Contacts, documents and full notice history are available with a subscription.
Presolicitation Expired 2 notices 3 documents

Aerospace Readiness Enterprise System (ARES)_Draft_Amendment 1 ARES_PROTOTYPE_OPPORTUNITY_DRAFT

Solicitation ARES_PROTOTYPE_OPPORTUNITY_DRAFT Copied Notice ID 9fcef4d1298b43d5b2a2c1d10f6df1f1 Copied DEPT OF DEFENSE — FA8730 KESSEL RUN AFLCMC/HBBK
SAM.gov
Posted
Oct 28, 2025
Deadline
Oct 31, 2025
Set-aside
None
NAICS
541519
PSC
AC13

Summary

AI-generated · Oct 08, 2025

Draft posting seeks industry feedback on a prototype approach for the Aerospace Readiness Enterprise System (ARES). The initial use case will be built as a prototype to test technologies and approaches with low cost and rapid risk mitigation, focusing on enterprise scheduling, standardization and evaluation (stan/eval), and training management to determine how well the concept can address the organization’s problem before full development.

ARES is intended as the Air Force’s enterprise solution to replace legacy systems (PEX, Puckboard, and G/TIMS). It will leverage commercial software to the greatest extent possible and be deployed first in an IL4 environment, with a path to IL6 later. The prototype will be based on Air Education and Training Command requirements, but may incorporate needs from other MAJCOMs as well; final acceptance will depend on meeting threshold requirements and objective evaluation criteria. The prototype must be completed and available for use no later than 90 calendar days after contract award.

****The intent for this DRAFT posting is to recieve feedback from industry***** Prototyping is a means of testing assumptions about technologies and approaches before expending significant amounts of effort or money building something that may not address the organization s problem. Prototyping is a low-cost, rapid risk mitigation approach. As such, we propose that the first Aerospace Readiness Enterprise System (ARES) use case be built as a prototype initially, with the following capability goals. ARES is the Air Force s enterprise solution for scheduling, standardization and evaluation (stan/eval) and training management which is intended to replace the Patriot Excalibur (PEX), Puckboard, and Graduate/Training Integration Management System (G/TIMS) legacy software programs. Specifically, ARES will leverage commercial software to the greatest extent possible and be deployed, initially, within the Impact Level (IL) 4 partition with a path to IL-6 deployment thereafter. Further, the Air Force, in support of the DAF BATTLE NETWORK, has an enduring requirement to deploy a robust solution which provides enterprise capabilities for scheduling, stan/eval, and training for increased readiness and lethality. Starting with the requirements of Air Education and Training Command (AETC) as the basis for this prototype, but not excluding requirements from other MAJCOMs, the prototype should meet as many of the following criteria as possible. Final acceptance of the prototype will be based on its ability to meet the threshold requirements outlined below. The final evaluation of the prototypes will also consider objective criteria as defined below. The prototype shall be completed and available for inspection and use no later than 90 calendar days after contract award.

From Presolicitation posted on Sep 30, 2025

****The intent for this DRAFT posting is to recieve feedback and questions from industry; the Government does not seek nor intend to receive Draft Proposals from offeror teams.***** Prototyping is a means of testing assumptions about technologies and approaches before expending significant amounts of effort or money building something that may not address the organization s problem. Prototyping is a low-cost, rapid risk mitigation approach. As such, we propose that the first Aerospace Readiness Enterprise System (ARES) use case be built as a prototype initially, with the following capability goals. ARES is the Air Force s enterprise solution for scheduling, standardization and evaluation (stan/eval) and training management which is intended to replace the Patriot Excalibur (PEX), Puckboard, and Graduate/Training Integration Management System (G/TIMS) legacy software programs. Specifically, ARES will leverage commercial software to the greatest extent possible and be deployed, initially, within the Impact Level (IL) 4 partition with a path to IL-6 deployment thereafter. Further, the Air Force, in support of the DAF BATTLE NETWORK, has an enduring requirement to deploy a robust solution which provides enterprise capabilities for scheduling, stan/eval, and training for increased readiness and lethality. Starting with the requirements of Air Education and Training Command (AETC) as the basis for this prototype, but not excluding requirements from other MAJCOMs, the prototype should meet as many of the following criteria as possible. Final acceptance of the prototype will be based on its ability to meet the threshold requirements outlined below. The final evaluation of the prototypes will also consider objective criteria as defined below. The prototype shall be completed and available for inspection and use no later than 90 calendar days after contract award.

From Presolicitation posted on Oct 28, 2025

Notice history

2
  1. Presolicitation Posted Sep 30, 2025 View
  2. Presolicitation LATEST Posted Oct 28, 2025
    • Title: Aerospace Readiness Enterprise System (ARES)_DraftAerospace Readiness Enterprise System (ARES)_Draft_Amendment 1
    • Description: Description was updated

Details

Solicitation number ARES_PROTOTYPE_OPPORTUNITY_DRAFT
Notice ID 9fcef4d1298b43d5b2a2c1d10f6df1f1
Notice type Presolicitation
Product / Service (PSC) AC13
NAICS 541519
Place of performance Hanscom AFB, Massachusetts
Archive date Nov 15, 2025

Award Information

Not yet awarded

Contacts

primary
Evan Pomfret

Email

secondary
Lauren Cheslofska

Email

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE MATERIEL COMMAND
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
COMMAND, CONTROL, COMMUNICATIONS & BATTLE MANAGEMENT
FA8730 KESSEL RUN AFLCMC/HBBK

Place of Performance

Hanscom AFB, Massachusetts
USA

Dates

Posted Oct 28, 2025 9 months ago
Last Updated Aug 06, 2026 1 day ago
Due Oct 31, 2025 9 months ago