ARCENT Readiness Training Center Microgrid Project - Camp Buehring, Kuwait W912QR24R0046
Summary
AI-generated · Jan 27, 2026Provide construction to deliver a resilient power solution for the ARCENT Readiness Training Center (ARTC) at Camp Buehring, Kuwait, by integrating a microgrid that ties into Camp Buehring’s power plant ring 4. The scope includes installing a new 1500 KVA transformer, a 1.5 MW diesel generator, a 700 kW solar PV array, and a 1.5 MW/1.5 MWh Battery Energy Storage System, all to operate in synchronization as a single microgrid.
This project is intended to enhance mission readiness by ensuring reliable power through a combined system of generation, solar, and storage integrated with the ARTC facility’s existing electrical infrastructure.
ARCENT Readiness Training Center Microgrid Project Camp Buehring, Kuwait. D/B/B Construction Supply resilient power to ARCENT Readiness Training Center (ARTC) at Camp Buehring. The project will connect the ARTC to Camp Buehring's power plant ring 4 thru new 1500 KVA transformer, install 1.5 MW new diesel generator and install a microgrid system including 700 KW PV solar panels and a 1.SMW/1.5 MWH technically proven Battery Energy Storage System (BESS), all to be synchronized.
From Award Notice posted on Jan 26, 2026Notice history
1Details
Award Information
Award Notices
Posted: Jan 26, 2026
ARCENT Readiness Training Center Microgrid Project Camp Buehring, Kuwait. D/B/B Construction Supply resilient power to ARCENT Readiness Training Center (ARTC) at Camp Buehring. The project will connect the ARTC to Camp Buehring's power plant ring 4 thru new 1500 KVA transformer, install 1.5 MW new d...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| AGCO-PS JV | H579TGKND2J8 | SRSK6 | Kuwait |
Contacts
Agency
Place of Performance
KWT