul 21, 2025

Amendment 2: Extend the RFI due date to 4 August 2025 at 9:00 AM. No other changes have been made at this time. See Attch 3. Site Visit Information- Carpet, Asbestos, Furniture AMENDED. _____________________________________________________________________________________________ Amendment 1: Correct the offer due date typo in the synopsis information in the description to reflect the correct offer due date. Quotes are due 11 August 2025, at 10 AM PST. Additionally, correct Attach 3- Site Visit infromation to reflect the correct site visit date if 29 July 2025. _________________________________________________________________________________________________ This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number is FA468625QS001 and the solicitation is issued as a request for quotation (RFQ). (iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circulation 2025-03. (iv) This requirement will be set-aside as a Woman Owned Small Business Concern and the associated NAICS code is 238990 - all other specialty trade contractors and a small business size standard of $19M. (v) A list of line item number(s) and items, quantities, and units of measure is identified in Attachment 1, Section B - Supplies or Services & Prices or Costs. Offerors shall return completed as part of quote submission. (vi) Description of requirement: The Contractor shall furnish all supervision, labor, tools, equipment, materials, operations, and incidentals as required to complete the following work: Carpet Removal and Installation. The contractor shall replace carpet with new carpet tiles and cove base in the building listed in the SON. The contractor must follow the Air Force Carpet II Ordering Guide for material procurement (no markup allowed) and is responsible for moving and returning all furniture within the MUNS office as detailed in the SON. In addition to carpet replacement, the project includes ACM removal in the same area. The contractor must prepare the subfloor (grinding may be necessary), submit an abatement plan with certifications, remove/dispose of all ACM and debris per the plan, provide air clearance sample results via a CA-certified asbestos consultant, and submit NESHAP notifications to the EPA and base environmental contacts at least 10 business days before starting abatement. A hazardous waste manifest must also be submitted to the base environmental manager. The government will remove wall hangings, and the contractor will protect fixed items during ACM removal. (vii) Date(s) and place(s) of delivery and acceptable and FOB point is identified in Attachment 1, Section F - Deliveries or Performance Schedules. (ix) The provision at 52.212-2, Evaluation - Commercial Products and Commercial Services, applies to this acquisition and the specific evaluation criteria to be included is identified in Attachment 3. (x) Offerors shall included a completed copy of the provision at 5.212-3, Offeror Representations and Certifications - Commercial Products and Commercial Services, with its offer. (xi) The clause at 52.212-4, Contract Terms and Conditions- Commercial Products and Commercial Services, applies to this acquisition. (xii) The clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders- Commercial Products and Commercial Services, applies to this acquisition and the additional FAR clauses cited in Attachment 1 are applicable to the acquisition. (xiii) There are no additional contract requirement(s) or terms and conditions (such as contract financing arrangements or warranty requirements) necessary for this acquisition. (xiv) The Defense Priorities and Allocation Systems (DPAS) and assigned rating is not applicable. (xv) Offers are due 11 August 2025 at 10:00 AM PST to the POCs identified in the Contact Information Section of this notice. **A site visit will be held for this requirement on the date listed in Attachment 3 - Site Visit Information. Please review full attachment for instructions on when EALs and questions are due to the Government.**

From Combined Synopsis/Solicitation posted on Jul 30, 2025

Notice history

3
  1. Combined Synopsis/Solicitation Posted Jul 16, 2025
  2. Combined Synopsis/Solicitation Posted Jul 21, 2025
    • Description: Description was updated
  3. Combined Synopsis/Solicitation LATEST Posted Jul 30, 2025
    • Description: Description was updated

Details

Solicitation number FA468625QS001
Notice ID 522d9a01bb1747c68a23b73efb534ac1
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Z2AA
NAICS 238990
Place of performance E RNCHO DMNGZ, California
Archive date Aug 11, 2025

Award Information

Not yet awarded

Contacts

primary
Lamar Mullins

Email

Phone

secondary
Katherine Moe

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR COMBAT COMMAND
FA4686 9 CONS PK

Place of Performance

E RNCHO DMNGZ, California 95903
USA

Dates

Posted Jul 16, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 11, 2025 11 months ago