Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 5 notices 5 documents

Avigilon Surveillance System for CTK at DAFB, *Draft Solicitation* FA449725Q0030

Solicitation FA449725Q0030 Copied Notice ID 46e3851da17d4d0796542d81e7e119ea Copied DEPT OF DEFENSE — FA4497 436 CONS LGC
SAM.gov
Posted
Jun 26, 2025
Deadline
Jul 21, 2025
Set-aside
SBA
NAICS
334290
PSC
N063

Summary

AI-generated · Aug 25, 2025

A turnkey Avigilon video surveillance system is required for the CTK warehouse in Building 794 at Dover AFB. The contractor will procure, install, and maintain the system to meet performance standards (complete coverage, high-resolution imaging, adequate storage) with warranty for the base year and four option years, plus ongoing maintenance and training. Proposals must include a Building 794 floor plan with markings showing where Avigilon equipment will be installed and comply with the brand-name justification for Avigilon.

Amendments add procedural and technical updates: a site visit occurred on July 10 with RSVP requirements; bidders must submit the Building 794 floor plan; new submission due date was established, with a post-site-visit “silent characteristics” document and a revised SOW; the SOW was updated to version 2 requiring the contractor to provide all conduit for installation and addressing remote monitoring. Remote monitoring is restricted to two workstations inside Building 794, each with dual monitors (1920x1080), with no external remote access; conduit installation is required since none currently exists on site.

Amendment 0001 - 1. Site Visit Confirmation. Date: 10 July 0900 DAFB building 794. Meet at visitor center by 0830. RSVP attendees, name/email, by 12pm 8 July 2025. 2. Attached Builidng 794 Floor Plan 3. Section L: Instructions to Offorers Update. Offorers are instructed to include in the submission a copy of Bldg. 794 floor plan with markings identifying where they plan to install the Aviglion Equipment. End Amendment 0001 Scope of Work: This requirement seeks a comprehensive Avigilon Video Surveillance System for the CTK warehouse located at building 794 at Dover AFB. The system prioritizing security and asset monitoring. The contractor will procure, install, and maintain an Avigilon Video Surveillance System that meets or exceeds defined performance standards, including complete coverage, high-resolution imaging, and adequate storage capacity, with all maintenance/repairs under warranty for the base year and four (4) option periods. On going maintenance and training are also required to ensure effective system operation. Please see attached Brand Name Justification for more details.

From Solicitation posted on Jun 26, 2025

Amendment 0001 - 1. Site Visit Confirmation. Date: 10 July 0900 DAFB building 794. Meet at visitor center by 0830. RSVP attendees, name/email, by 12pm 8 July 2025. 2. Attached Builidng 794 Floor Plan 3. Section L: Instructions to Offorers Update. Offorers are instructed to include in the submission a copy of Bldg. 794 floor plan with markings identifying where they plan to install the Aviglion Equipment. End Amendment 0001 Scope of Work: This requirement seeks a comprehensive Avigilon Video Surveillance System for the CTK warehouse located at building 794 at Dover AFB. The system prioritizing security and asset monitoring. The contractor will procure, install, and maintain an Avigilon Video Surveillance System that meets or exceeds defined performance standards, including complete coverage, high-resolution imaging, and adequate storage capacity, with all maintenance/repairs under warranty for the base year and four (4) option periods. On going maintenance and training are also required to ensure effective system operation. Please see attached Brand Name Justification for more details.

From Solicitation posted on Jul 01, 2025

Amendment 0002 - NEW Submission Due Date: 3pm, Wednesday 23 July 2025 NEW Post Site Visit Silent Characteristics document attached (what camera and equipment we need) Added Statement of Work (SOW) Added Questions and Answers attachement /End of Updates/ Amendment 0001 - 1. Site Visit Confirmation. Date: 10 July 0900 DAFB building 794. Meet at visitor center by 0830. RSVP attendees, name/email, by 12pm 8 July 2025. 2. Attached Builidng 794 Floor Plan 3. Section L: Instructions to Offorers Update. Offorers are instructed to include in the submission a copy of Bldg. 794 floor plan with markings identifying where they plan to install the Aviglion Equipment. End Amendment 0001 Scope of Work: This requirement seeks a comprehensive Avigilon Video Surveillance System for the CTK warehouse located at building 794 at Dover AFB. The system prioritizing security and asset monitoring. The contractor will procure, install, and maintain an Avigilon Video Surveillance System that meets or exceeds defined performance standards, including complete coverage, high-resolution imaging, and adequate storage capacity, with all maintenance/repairs under warranty for the base year and four (4) option periods. On going maintenance and training are also required to ensure effective system operation. Please see attached Brand Name Justification for more details.

From Solicitation posted on Jul 15, 2025

Amendment 0003 - SOW v2 18 July 2025, clarification Para 1.3. No conduit is currently on location housing existing equipment. The contractor must provide all conduit required for installation. Amendment 0002 - NEW Submission Due Date: 3pm, Wednesday 23 July 2025 NEW Post Site Visit Silent Characteristics document attached (what camera and equipment we need) Added Statement of Work (SOW) Added Questions and Answers attachement /End of Updates/ Amendment 0001 - 1. Site Visit Confirmation. Date: 10 July 0900 DAFB building 794. Meet at visitor center by 0830. RSVP attendees, name/email, by 12pm 8 July 2025. 2. Attached Builidng 794 Floor Plan 3. Section L: Instructions to Offorers Update. Offorers are instructed to include in the submission a copy of Bldg. 794 floor plan with markings identifying where they plan to install the Aviglion Equipment. End Amendment 0001 Scope of Work: This requirement seeks a comprehensive Avigilon Video Surveillance System for the CTK warehouse located at building 794 at Dover AFB. The system prioritizing security and asset monitoring. The contractor will procure, install, and maintain an Avigilon Video Surveillance System that meets or exceeds defined performance standards, including complete coverage, high-resolution imaging, and adequate storage capacity, with all maintenance/repairs under warranty for the base year and four (4) option periods. On going maintenance and training are also required to ensure effective system operation. Please see attached Brand Name Justification for more details.

From Solicitation posted on Jul 18, 2025

AMENDMENT 0004 - NO NEW INFORMATION Specially addressing Conduit and Workstations clarifications The following paragraphs from the original solicitation have not been changed. They are republished in this amendment for clarity and convenience, with clarifications provided alongside the original text. The following clarification is provided regarding Section 2.1.5 of the SOW: THIS IS NOT NEW INFORMATION 2.1.5 Remote Monitoring: The system shall provide remote monitoring capabilities, enabling the viewing of live and recorded video feeds from two (2) workstations located within Building 794. Each workstation must support dual monitors with a minimum resolution of 1920x1080 per monitor. For the purposes of this SOW, remote monitoring is defined as access from within Building 794 only (e.g., back office). Remote access from external locations to Building 794 is explicitly excluded. CLARIFICATION: While the equipment specification sheet does not detail workstation hardware, the SOW clearly specifies the requirement for two (2) monitoring workstations as outlined above. Offerors shall propose their recommended solution for workstation implementation, which may include but is not limited to desktop computers, server configurations, or other appropriate hardware solutions that meet the dual-monitor requirements specified. Installation Requirement Clarification Conduit installation is required throughout the system installation to ensure professional cable management, system protection, and clean aesthetic lines, particularly in exposed areas. The method and type of conduit shall be appropriate for the installation environment and in accordance with applicable codes. Instructions to Offerors Reminder Offerors are reminded that proposals will be evaluated in accordance with Section M.2 Evaluation Factors as originally stated in the solicitation. Technical solutions should address all requirements outlined in both the SOW and this amendment. All other terms and conditions remain unchanged. Amendment 0003 - SOW v2 18 July 2025, clarification Para 1.3. No conduit is currently on location housing existing equipment. The contractor must provide all conduit required for installation. Amendment 0002 - NEW Submission Due Date: 3pm, Wednesday 23 July 2025 NEW Post Site Visit Silent Characteristics document attached (what camera and equipment we need) Added Statement of Work (SOW) Added Questions and Answers attachement /End of Updates/ Amendment 0001 - 1. Site Visit Confirmation. Date: 10 July 0900 DAFB building 794. Meet at visitor center by 0830. RSVP attendees, name/email, by 12pm 8 July 2025. 2. Attached Builidng 794 Floor Plan 3. Section L: Instructions to Offorers Update. Offorers are instructed to include in the submission a copy of Bldg. 794 floor plan with markings identifying where they plan to install the Aviglion Equipment. End Amendment 0001 Scope of Work: This requirement seeks a comprehensive Avigilon Video Surveillance System for the CTK warehouse located at building 794 at Dover AFB. The system prioritizing security and asset monitoring. The contractor will procure, install, and maintain an Avigilon Video Surveillance System that meets or exceeds defined performance standards, including complete coverage, high-resolution imaging, and adequate storage capacity, with all maintenance/repairs under warranty for the base year and four (4) option periods. On going maintenance and training are also required to ensure effective system operation. Please see attached Brand Name Justification for more details.

From Solicitation posted on Jul 22, 2025

Notice history

5
  1. Solicitation Posted Jun 26, 2025
  2. Solicitation Posted Jul 01, 2025
    • Title: Avigilon Surveillance System for CTK at DAFB, *Draft Solicitation*Avigilon Surveillance System for CTK at DAFB, Amendment 0001
  3. Solicitation Posted Jul 15, 2025
    • Title: Avigilon Surveillance System for CTK at DAFB, Amendment 0001Avigilon Surveillance System for CTK at DAFB, Amendment 0002
    • Description: Description was updated
    • Response Deadline: Jul 21, 2025Jul 23, 2025
  4. Solicitation Posted Jul 18, 2025
    • Title: Avigilon Surveillance System for CTK at DAFB, Amendment 0002Avigilon Surveillance System for CTK at DAFB, Amendment 0003
    • Description: Description was updated
  5. Solicitation LATEST Posted Jul 22, 2025
    • Description: Description was updated

Details

Solicitation number FA449725Q0030
Notice ID 46e3851da17d4d0796542d81e7e119ea
Notice type Solicitation
Product / Service (PSC) N063
NAICS 334290
Place of performance Dover AFB, Delaware
Archive date Jul 21, 2025

Award Information

Not yet awarded

Contacts

primary
Victoria Barra

Email

Phone

secondary
Dean Mohrmann

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR MOBILITY COMMAND
FA4497 436 CONS LGC

Place of Performance

Dover AFB, Delaware 19902
USA

Dates

Posted Jun 26, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 21, 2025 1 year ago