Addition/Repair Medical Training Facility, B3120, Eglin Air Force Base, FL W912QR-51061297
Summary
AI-generated · Aug 23, 2025Begin immediately with the substance:
Construct an addition to Building 3120 at Eglin Air Force Base to create a conditioned indoor space for SOMDS training and administrative functions. The work includes a concrete foundation and floor slab, a steel frame, a standing-seam metal sloped roof, exterior walls of split-faced CMU and brick veneer, interior metal stud and gypsum board walls, interior finishes, and all related mechanical, electrical, and communications systems plus supporting utilities. The project also encloses the existing covered drive, reconfigures adjacent rooms as needed, and adds a 40-car parking area to the southeast of B3120.
Amendments have updated plan sheets and specifications, with the addition of certified final plans and specs in a later update. A site visit sign-in sheet has been uploaded. The posting is restricted to Southeast Region MATOC pool contract holders, and the solicitation’s due date has been extended multiple times, with the latest amendment pushing the date further.
****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET. *****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB. *****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET *****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET ***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET ***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule ***** Uploaded Site Visit Sign-In Sheet *********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055 This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
From Solicitation posted on Jun 18, 2025****Amendment 0006 extending the due date to 9 July @ 10 AM ET. ****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET. *****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB. *****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET *****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET ***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET ***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule ***** Uploaded Site Visit Sign-In Sheet *********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055 This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
From Solicitation posted on Jul 01, 2025****Amendment 0007 extending the due date to 16 July @ 10 AM ET. ****Amendment 0006 extending the due date to 9 July @ 10 AM ET. ****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET. *****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB. *****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET *****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET ***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET ***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule ***** Uploaded Site Visit Sign-In Sheet *********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055 This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
From Solicitation posted on Jul 09, 2025****Amendment 0008 providing certified final plans and specs and extending the due date to 18 July @ 2 PM ET. ****Amendment 0007 extending the due date to 16 July @ 10 AM ET. ****Amendment 0006 extending the due date to 9 July @ 10 AM ET. ****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET. *****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB. *****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET *****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET ***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET ***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule ***** Uploaded Site Visit Sign-In Sheet *********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055 This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
From Solicitation posted on Jul 15, 2025****Amendment 0009 extending the due date to 23 July @ 2 PM ET. ****Amendment 0008 providing certified final plans and specs and extending the due date to 18 July @ 2 PM ET. ****Amendment 0007 extending the due date to 16 July @ 10 AM ET. ****Amendment 0006 extending the due date to 9 July @ 10 AM ET. ****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET. *****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB. *****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET *****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET ***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET ***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule ***** Uploaded Site Visit Sign-In Sheet *********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055 This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.
From Solicitation posted on Jul 17, 2025Notice history
5-
Solicitation Posted Jun 18, 2025
-
Solicitation Posted Jul 01, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 02, 2025 → Jul 09, 2025
-
Solicitation Posted Jul 09, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 09, 2025 → Jul 16, 2025
-
Solicitation Posted Jul 15, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 16, 2025 → Jul 18, 2025
-
Solicitation LATEST Posted Jul 17, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 18, 2025 → Jul 23, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA