Aircraft & Trailer Lavatory Services FA8224-26-0031LS
Summary
AI-generated · Apr 01, 2026Provide all management, tools, supplies, equipment, and labor to flush, empty, clean, and drain incoming C-130 aircraft and potential 309 AMXG trailer break-room toilets; dispose of waste materials; and prepare the toilet systems in accordance with the procedures in the Performance Work Statement. Response times must be 24 hours for standard calls and 2 hours for emergencies, with work performed for the 309th Aircraft Maintenance Group at Hill AFB as part of market research to assess a potential requirement. Refer to the attached sources sought document for full description and response requirements, and contact the listed POCs if the PDF won’t open.
Seeking information from interested Contractors for market research purposes to support a potential need for the following requirement: Contractor shall provide all management, tools, supplies, equipment, and labor necessary to flush, empty, clean, and drain incoming C-130 aircraft and possible 309 AMXG trailer break-room toilets, dispose of waste materials, and prepare the toilet systems, in accordance with the procedures outlined in the Performance Work Statement (PWS). Contractor must be able to respond within 24 hours of a standard call request and within 2 hours for emergency call requests. This work will be done for the 309th Aircraft Maintenance Group at Hill AFB. See the attached sources sought document for full description and response requirements. If you experience issues opening the attached PDF, please reach out to the point of contacts listed below.
From Sources Sought posted on Mar 31, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA