Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 2 notices 19 documents

ALS Lead Shielding Panels JS-2025-003

Solicitation JS-2025-003 Copied Notice ID bf7c7f2c355542bb92b431df1b90aa51 Copied ENERGY, DEPARTMENT OF — BERKELEY NATL LAB - DOE CONTRACTOR
SAM.gov
Posted
Jul 09, 2025
Deadline
Jul 16, 2025
Set-aside
SBA
NAICS
332312
PSC
AJ15

Summary

AI-generated · Aug 23, 2025

Fabricate and install new lead shielding panels on the inside faces of the storage-ring outer precast walls to improve radiation shielding for the ALS-U storage ring. The work uses 95% design drawings and current seismic and structural requirements (ASCE 7-16, CBC 2019, and related site/seismic analyses) to resist gravity and seismic loading. Bidders should expect a single award for the complete panel lot (not two batches), with an optional priced project-management/support scope after delivery that covers installation consultation and panel handling/storage. The 100% drawings will be issued later based on subcontractor recommendations, and panel widths may change by up to one inch from the 95% design while height and thickness remain fixed.

Changes and new information introduced across amendments include removing the two-batch/two-award approach in favor of one complete-lot award, adding installation consultation and project-management support as a priced option, updating the project schedule, and clarifying that current drawings are at 95% with 100% drawings to follow. A Basis of Design document has been added (ALS Lead Shielding - Basis of Design AL-1816-3759). Draft documents and attachments have been revised (draft revisions of the SOW and related documents, and updated pricing/delivery and sample panel documents), and Q&A materials have been added to reflect vendor questions and responses.

Amendment 2 is hereby issued to this RFP on June 27, 2025 to: 1. Revise "06 AL-1790-6401A ALS-U SR New Lead Panel Structural Steel Sheet List" to DRAFT REV. B 2. Revise "08 AL-1791-1369B Statement of Work" to DRAFT REV. C 3. Revise "09 Attachment A ALS Lead Shielding Panel Pricing and Delivery Matrix" to REV. 1 *PLEASE ENSURE Attachment A REV. 1 is the document included with you finalized RFP submission* 4. Revise "10 Sample SubK Lead Shielding Panels" to REV. 1 5. Add "ALS Lead Shielding - Basis of Design AL-1816-3759" *The DRAFT Documents noted above are presently routing through LBNL internal approvals process and are not anticipated to change under a finalized award. Below is a brief summary of the specific changes to the Statement of Work: 1. Removed the potential for a (2) batch or (2) award approach. LBNL now intends to make (1) award for the complete lot of panels. 2. Addition of consultation services during installation. 3. Updates to the schedule. 4. Clarified that the current drawings are at the 95% design stage. 5 . Minor language clarifications throughout. All other terms of this RFP remain the same. __________________________________________________________________________ Amendment 1 is hereby issued to this RFP on June 10, 2025 to extend the Proposal Due Date until July 9, 2025. An Amendment 2 will be issued on or about June 27, 2025 to accomplish the following 2 Items in additional detail: Item 1) Clarify that the design drawing set provided by LBNL is currently at 95% completion, not 100%. LBNL will issue 100% drawings based on subcontractor recommendations as described in SOW Section 3.2.1.1. Additionally, the panel widths in the 100% drawings may increase or reduce in size by up to 1 based on as-built measurements being performed by LBNL; height and thickness of the panels will remain unchanged. Item 2) Add project management support scope - to be further defined in the revised SOW - as a priced option after panel delivery. This support would cover consultation during installation and panel handling & storage requirements. __________________________________________________________________________ Changed Primary Point of Contact to Arielle Anoop. June 23, 2025 Adding Vendor Q & A 6 from Vendor Drawing Meeting June 9 , 2025 please reference attachments Adding Video of Vendor Drawing only questions June 4, 2025 please reference attachments Vendor Q&A Question 5 is added as of June 3, 2025 - please reference attachments Vendor Q&A Question 4 is added as of May 21, 2025 - please reference attachments Vendor Q&A Questions 2 & 3 are added as of May 20, 2025 - Please reference attachments Vendor Q&A Question 1 is added as of May 14, 2025 - please reference attachments __________________________________________________________________________ Project Definition ALS-U Storage Ring Lead Panel Shielding Completion of 95% Drawings. Fabricate and install new lead panels to the inside face of the storage ring outer precast walls to improve radiation shielding performance. This project is part of the Advanced Light Source. Upgrade storage ring shielding. The structural design and anchorage detailing for the new lead shielding panels is based on the current ASCE 7-16, California Building Code (CBC), 2019 edition, Part 10 (California Existing Building Code, University of California Seismic Safety Policy, Geotechnical Data and Interpretation Report and Site-Specific Seismic Hazard Analyses and Development of Design Ground Motions Report. The seismic analysis and retrofit design of the existing structure have been performed in a previous task. The design considers the combination of gravity and seismic loading resisted by the anchorage to the precast walls. Please reference attached documetation for additional infromation.

From Solicitation posted on Jun 27, 2025

Amendment 3 is hereby issued to this RFP on July 9, 2025 to extend the Proposal Due Date until July 16, 2025. All other terms of this RFP remain the same. Please ensure that you have reviewed all prior Amendments and all attachments hereto. Submissions must be in accordance with Section 2 (SOLICITATION RESPONSE REQUIREMENTS AND EVALUATION FOR AWARD) of RFP-BVSS-JS-2025-003.pdf attached hereto. Failure to submit the required Cover Letter, Technical Volume, Business Volume and any other requested documentation may render your submission nonresponsive. __________________________________________________________________________ Amendment 2 is hereby issued to this RFP on June 27, 2025 to: 1. Revise "06 AL-1790-6401A ALS-U SR New Lead Panel Structural Steel Sheet List" to DRAFT REV. B 2. Revise "08 AL-1791-1369B Statement of Work" to DRAFT REV. C 3. Revise "09 Attachment A ALS Lead Shielding Panel Pricing and Delivery Matrix" to REV. 1 *PLEASE ENSURE Attachment A REV. 1 is the document included with you finalized RFP submission* 4. Revise "10 Sample SubK Lead Shielding Panels" to REV. 1 5. Add "ALS Lead Shielding - Basis of Design AL-1816-3759" *The DRAFT Documents noted above are presently routing through LBNL internal approvals process and are not anticipated to change under a finalized award. Below is a brief summary of the specific changes to the Statement of Work: 1. Removed the potential for a (2) batch or (2) award approach. LBNL now intends to make (1) award for the complete lot of panels. 2. Addition of consultation services during installation. 3. Updates to the schedule. 4. Clarified that the current drawings are at the 95% design stage. 5 . Minor language clarifications throughout. All other terms of this RFP remain the same. __________________________________________________________________________ Amendment 1 is hereby issued to this RFP on June 10, 2025 to extend the Proposal Due Date until July 9, 2025. An Amendment 2 will be issued on or about June 27, 2025 to accomplish the following 2 Items in additional detail: Item 1) Clarify that the design drawing set provided by LBNL is currently at 95% completion, not 100%. LBNL will issue 100% drawings based on subcontractor recommendations as described in SOW Section 3.2.1.1. Additionally, the panel widths in the 100% drawings may increase or reduce in size by up to 1 based on as-built measurements being performed by LBNL; height and thickness of the panels will remain unchanged. Item 2) Add project management support scope - to be further defined in the revised SOW - as a priced option after panel delivery. This support would cover consultation during installation and panel handling & storage requirements. __________________________________________________________________________ Changed Primary Point of Contact to Arielle Anoop. June 23, 2025 Adding Vendor Q & A 6 from Vendor Drawing Meeting June 9 , 2025 please reference attachments Adding Video of Vendor Drawing only questions June 4, 2025 please reference attachments Vendor Q&A Question 5 is added as of June 3, 2025 - please reference attachments Vendor Q&A Question 4 is added as of May 21, 2025 - please reference attachments Vendor Q&A Questions 2 & 3 are added as of May 20, 2025 - Please reference attachments Vendor Q&A Question 1 is added as of May 14, 2025 - please reference attachments __________________________________________________________________________ Project Definition ALS-U Storage Ring Lead Panel Shielding Completion of 95% Drawings. Fabricate and install new lead panels to the inside face of the storage ring outer precast walls to improve radiation shielding performance. This project is part of the Advanced Light Source. Upgrade storage ring shielding. The structural design and anchorage detailing for the new lead shielding panels is based on the current ASCE 7-16, California Building Code (CBC), 2019 edition, Part 10 (California Existing Building Code, University of California Seismic Safety Policy, Geotechnical Data and Interpretation Report and Site-Specific Seismic Hazard Analyses and Development of Design Ground Motions Report. The seismic analysis and retrofit design of the existing structure have been performed in a previous task. The design considers the combination of gravity and seismic loading resisted by the anchorage to the precast walls. Please reference attached documetation for additional infromation.

From Solicitation posted on Jul 09, 2025

Notice history

2
  1. Solicitation Posted Jun 27, 2025 View
  2. Solicitation LATEST Posted Jul 09, 2025
    • Description: Description was updated
    • Response Deadline: Jul 09, 2025Jul 16, 2025

Details

Solicitation number JS-2025-003
Notice ID bf7c7f2c355542bb92b431df1b90aa51
Notice type Solicitation
Product / Service (PSC) AJ15
NAICS 332312
Place of performance Berkeley, California
Archive date Jul 31, 2025

Award Information

Not yet awarded

Contacts

primary
Arielle Anoop

Email

Phone

secondary
Arielle Anoop

Email

Phone

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
BERKELEY NATL LAB - DOE CONTRACTOR

Place of Performance

Berkeley, California 94720
USA

Dates

Posted Jul 09, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 16, 2025 1 year ago