Amendment 1 - Trailer Tire Replacement--Thomasville, GA WX01094Y2026T
Summary
AI-generated · Jun 23, 2026Procurement and replacement of trailer tires, including installation, for projects at the FEMA MERS facility in Thomasville, GA. The contractor must perform removal and cleanup of old tires and complete all tire work within 90 days from the date of award. Details on tire sizes, types, and the specific vehicles covered are provided in the attached Statement of Work.
Submit a price quote covering the items and installation as described in the SOW; evaluation will be based on the lowest price technically acceptable. If you have a GSA contract, include the contract number if applicable. If you cannot meet the 90-day timeline, provide a justification. The work site is the FEMA MERS facility at 434 S. Pinetree Blvd., Thomasville, GA 31792, and quotes should be aligned with the directions in the SOW.
Amendment 1 - Questions and Answers: Q1. Please provide the list of vehicles requiring tire replacement under each project. A1. Disclosure of the types of vehicles or quantity is not to be disclosed. Q2. What tire sizes are required for the vehicles covered under these requirements? A2. Tire specifications are listed in the attached Statement of Work. Q3. What are the vehicle specifications, including the sizes/types of trucks involved? A3. Requested tires are listed in the Statement of Work. Q4. Please confirm the total fleet size, including the number of trucks and trailers covered under each requirement. A4. Disclosure of the types of vehicles or quantity is not to be disclosed. Requested tires are listed in the Statement of Work. Q5. Does the 90-day period of performance include both the procurement of the tires and the completion of all tire replacement services for each project? A5. Yes Q6. Please clarify whether the contractor is responsible for the removal, disposal, and cleanup of the old tires, or if this will be handled by the Government. A6. Yes the contractor is responsible for all removal and cleanup. Q7. Kindly confirm the appropriate email address for the Point of Contact (POC) to whom quotations should be submitted for this requirement. A7. paul.johnson@fema.dhs.gov This requirement will be evaluated on lowest price technically acceptable and is for the procurement and replacement of trailer tires. Please provide a price quote for the details shown in the attached statement of work to include installation. Please also provide a GSA contract number if you have one. The tires must be procured and installed 90 days from date of award of contract. If you cannot meet this timeline, provide a justification. ***TIRES MUST BE REPLACED AT THE FACILTY LOCATED AT: FEMA MERS 434 S. PINETREE BLVD. THOMASVILLE, GA 31792 *** SEE STATEMENT OF WORK AND ITEM LIST***
From Combined Synopsis/Solicitation posted on Jun 22, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA