Airlift Loading Ramps W50S7F26SS0002
Summary
AI-generated · Apr 10, 2026Three sets of aluminum loading ramps are required to load MJ-1/MHU-83s onto C-130, C-17, or C-5 aircraft. These ramps must be original DAMAS ramps corresponding to P/Ns Q6915, Q6708, and Q6916. Respondents should address five items: whether the ramps eliminate the need for any wood shoring, including pedestal shoring; the dimensions of each ramp set; the maximum single-axle weight the ramps can support; certification of all components to ATTLA #2012.02.03.01 Rev 1; and a typical delivery timeframe.
The 148th Fighter Wing has a requirement for three (3) sets of aluminum ramps to load MJ-1/MHU-83s onto C-130, C-17, or C-5 aircraft. Details can be found below. Aluminum Ramps Quantity: 3 Sets Original Manufacturer: DAMAS P/N: Q6915, Q6708, and Q6916 --------------------------------------------------------------- Please respond to the following questions: 1. Do the loading ramps your company provides eliminate the need for any wood shoring, including the pedetal shoring? 2. What are the dimensions of each set of loading ramps? 3. What is the maximum single axle weight each set of loading ramps can handle? 4. Are all components certified by ATTLA #2012.02.03.01 Rev 1? 5. Please list your average delivery timeframe.
From Sources Sought posted on Apr 09, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA