Administrative Building Roof Replacement, Cape Cod Canal, Bourne, MA W912WJ26QA007
Summary
AI-generated · Oct 18, 2025Replace the administration building roof at Cape Cod Canal, Bourne, MA. The project includes demolishing and removing existing roof components and installing a new dual-system roof: about 8,000 square feet of asphalt shingle roofing and about 1,200 square feet of EPDM flat roofing. The asphalt portion must use laminated shingles with a minimum 360 pounds per square and a 25-year warranty; the EPDM portion must be fully adhered, 90-mil nominal thickness, with a 30-year warranty. Work also covers new fascia and soffit trim, an aluminum gutter system with perimeter drip edge flashing, chimney restoration, replacement of three roof-top exhaust fans, replacement of two fresh air intakes, removal and reinstallation of the lightning protection system, and gutter cleaning. The estimated construction magnitude is $100,000 to $250,000.
All bidders must have an active SAM registration at the time of submission to be considered. The contractor will perform all work in accordance with the statement of work and applicable requirements.
THE WORK CONSISTS OF: Contractor shall include all labor, equipment, tools, and materials to demolish, remove, dispose of the existing roof components and install a new roof on the administration office building in accordance with this statement of work at the Cape Cod Canal, Bourne, MA. The administration building has (2) roof types, consisting of approximately 8000 square feet of asphalt shingles and approximately 1200 square feet of Ethylene Propylene Diene Monomer (EPDM) flat roof system. The new asphalt roof system shall be installed with asphalt laminated shingles, minimum 360 pounds per square, with a manufacturer's standard 25 year warranty. The new EPDM roof system shall be a fully adhered 90 mil nominal thickness with a manufacturer's standard 30 year warranty. Work includes providing new facia trim boards, soffit trim boards, aluminum gutter system, perimeter aluminum drip edge flashing, chimney restoration, replacing (3) existing roof top exhaust fans, replacing (2) existing fresh air intakes, remove and reinstall existing lightning protection system, and cleaning out the existing gutters. The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 238160 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
From Solicitation posted on Oct 17, 2025THE WORK CONSISTS OF: Contractor shall include all labor, equipment, tools, and materials to demolish, remove, dispose of the existing roof components and install a new roof on the administration office building in accordance with this statement of work at the Cape Cod Canal, Bourne, MA. The administration building has (2) roof types, consisting of approximately 8000 square feet of asphalt shingles and approximately 1200 square feet of Ethylene Propylene Diene Monomer (EPDM) flat roof system. The new asphalt roof system shall be installed with asphalt laminated shingles, minimum 360 pounds per square, with a manufacturer's standard 25 year warranty. The new EPDM roof system shall be a fully adhered 90 mil nominal thickness with a manufacturer's standard 30 year warranty. Work includes providing new facia trim boards, soffit trim boards, aluminum gutter system, perimeter aluminum drip edge flashing, chimney restoration, replacing (3) existing roof top exhaust fans, replacing (2) existing fresh air intakes, remove and reinstall existing lightning protection system, and cleaning out the existing gutters. The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 238160 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
From Solicitation posted on Oct 22, 2025THE WORK CONSISTS OF: Contractor shall include all labor, equipment, tools, and materials to demolish, remove, dispose of the existing roof components and install a new roof on the administration office building in accordance with this statement of work at the Cape Cod Canal, Bourne, MA. The administration building has (2) roof types, consisting of approximately 8000 square feet of asphalt shingles and approximately 1200 square feet of Ethylene Propylene Diene Monomer (EPDM) flat roof system. The new asphalt roof system shall be installed with asphalt laminated shingles, minimum 360 pounds per square, with a manufacturer's standard 25 year warranty. The new EPDM roof system shall be a fully adhered 90 mil nominal thickness with a manufacturer's standard 30 year warranty. Work includes providing new facia trim boards, soffit trim boards, aluminum gutter system, perimeter aluminum drip edge flashing, chimney restoration, replacing (3) existing roof top exhaust fans, replacing (2) existing fresh air intakes, remove and reinstall existing lightning protection system, and cleaning out the existing gutters. The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 238160 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
From Solicitation posted on Oct 23, 2025THE WORK CONSISTS OF: Contractor shall include all labor, equipment, tools, and materials to demolish, remove, dispose of the existing roof components and install a new roof on the administration office building in accordance with this statement of work at the Cape Cod Canal, Bourne, MA. The administration building has (2) roof types, consisting of approximately 8000 square feet of asphalt shingles and approximately 1200 square feet of Ethylene Propylene Diene Monomer (EPDM) flat roof system. The new asphalt roof system shall be installed with asphalt laminated shingles, minimum 360 pounds per square, with a manufacturer's standard 25 year warranty. The new EPDM roof system shall be a fully adhered 90 mil nominal thickness with a manufacturer's standard 30 year warranty. Work includes providing new facia trim boards, soffit trim boards, aluminum gutter system, perimeter aluminum drip edge flashing, chimney restoration, replacing (3) existing roof top exhaust fans, replacing (2) existing fresh air intakes, remove and reinstall existing lightning protection system, and cleaning out the existing gutters. The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 238160 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
From Solicitation posted on Oct 28, 2025THE WORK CONSISTS OF: Contractor shall include all labor, equipment, tools, and materials to demolish, remove, dispose of the existing roof components and install a new roof on the administration office building in accordance with this statement of work at the Cape Cod Canal, Bourne, MA. The administration building has (2) roof types, consisting of approximately 8000 square feet of asphalt shingles and approximately 1200 square feet of Ethylene Propylene Diene Monomer (EPDM) flat roof system. The new asphalt roof system shall be installed with asphalt laminated shingles, minimum 360 pounds per square, with a manufacturer's standard 25 year warranty. The new EPDM roof system shall be a fully adhered 90 mil nominal thickness with a manufacturer's standard 30 year warranty. Work includes providing new facia trim boards, soffit trim boards, aluminum gutter system, perimeter aluminum drip edge flashing, chimney restoration, replacing (3) existing roof top exhaust fans, replacing (2) existing fresh air intakes, remove and reinstall existing lightning protection system, and cleaning out the existing gutters. The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 238160 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
From Solicitation posted on Oct 29, 2025Notice history
6-
-
Solicitation Posted Oct 22, 2025No changes from previous notice
-
Solicitation Posted Oct 23, 2025No changes from previous notice
-
Solicitation Posted Oct 29, 2025No changes from previous notice
-
Award Notice LATEST Posted Dec 29, 2025
Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| A1 HOME IMPROVEMENT LLC | YUCYR7EXHPA5 | 14NM3 | Berlin, CT |
Contacts
Phone