Truck Tire Replacement WX01143Y2026T
Summary
AI-generated · Jun 23, 2026Replace tires for a defined set of government vehicles at the FEMA MERS facility located at 434 S. Pinetree Blvd., Thomasville, GA 31792. The contract covers tire procurement, installation, and the contractor’s responsibility for removal and cleanup of old tires, with all work completed within 90 days from award. Tire sizes, types, and quantities are specified in the attached Statement of Work and are not disclosed in this notice.
Provide a price quote for the items listed in the attached Statement of Work, including installation, and submit on a lowest-price technically acceptable basis. If applicable, include your GSA contract number. If the 90-day timeline cannot be met, supply a justification.
Amendment 1 - Questions and Answers: Q1. Please provide the list of vehicles requiring tire replacement under each project. A1. Disclosure of the types of vehicles or quantity is not to be disclosed. Q2. What tire sizes are required for the vehicles covered under these requirements? A2. Tire specifications are listed in the attached Statement of Work. Q3. What are the vehicle specifications, including the sizes/types of trucks involved? A3. Requested tires are listed in the Statement of Work. Q4. Please confirm the total fleet size, including the number of trucks and trailers covered under each requirement. A4. Disclosure of the types of vehicles or quantity is not to be disclosed. Requested tires are listed in the Statement of Work. Q5. Does the 90-day period of performance include both the procurement of the tires and the completion of all tire replacement services for each project? A5. Yes Q6. Please clarify whether the contractor is responsible for the removal, disposal, and cleanup of the old tires, or if this will be handled by the Government. A6. Yes the contractor is responsible for all removal and cleanup. Q7. Kindly confirm the appropriate email address for the Point of Contact (POC) to whom quotations should be submitted for this requirement. A7. paul.johnson@fema.dhs.gov This requirement will be evaluated on lowest price technically acceptable and is for the procurement and replacement of vehicle tires. Please provide a price quote for the details shown in the attached statement of work to include installation. Please also provide a GSA contract number if you have one. The tires must be procured and installed 90 days from date of award of contract. If you cannot meet this timeline, provide a justification. REPLACEMENT OF VEHICLE TIRES. ***TIRES MUST BE REPLACED AT THE FACILTY LOCATED AT: FEMA MERS 434 S. PINETREE BLVD. THOMASVILLE, GA 31792 *** SEE STATEMENT OF WORK AND ITEM LIST***
From Combined Synopsis/Solicitation posted on Jun 22, 2026This requirement will be evaluated on lowest price technically acceptable and is for the procurement and replacement of truck tires. Please provide a price quote for the details shown in the attached statement of work to include installation. Please provide a GSA contract number if you have one. The tires must be procured and installed 90 days from date of award of contract. If you cannot meet this timeline, provide a justification. Tires must be 2026 year and vendor must be within 30 miles of installation site. ***TIRES MUST BE REPLACED AT THE FACILTY LOCATED AT: FEMA MERS 434 S. PINETREE BLVD. THOMASVILLE, GA 31792 *** SEE STATEMENT OF WORK AND ITEM LIST*** Q1. Please provide the list of vehicles requiring tire replacement under each project. A1. Disclosure of the types of vehicles or quantity is not to be disclosed. Q2. What tire sizes are required for the vehicles covered under these requirements? A2. Tire specifications are listed in the attached Statement of Work. Q3. What are the vehicle specifications, including the sizes/types of trucks in A3. Requested tires are listed in the Statement of Work. Q4. Please confirm the total fleet size, including the number of trucks and trailers covered under each requirement. A4. Disclosure of the types of vehicles or quantity is not to be disclosed. Requested tires are listed in the Statement of Work. Q5. Does the 90-day period of performance include both the procurement of the tires and the completion of all tire replacement services for each project? A5. Yes Q6. Please clarify whether the contractor is responsible for the removal, disposal, and cleanup of the old tires, or if this will be handled by the Government. A6. Yes the contractor is responsible for all removal and cleanup. Q7. Kindly confirm the appropriate email address for the Point of Contact (POC) to whom quotations should be submitted for this requirement. A7. paul.johnson@fema.dhs.gov
From Solicitation posted on Jul 07, 2026Notice history
2-
-
Solicitation LATEST Posted Jul 07, 2026View changes (4)
- Title: Amendment 1 - VEHICLE TIRE REPLACEMENT--Thomasville, GA → Truck Tire Replacement
- Description: Description was updated
- Notice Type: Combined Synopsis/Solicitation → Solicitation
- Response Deadline: Jun 22, 2026 → Jul 13, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA