AZ FLAP PIM FR510(1) Sabino Canyon Park 6982AF25B000006
Summary
AI-generated · Aug 25, 2025Construct a new paved parking area with about 75 spaces, plus a kiosk for Arizona Trail information and a public restroom, and upgrade Sabino Canyon Park Road to provide approximately 21 additional on-street parking spaces. Include an asphalt rehabilitation for roughly half a mile and install a 5-foot-wide pathway as part of the Arizona Trail. The work also covers a new paved surface, roadway excavation, a soil-nail retaining wall, drainage improvements with culverts, tree clearing, ditch/ drainage work, new street signage, pavement markings, curb concrete (18-inch depth), gutters, sidewalks, and two vault toilets.
This is a total small business set-aside solicitation. The six records are identical; there is no new information or change across notices. The project is estimated to cost between $5 million and $10 million, with an anticipated schedule that outlines advertisement, award/notice to proceed, and contract completion within the standard government project timeline.
TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement July 2025 Award September 2025 NTP September 2025 Contract Completion May 2026 The estimated price range of the project work is between $5 million and $10 million.
From Solicitation posted on Jul 15, 2025TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement July 2025 Award September 2025 NTP September 2025 Contract Completion May 2026 The estimated price range of the project work is between $5 million and $10 million.
From Solicitation posted on Aug 12, 2025TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement July 2025 Award September 2025 NTP September 2025 Contract Completion May 2026 The estimated price range of the project work is between $5 million and $10 million.
From Solicitation posted on Aug 13, 2025TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement July 2025 Award September 2025 NTP September 2025 Contract Completion May 2026 The estimated price range of the project work is between $5 million and $10 million.
From Solicitation posted on Aug 18, 2025TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement July 2025 Award September 2025 NTP September 2025 Contract Completion May 2026 The estimated price range of the project work is between $5 million and $10 million.
From Solicitation posted on Aug 20, 2025TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement July 2025 Award September 2025 NTP September 2025 Contract Completion May 2026 The estimated price range of the project work is between $5 million and $10 million.
From Solicitation posted on Aug 22, 2025TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement July 2025 Award September 2025 NTP September 2025 Contract Completion May 2026 The estimated price range of the project work is between $5 million and $10 million.
From Solicitation posted on Aug 26, 2025TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement July 2025 Award September 2025 NTP September 2025 Contract Completion May 2026 The estimated price range of the project work is between $5 million and $10 million.
From Solicitation posted on Sep 05, 2025Notice history
8-
-
Solicitation Posted Aug 12, 2025No changes from previous notice
-
Solicitation Posted Aug 18, 2025No changes from previous notice
-
Solicitation Posted Aug 20, 2025No changes from previous notice
-
Solicitation Posted Aug 22, 2025No changes from previous notice
-
Solicitation Posted Aug 26, 2025No changes from previous notice
-
Solicitation LATEST Posted Sep 05, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA