B1000 Carpet Replacement 4600

Solicitation 4600 Copied Notice ID 62b4107620a4492aa8b4e17ba694f3a3 Copied DEPT OF DEFENSE — FA4600 55 CONS PKP
SAM.gov
Posted
Jun 30, 2025
Deadline
Jul 04, 2025
Set-aside
SBA
NAICS
314110
PSC
S214

Summary

AI-generated · Aug 24, 2025

Replace approximately 2,350 square yards of carpet on Lower Level 1, with about 1,450 sq yd of new Shaw Sculpt Loop (Style 5T183) in color Clay installed monolithically to match the ongoing project on Level 1, and remove/replace about 1,100 sq yd of corridor carpet (salvaging as much reusable carpet for reuse in office spaces) plus about 350 sq yd of corridor carpet in a secure area (escorts required). Purchase an additional ~300 sq yd of Shaw Knit in Color Sterling to match office spaces; no purchase to match Mixed Metal carpet. Use salvaged carpet tiles from corridors along with new tiles to replace carpet tiles in private office spaces (approximately 900 sq yd across 1002 desks) with escorts as needed. Provide a critical path method construction schedule showing phasing/sequencing, coordinate all activities with the J431 Project Manager to minimize mission impacts, and furnish all labor, equipment, materials, and services to install and integrate the carpet plan as specified, in accordance with the site design and installation plan.

New information between notices: the second notice adds a clarifying question asking whether you can provide both sets of carpet per the SOO, in addition to requiring a capability statement. Otherwise, the scope, quantities, installation requirements, security/escort considerations, and scheduling requirements remain the same.

CONTRACTING OFFICE CONTACT INFORMATION SrA Thearith Em: thearith.em@us.af.mil Casey L Hupton: casey.hupton.1@us.af.mil We looking for looking potential vendors who can complete the work according to the SOO for market research purposes. Please provide a capability statement if you are interested to the emails above. Project includes, but not limited to the following work elements. The contractor shall furnish all labor, equipment, materials, services, and incidentals. No alterations, additions, or deletions shall be made unless with prior approval of the Contractor Project Manager and the government Procuring Contracting Officer (PCO). Work shall be completed in a neat, substantial, and competent manner. Work shall be done in compliance with the manufacturer s instructions. Replace approximately 2350 sq yards of carpet on Lower Level 1: Purchase new, approximately 1450 sq yards of carpet, Carpet to be Shaw Sculpt Loop (Style number 5T183), Color Clay installed Monolithic to match in progress project on Level 1. Remove existing & replace with new, approximately 1100 sq yards of corridor carpet, salvaging as much reusable carpet as possible for reuse in office spaces. Remove existing & replace with new, approximately 350 sq yards of corridor carpet in secure area, salvaging as much reusable carpet as possible for reuse in office spaces. (Escorts will be required) Work shall be performed in a manner that corridors remain open during work. Purchase new approximately 300 sq yards of carpet to match Shaw Knit Color Sterling currently used in office spaces. No purchase required to match Mixed metal carpet. Use both the salvaged carpet tiles from the corridors and new carpet tiles to replace carpet tiles in private office spaces at 1002 desks, approx. 900 sq yards. (Escorts will be required) See attached schedules that list both corridors and rooms affected. Prior to carpet removal & installation, the Contractor shall provide a critical path method construction schedule, to include the phasing/sequencing of carpet removal & replacement activities, as required. Coordinate all activities associated with this project with J431 Project Manager to minimize any mission impacts and contractor delays. The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan.

From Sources Sought posted on Jun 27, 2025

CONTRACTING OFFICE CONTACT INFORMATION SrA Thearith Em: thearith.em@us.af.mil Casey L Hupton: casey.hupton.1@us.af.mil We looking for looking potential vendors who can complete the work according to the SOO for market research purposes. Please let us know if you can provide both sets of carpet according to the SOO or not. Please provide a capability statement if you are interested to the emails above. Project includes, but not limited to the following work elements. The contractor shall furnish all labor, equipment, materials, services, and incidentals. No alterations, additions, or deletions shall be made unless with prior approval of the Contractor Project Manager and the government Procuring Contracting Officer (PCO). Work shall be completed in a neat, substantial, and competent manner. Work shall be done in compliance with the manufacturer s instructions. Replace approximately 2350 sq yards of carpet on Lower Level 1: Purchase new, approximately 1450 sq yards of carpet, Carpet to be Shaw Sculpt Loop (Style number 5T183), Color Clay installed Monolithic to match in progress project on Level 1. Remove existing & replace with new, approximately 1100 sq yards of corridor carpet, salvaging as much reusable carpet as possible for reuse in office spaces. Remove existing & replace with new, approximately 350 sq yards of corridor carpet in secure area, salvaging as much reusable carpet as possible for reuse in office spaces. (Escorts will be required) Work shall be performed in a manner that corridors remain open during work. Purchase new approximately 300 sq yards of carpet to match Shaw Knit Color Sterling currently used in office spaces. No purchase required to match Mixed metal carpet. Use both the salvaged carpet tiles from the corridors and new carpet tiles to replace carpet tiles in private office spaces at 1002 desks, approx. 900 sq yards. (Escorts will be required) See attached schedules that list both corridors and rooms affected. Prior to carpet removal & installation, the Contractor shall provide a critical path method construction schedule, to include the phasing/sequencing of carpet removal & replacement activities, as required. Coordinate all activities associated with this project with J431 Project Manager to minimize any mission impacts and contractor delays. The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan.

From Sources Sought posted on Jun 30, 2025

Notice history

2
  1. Sources Sought Posted Jun 27, 2025 View
  2. Sources Sought LATEST Posted Jun 30, 2025
    • Description: Description was updated

Details

Solicitation number 4600
Notice ID 62b4107620a4492aa8b4e17ba694f3a3
Notice type Sources Sought
Product / Service (PSC) S214
NAICS 314110
Place of performance St Columbans, Nebraska
Archive date Jul 19, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Casey Hupton

Email

Phone

secondary
Thearith Em

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR COMBAT COMMAND
FA4600 55 CONS PKP

Place of Performance

St Columbans, Nebraska 68113
USA

Dates

Posted Jun 30, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 04, 2025 1 year ago