ACC002 Utilities and Infrastructure W911KB26RWP01
Summary
AI-generated · Aug 07, 2026Acquires Preconstruction Services and construction for the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf-Richardson (JBER), Alaska, as Phase I of a multi-phase effort to prepare a 500+ acre site and establish critical civil utilities and airfield infrastructure. Work must be highly sequenced to maintain uninterrupted operations and accommodate staggered facility occupancy dates due to complex topography and concurrent MILCON schedules. The arrangement uses an Other Transaction (OT) Agreement under 10 USC 2808a for military construction projects involving testing and emergent construction technologies, with Construction Manager at Risk (CMAR) as the anticipated delivery method. Phase I Pre-Construction Services require the OT Awardee to collaborate with the Government to define scope, constructability, budget, quality, and schedule, and to coordinate with the Designer of Record.
Phase II involves construction once the design reaches about 65–95 percent, at which point the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, construction proceeds; if not, the Government retains an off-ramp to complete the project by alternative methods. The project emphasizes leveraging innovative construction approaches to enhance mission resilience, improve installation support, and reduce cost and schedule.
The US Army Corps of Engineers USACE Alaska District has a requirement for Preconstruction Services and construction for the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf Richardson JBER Alaska. This project executes Phase I of a multi phase recapitalization program to prepare a 500 plus acre site and establish the critical civil utility and airfield infrastructure. Due to complex topography and concurrent MILCON construction schedules the work must be highly sequenced to ensure uninterrupted operational capabilities and facilitate staggered facility occupancy dates. Utilizing an Other Transaction OT Agreement under the authority of 10 USC 2808a Facility Construction or Repair Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 USC 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience improved installation support or cost and schedule reduction. The anticipated delivery method is Construction Manager at Risk CMAR. Phase 1 Pre Construction Services The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the projects scope constructability budget quality schedule and in coordination with the Designer of Record DOR. Phase 2 Construction Upon reaching an agreed upon level of design such as 65 percent to 95 percent the Awardee will propose a Guaranteed Maximum Price GMP. If the GMP is accepted the Government will exercise construction execution. If a GMP cannot be agreed upon the Government retains an off ramp to complete the construction of the facility via alternative methods.
From Solicitation posted on Aug 07, 2026Notice history
1-
Solicitation LATEST Posted Aug 07, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone