Contacts, documents and full notice history are available with a subscription.
Justification 1 notice

Additional requirements for A/E services related to the Electric Upgrade Work. The awarded contractor has completed the phase I project back in 2021. 19PK5025Q7002

Solicitation 19PK5025Q7002 Copied Notice ID 1cbc083e6b9f4d498afa4ae0e3a8b76b Copied STATE, DEPARTMENT OF — AMERICAN CONSULATE LAHORE
SAM.gov
Posted
Aug 26, 2025
Deadline
No deadline
Set-aside
None
NAICS
5413
PSC
C222

Summary

AI-generated · Aug 27, 2025

Audit and scope development for remaining electrical upgrade tasks at the Consulate compound to be performed by the same engineering firm that completed Phase I, based on proven performance and familiarity with the project; the effort will cover Task 4, Task 5, and additional items under the updated scope of work, with an updated scope and cost estimates as deliverables.

The consulate’s electrical system is aging and has undergone numerous changes (generator sizes, HAT1s, police village, relocation of residences), with wiring, panels, fire alarms, and grounding not up to code and presenting safety risks. A detailed audit is required to fully define the upgrade scope and to produce the scope of work and cost estimates for the proposed upgrades.

Identification of the agency and the contracting activity:This is a justification for other than full and open competition for an acquisition being conducted by the Department of State, General Services Office of the U.S. Consulate General Lahore, Pakistan. Nature and/or description of the action being approved. PR15275741- LHE FAC A/E Services for the Electrical Upgrade Study at CGOB Sec II has been submitted, along with the original Scope of Work (SOW) and additional details required to complete the remaining A/E service tasks listed in the SOW. Previously, under Purchase Order 19PKS021P7159 awarded on November 01, 2021, three project tasks were assigned to the contractor Project Engineering & Management Services. The contractor successfully completed the study work related to the first part of the SOW. All deliverables under the previous PO were submitted on time, accepted by 080 Electrical, and met the required standards. Given the contractor's proven performance and familiarity with the project scope, it is considered the most suitable and efficient option to engage the same firm for completing the remaining tasks- namely Task 4, Task 5, and additional items outlined in the updated SOW. A description of the supplies or services required to meet the Agency's needs Consulate compound is very old and in past it went through many changes that includes changes of generator sizes, inclusion of HAT1s, Police village, and move of all USDH residences to office building. Existing installations, all electrical panels, Fire Alarms and other systems are very old and potential cause of failure at any time. Electrical wiring and panels are not code compliant and have safety issues. Grounding is also not code compliant. It is recommended to first conduct a detail study to first understand complete scope of compound electrical upgrade scope and estimates. It is therefore recommended to hire services of engineering firm to first audit, report and then provide scope of work for these proposed upgrades.

From Justification posted on Aug 26, 2025

Notice history

1
  1. Justification LATEST Posted Aug 26, 2025

Details

Solicitation number 19PK5025Q7002
Notice ID 1cbc083e6b9f4d498afa4ae0e3a8b76b
Award number 19PK5025P7116
Notice type Justification
Product / Service (PSC) C222
NAICS 5413
Place of performance Lahore, Punjab
Archive date Sep 25, 2025

Award Information

Awardees
0
Award Date
Jun 25, 2025

Documents

No files available

View on SAM.gov

Contacts

primary
Musawar Sultan

Email

Phone

00924236034200

secondary
Umair Shahzad

Email

Phone

0092426034200

Agency

STATE, DEPARTMENT OF
STATE, DEPARTMENT OF
AMERICAN CONSULATE LAHORE

Place of Performance

Lahore, Punjab 54000
PAK

Dates

Posted Aug 26, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Awarded Jun 25, 2025 1 year ago