Advance Notice: Maintenance Dredging of New York Harbor, Sandy Hook Federal Navigation Channel W912DS26BA016

Solicitation W912DS26BA016 Copied Notice ID 78eb0ac4abac47fd82d9a0dc547f75f0 Copied DEPT OF DEFENSE — W2SD ENDIST NEW YORK
SAM.gov
Posted
Apr 29, 2026
Deadline
May 14, 2026
Set-aside
None
NAICS
237990
PSC
Y1KF

Summary

AI-generated · Apr 30, 2026

Maintenance dredging of the Sandy Hook Channel requires removing about 190,000 cubic yards of shoaled material to a depth of -35 feet MLLW plus 2 feet overdepth, with the dredged material transported to and placed at the Sea Bright Offshore Borrow Area (SBOBA) located 5 miles southeast of Sandy Hook Point, NJ. Dredging will target only the shoaled sections of the channel and the material, primarily sand and gravel, must meet all applicable federal, state, and local placement-site criteria. The work aims to restore the authorized channel dimensions to ensure safe and economical use by military, commercial, and recreational boating, while enabling potential future beneficial use of the dredged material.

Contractors will use a mechanical dredge with a clamshell bucket and will need multiple ocean-going barges, tug boats, and supporting equipment to perform dredging, transport, and placement. Work must begin within five days of notification to proceed and be completed (basic work ready for use) within the time frame specified, with a minimum production rate of 8,000 cubic yards per day. Estimated project cost ranges from $1,000,000 to $5,000,000. The contract includes liquidated damages of $3,260 per calendar day of delay until completion.

Synopsis of Proposed Dredging - Maintenance Dredging of Sandy Hook Channel, New York Harbor, Federal Navigation Project. Background Information The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York Harbor, Sandy Hook Federal Navigation Channel. The dredged material would be dredged and subsequently transported to and placed at the Sea Bright Offshore Borrow Area (SBOBA), 5 miles southeast of Sandy Hook Point, NJ. The proposed maintenance dredging would remove approximately 190,000 cubic yards of selected critical shoals from the Sandy Hook Channel. Dredging would be required to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable overdepth. The dredged material is expected to consist primarily of sand and gravel. The purpose of the proposed work is to alleviate the effects of shoaling and restore the authorized project dimensions, thereby providing safe and economical use of Sandy Hook Channel by military, commercial and recreational boating interests while providing future beneficial use of the dredged material. Based on past dredging cycles, it is recommended that the proposed work only be performed by utilizing a mechanical dredge with a clamshell bucket. Additionally, multiple ocean-going barges, tug boats and ancillary equipment will be needed to perform the dredging, transport and placement activities. The entire channel will generally not require maintenance dredging; only areas where shoaling has reduced the depth of the channel will require dredging. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the placement site is located. The Contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and to prosecute said work diligently and to complete all basic work ready for use not later than ninety (60) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 8,000 cubic yards per calendar day. The work is estimated to cost between $1,000,000 and $5,000,000. Solicitation for the subject project is expected to be available in June 2026, with bid opening in July 2026. It is the intention of the government to award in August 2026 and issue the NTP within fourteen (14) calendar days of the award date. Liquidated Damages of $3,260.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted Procurement.

From Presolicitation posted on Apr 29, 2026

Notice history

1
  1. Presolicitation LATEST Posted Apr 29, 2026 View

Details

Solicitation number W912DS26BA016
Notice ID 78eb0ac4abac47fd82d9a0dc547f75f0
Notice type Presolicitation
Product / Service (PSC) Y1KF
NAICS 237990
Place of performance Highlands, New Jersey
Archive date May 29, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Brian Winters

Email

secondary
Nicholas P. Emanuel

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTH ATLANTIC
ENDIST NEW YORK
W2SD ENDIST NEW YORK

Place of Performance

Highlands, New Jersey 07732
USA

Dates

Posted Apr 29, 2026 3 months ago
Last Updated Aug 06, 2026 1 day ago
Due May 14, 2026 2 months ago