Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 4 notices 12 documents

Aerospace Readiness Enterprise System (ARES) FA873026RB001

Solicitation FA873026RB001 Copied Notice ID c29ea529480f4f1aa6452abf7ed485bd Copied DEPT OF DEFENSE — FA8730 KESSEL RUN AFLCMC/HBBK
SAM.gov
Posted
Jan 13, 2026
Deadline
Jan 22, 2026
Set-aside
None
NAICS
541519
PSC
AC33

Summary

AI-generated · Dec 12, 2025

Prototype the Aerospace Readiness Enterprise System (ARES) as the Air Force’s enterprise solution for scheduling, standardization and evaluation (stan/eval), and training management, to replace legacy programs like Patriot Excalibur, Puckboard, and G/TIMS. Build the first use case as a low-cost, rapid prototyping effort that leverages commercial software where possible and is initially deployed in an IL-4 environment with a path to IL-6. The prototype should start from AETC requirements (while not excluding other MAJCOM needs) and aim to meet as many specified capabilities as possible; final acceptance will depend on meeting threshold requirements and objective criteria. Completion and availability for inspection are required within 90 calendar days after award.

Questions are accepted through the stated deadline, and interested bidders may request access to the Bidders Library, which will be provided securely. The effort supports the Air Force’s BATTLE NETWORK initiative by delivering enterprise scheduling, stan/eval, and training capabilities to enhance readiness and lethality.

Prototyping is a means of testing assumptions about technologies and approaches before expending significant amounts of effort or money building something that may not address the organization s problem. Prototyping is a low-cost, rapid risk mitigation approach. As such, we propose that the first Aerospace Readiness Enterprise System (ARES) use case be built as a prototype initially, with the following capability goals. ARES is the Air Force s enterprise solution for scheduling, standardization and evaluation (stan/eval) and training management which is intended to replace the Patriot Excalibur (PEX), Puckboard, and Graduate/Training Integration Management System (G/TIMS) legacy software programs. Specifically, ARES will leverage commercial software to the greatest extent possible and be deployed, initially, within the Impact Level (IL) 4 partition with a path to IL-6 deployment thereafter. Further, the Air Force, in support of the DAF BATTLE NETWORK, has an enduring requirement to deploy a robust solution which provides enterprise capabilities for scheduling, stan/eval, and training for increased readiness and lethality. Starting with the requirements of Air Education and Training Command (AETC) as the basis for this prototype, but not excluding requirements from other MAJCOMs, the prototype should meet as many of the following criteria as possible. Final acceptance of the prototype will be based on its ability to meet the threshold requirements outlined below. The final evaluation of the prototypes will also consider objective criteria as defined below. The prototype shall be completed and available for inspection and use no later than 90 calendar days after contract award. ****The following special instuctions below applies to this posting****** 1. Government will accept questions until 1600 EST on 19 December 2025. 2. To Recieve the Bidders Library please reach out to one the following POC: Shamieka Gilmore-Williams @ shamieka-gilmore-williams@us.af.mil, Lauren Cheslofska @ lauren.cheslofska@us.af.mil Leonardo Dominguez @ leonardo.dominguez.1@us.af.mil. Bidders Library will be sent via DOD SAFE

From Solicitation posted on Dec 11, 2025

Prototyping is a means of testing assumptions about technologies and approaches before expending significant amounts of effort or money building something that may not address the organization s problem. Prototyping is a low-cost, rapid risk mitigation approach. As such, we propose that the first Aerospace Readiness Enterprise System (ARES) use case be built as a prototype initially, with the following capability goals. ARES is the Air Force s enterprise solution for scheduling, standardization and evaluation (stan/eval) and training management which is intended to replace the Patriot Excalibur (PEX), Puckboard, and Graduate/Training Integration Management System (G/TIMS) legacy software programs. Specifically, ARES will leverage commercial software to the greatest extent possible and be deployed, initially, within the Impact Level (IL) 4 partition with a path to IL-6 deployment thereafter. Further, the Air Force, in support of the DAF BATTLE NETWORK, has an enduring requirement to deploy a robust solution which provides enterprise capabilities for scheduling, stan/eval, and training for increased readiness and lethality. Starting with the requirements of Air Education and Training Command (AETC) as the basis for this prototype, but not excluding requirements from other MAJCOMs, the prototype should meet as many of the following criteria as possible. Final acceptance of the prototype will be based on its ability to meet the threshold requirements outlined below. The final evaluation of the prototypes will also consider objective criteria as defined below. The prototype shall be completed and available for inspection and use no later than 90 calendar days after contract award. ****The following special instuctions below applies to this posting****** 1. Government will accept questions until 1600 EST on 19 December 2025. 2. To Recieve the Bidders Library Please reference section 2.6.7 in the ARES Request for Whitepapers document for process to request access to the Bidder s Library and please reach out to one the following POC: Shamieka Gilmore-Williams @ shamieka.gilmore-williams@us.af.mil Lauren Cheslofska @ lauren.cheslofska@us.af.mil Leonardo Dominguez @ leonardo.dominguez.1@us.af.mil Bidders Library will be sent via DOD SAFE

From Solicitation posted on Dec 12, 2025

Prototyping is a means of testing assumptions about technologies and approaches before expending significant amounts of effort or money building something that may not address the organization s problem. Prototyping is a low-cost, rapid risk mitigation approach. As such, we propose that the first Aerospace Readiness Enterprise System (ARES) use case be built as a prototype initially, with the following capability goals. ARES is the Air Force s enterprise solution for scheduling, standardization and evaluation (stan/eval) and training management which is intended to replace the Patriot Excalibur (PEX), Puckboard, and Graduate/Training Integration Management System (G/TIMS) legacy software programs. Specifically, ARES will leverage commercial software to the greatest extent possible and be deployed, initially, within the Impact Level (IL) 4 partition with a path to IL-6 deployment thereafter. Further, the Air Force, in support of the DAF BATTLE NETWORK, has an enduring requirement to deploy a robust solution which provides enterprise capabilities for scheduling, stan/eval, and training for increased readiness and lethality. Starting with the requirements of Air Education and Training Command (AETC) as the basis for this prototype, but not excluding requirements from other MAJCOMs, the prototype should meet as many of the following criteria as possible. Final acceptance of the prototype will be based on its ability to meet the threshold requirements outlined below. The final evaluation of the prototypes will also consider objective criteria as defined below. The prototype shall be completed and available for inspection and use no later than 90 calendar days after contract award. ****The following special instuctions below applies to this posting****** 1. Government will accept questions until 1600 EST on 19 December 2025. 2. To Recieve the Bidders Library Please reference section 2.6.7 in the ARES Request for Whitepapers document for process to request access to the Bidder s Library and please reach out to one the following POC: Shamieka Gilmore-Williams @ shamieka.gilmore-williams@us.af.mil Lauren Cheslofska @ lauren.cheslofska@us.af.mil Leonardo Dominguez @ leonardo.dominguez.1@us.af.mil Bidders Library will be sent via DOD SAFE

From Solicitation posted on Dec 23, 2025

****Update 13 January 2026, Includes and update to the posting to extend the due date and added attachments that Include questions and answers from Industry, please review all attachments***** Prototyping is a means of testing assumptions about technologies and approaches before expending significant amounts of effort or money building something that may not address the organization s problem. Prototyping is a low-cost, rapid risk mitigation approach. As such, we propose that the first Aerospace Readiness Enterprise System (ARES) use case be built as a prototype initially, with the following capability goals. ARES is the Air Force s enterprise solution for scheduling, standardization and evaluation (stan/eval) and training management which is intended to replace the Patriot Excalibur (PEX), Puckboard, and Graduate/Training Integration Management System (G/TIMS) legacy software programs. Specifically, ARES will leverage commercial software to the greatest extent possible and be deployed, initially, within the Impact Level (IL) 4 partition with a path to IL-6 deployment thereafter. Further, the Air Force, in support of the DAF BATTLE NETWORK, has an enduring requirement to deploy a robust solution which provides enterprise capabilities for scheduling, stan/eval, and training for increased readiness and lethality. Starting with the requirements of Air Education and Training Command (AETC) as the basis for this prototype, but not excluding requirements from other MAJCOMs, the prototype should meet as many of the following criteria as possible. Final acceptance of the prototype will be based on its ability to meet the threshold requirements outlined below. The final evaluation of the prototypes will also consider objective criteria as defined below. The prototype shall be completed and available for inspection and use no later than 90 calendar days after contract award. ****The following special instuctions below applies to this posting****** 1. Government will accept questions until 1600 EST on 19 December 2025. 2. To Recieve the Bidders Library Please reference section 2.6.7 in the ARES Request for Whitepapers document for process to request access to the Bidder s Library and please reach out to one the following POC: Shamieka Gilmore-Williams @ shamieka.gilmore-williams@us.af.mil Lauren Cheslofska @ lauren.cheslofska@us.af.mil Leonardo Dominguez @ leonardo.dominguez.1@us.af.mil Bidders Library will be sent via DOD SAFE

From Solicitation posted on Jan 13, 2026

Notice history

4
  1. Solicitation Posted Dec 11, 2025 View
  2. Solicitation Posted Dec 12, 2025
    • Description: Description was updated
  3. Solicitation Posted Dec 23, 2025
    • Response Deadline: Jan 09, 2026Jan 16, 2026
  4. Solicitation LATEST Posted Jan 13, 2026
    • Description: Description was updated
    • Response Deadline: Jan 16, 2026Jan 22, 2026

Details

Solicitation number FA873026RB001
Notice ID c29ea529480f4f1aa6452abf7ed485bd
Notice type Solicitation
Product / Service (PSC) AC33
NAICS 541519
Place of performance Hanscom AFB, Massachusetts
Archive date Feb 06, 2026

Award Information

Not yet awarded

Contacts

primary
Lauren Cheslofska

Email

secondary
Leonardo Dominguez, Capt

Email

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE MATERIEL COMMAND
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
COMMAND, CONTROL, COMMUNICATIONS & BATTLE MANAGEMENT
FA8730 KESSEL RUN AFLCMC/HBBK

Place of Performance

Hanscom AFB, Massachusetts
USA

Dates

Posted Jan 13, 2026 6 months ago
Last Updated Aug 06, 2026 1 day ago
Due Jan 22, 2026 6 months ago