Amend 01 Bldg 45 Porches and Brick Restoration W91QF425BA0130001
Summary
AI-generated · Sep 12, 2025Amendment provides clarifications to contractor questions raised during the site visit for the Fort Leavenworth Building 45 Porches & Brick Renovation. The SSHO and QC Manager may be the same person, but the Superintendent must be a separate individual. On-site construction is anticipated to start as early as two to three weeks after proposals are received. No third-party inspections are required; DPW will conduct inspections, with possible SHPO or other inspections, and no permitting is required; the project is tax-exempt and the tax exemption will be requested at award.
Additional items clarified include that the manufacturer of the existing standing seam roofing and any current warranty cannot be confirmed; DPW has no records of the existing roofing on the north or south porches. No asbestos is known to be present near the scope area. Site-visit sign-in sheets will not be provided. If material/equipment lead times affect performance, the period of performance may be extended after award.
This is an amnedment to publicize all the questions from the site vist for Bldg. 45 Porches and Brick Restoration. DPW Responses to Contractor Questions for Solicitation W91QF425BA013 Ft. Leavenworth Bldg. 45 Porches & Brick Renovation 1. Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals? DPW: Only the SSHO and the QC Manager may be the same person. 2. Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project? DPW: Yes, the period of performance may be extended, but it may not be necessary. 3. Please provide the site visit attendee sign in sheet. DPW: As discussed during the walk-thru meeting, DPW will not be able to provide the signsheets.This is a government document. 4. Please confirm the manufacturer of the existing roofing system and who carries the current warranty of the roofing system. DPW: We can find no records of the existing standing seam roofing on the north or south porch roofs. 5. Please confirm whether asbestos or lead is present on this project, and if so, provide the relevant documentation. DPW: No asbestos is known to be on or near the scope area of this project. 6. Is this project tax exempt? DPW: Yes, this project is tax exempt. We will request a tax exemption when the award is issued. 7. When do you anticipate on site work starting? DPW: We anticipate on-site construction activities starting as early as 2 3 weeks after proposals are received. 8. Are third party inspections required? DPW: No third party inspections are required, but DPW will generally review Construction and SHPO or others may come by to inspect. 9. Is permitting required? DPW: No permitting is required.
From Special Notice posted on Sep 10, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA