AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT 6982AF25B000019
Summary
AI-generated · Sep 28, 2025Replace the Tonto Creek Bridge on NFSR 289 with a new single-span bridge located east of the existing alignment to minimize traffic disruption, add a sidewalk, and reconstruct the Horton Springs Parking Lot to improve safety and access to nearby recreation sites. The work includes removing the existing two-span bridge and its pier, constructing the new bridge, creating new pedestrian facilities, and conducting channel grading in Tonto Creek, with the roadway portion of FR 289 rebuilt as part of the project and positioned upstream of the current bridge.
A temporary stream diversion is required during construction. Weather will limit onsite work January–April 2026. Estimated project cost ranges from $2,000,000 to $5,000,000. This is a presolicitation; plan and specifications are not available at this time, and the procurement will be conducted as a full and open competition.
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE COMPETITION TYPE: FULL AND OPEN COMPETITION WITH HUBZONE PRICE EVALUATION PREFERENCE PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
From Presolicitation posted on Sep 23, 2025PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM ANTICIPATED SCHEDULE: Advertisement October 2025 Award December 2025 NTP January 2026 Contract Completion October 2026 Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
From Solicitation posted on Oct 20, 2025PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM ANTICIPATED SCHEDULE: Advertisement October 2025 Award December 2025 NTP January 2026 Contract Completion October 2026 Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
From Solicitation posted on Oct 28, 2025PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM ANTICIPATED SCHEDULE: Advertisement October 2025 Award December 2025 NTP January 2026 Contract Completion October 2026 Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
From Solicitation posted on Nov 04, 2025PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM ANTICIPATED SCHEDULE: Advertisement October 2025 Award December 2025 NTP January 2026 Contract Completion October 2026 Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
From Solicitation posted on Nov 14, 2025PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM ANTICIPATED SCHEDULE: Advertisement October 2025 Award December 2025 NTP January 2026 Contract Completion October 2026 Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
From Solicitation posted on Nov 17, 2025PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM ANTICIPATED SCHEDULE: Advertisement October 2025 Award December 2025 NTP January 2026 Contract Completion October 2026 Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
From Solicitation posted on Nov 18, 2025PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM ANTICIPATED SCHEDULE: Advertisement October 2025 Award December 2025 NTP January 2026 Contract Completion October 2026 Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
From Solicitation posted on Nov 19, 2025PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM ANTICIPATED SCHEDULE: Advertisement October 2025 Award December 2025 NTP January 2026 Contract Completion October 2026 Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
From Solicitation posted on Jan 20, 2026Notice history
9-
-
Solicitation Posted Oct 20, 2025View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Oct 08, 2025 → Nov 19, 2025
-
Solicitation Posted Oct 28, 2025No changes from previous notice
-
Solicitation Posted Nov 04, 2025No changes from previous notice
-
Solicitation Posted Nov 14, 2025No changes from previous notice
-
Solicitation Posted Nov 17, 2025No changes from previous notice
-
Solicitation Posted Nov 18, 2025No changes from previous notice
-
Solicitation Posted Nov 19, 2025No changes from previous notice
-
Solicitation LATEST Posted Jan 20, 2026No changes from previous notice