Award of Selective Improvements Project Phase Two (SIP-2) in Copenhagen, Denmark 19AQMM24R0025
Summary
AI-generated · Aug 30, 2025Design/build services for SIP-2 require comprehensive architectural and building systems upgrades to the Chancery building in Copenhagen. The scope covers façade restoration (glass and limestone panels), entry courtyard waterproofing and stone paving replacement, and interior upgrades including finishes, reconfiguration of multipurpose rooms, management office, lobby, locker/laundry, and consular waiting areas; enhancements to the central stair, safety guardrails, art protection, and physical security; creation of a new safe area; installation of new FE grilles and a glass wall in the management area; and related security and protection measures.
Mechanical, electrical, and plumbing work includes replacing and upgrading heating piping and radiators, chilled water piping and FCU/valves, AHU piping and valves in the penthouse, sanitary piping, pumps and valves, and integrating controls with the BAS; replacing the snow-melt system; upgrading relief/exhaust fans with VFDs; converting waterless urinals; installing trap guards; electrical scope to consolidate feeders, upgrade power distribution, evaluate backup power, replace branch circuits, and install LED lighting; removing old wiring; upgrading the fire alarm system to NFPA 72 for a non-sprinklered building; telecom upgrades; and new cabling in the consular waiting area to support the queuing system. An award has been issued to RME/PCI Joint Venture, LLC for about $44.5 million.
Design/Build services that include design and construction execution services for the Selective Improvements Project Phase Two (SIP-2) project in Copenhagen, Denmark Property Description: The Chancery is an existing roughly 5600 gross square meters (GSM) building consisting of four (4) full levels with a partial mezzanine level, and a penthouse. The building was completed in 1954 and has a glass and limestone faade. It is located on .23 hectares (.58 acres) in the Kobenhavs neighborhood. The official project address is Dag Hammarskjlds All 24, 2100 Copenhagen, Denmark. site is bounded along its perimeter by Dag Hammarskjlds Alle to the south, Garnison Cemetery to the east and north, and Villa Canada Residence to the west. Project Scope: SIP-2 is the second phase of the Selective Improvements Project, Phase 1 (SIP-1) completed in late 2023. The SIP-2 project scope includes the design/build construction of the following: Architectural Upgrades Faade Restoration - The work will include limited replacement of cracked or deteriorating glass and stone panels, and all services necessary to fully restore the glass and aluminum window and limestone panels. Entry Courtyard waterproofing, and stone paver replacement. Interior Upgrades Upgraded finishes throughout (paint, flooring, Ceilings, misc. door replacement, signage, window treatment). Multipurpose Room Upgrades and Reconfiguration. Management Office Upgrades and Reconfiguration. Main Lobby Upgrades Locker and Laundry room reconfiguration and upgrades Consular Waiting Room Upgrades Central Stair Upgrades and new safety guardrail Art Protection Physical Security Upgrades New Safe Area New FE Grilles at Consular Waiting FE/BR glass wall at Management Section Mechanical and Plumbing Upgrades Replacement of all existing heating water piping and radiators. Replacement of all existing chilled water piping and FCU s and valve assemblies. Replacement of all existing chilled water piping and AHU s valves assemblies in the penthouse. Replacement of sanitary/vent plumbing pipes for all 3rd floor toilets. Installation of heating circulating pumps with piping and valves assemblies at each AHU. Installation of 150 mm 3-way valve at the main heating system. Replacement of existing domestic hot water tank system and valve assemblies. Installation of Controls and Integration to the BAS system. Replacement of snow melt system in exterior entry courtyard. Replacement of various relief/exhaust fans with VFD and connect to the BAS system. Replace all waterless urinals with low water flow urinals, pipe and vent fixtures. Install trap guards on all floor drains (mechanical rooms and toilets). Electrical Upgrades Combine three incoming feeders. Power distribution upgrades and improvements. Backup power evaluation. Branch circuits replacement. Replace all non-LED lighting with LED fixtures. Remove all old and abandoned electrical wiring. Fire Alarm Upgrades Upgrade Fire Alarm system to meet NFPA 72 for a non-sprinklered building. Telecom Upgrades Suite Upgrades. Consular Section - Install new cabling in the waiting area to accommodate elements of the consular queuing system.
From Award Notice posted on Aug 28, 2025Notice history
1Details
Award Information
Award Notices
Posted: Aug 28, 2025
Design/Build services that include design and construction execution services for the Selective Improvements Project Phase Two (SIP-2) project in Copenhagen, Denmark Property Description: The Chancery is an existing roughly 5600 gross square meters (GSM) building consisting of four (4) full levels w...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| RME/PCI Joint Venture, LLC | N/A | N/A | Fairfax, VA |
Contacts
Agency
Place of Performance
DNK