Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation 8A Expired 1 notice 14 documents

ABDR TRAILERS FA8100-25-R-B007

Solicitation FA8100-25-R-B007 Copied Notice ID ece8ab359e50448bbcd6f0d9aae1c2f1 Copied DEPT OF DEFENSE — FA8100 AFSC PZIEC
SAM.gov
Posted
Jun 25, 2025
Deadline
Jun 25, 2025
Set-aside
8A
NAICS
336214
PSC
2330

Summary

AI-generated · Aug 24, 2025

ABDR TRAILERS are the subject of a Combined Synopsis/Solicitation. The Description field is empty in this record, so the specific requirements (scope, quantity, delivery timeline, and evaluation criteria) are not provided here.

*This RFP was originally posted on 05/20/2025/ but had to be deleted and re-posted 05/29/2025 due to the notice ID changing from FA8100-25-Q-B001 to FA8100-25-R-B007. Due date does not change. *This RFP had to be amended on 06/04/2025 to replace Version 1 of attachment 2 (Inventory Listing) with version 2. Removal of the Drill Bit and Diamond Cutter was necessary as they are no longer required. Due date does not change. *This RFP had to be amended on 06/11/2025 to add attachment 11 ABDR Trailer Planning Contractor Q & A Number 1 and add a revised copy of the CSS. On the CSS, Tanner Mullins email changed from tanner.mullins@us.af.mil to tanner.mullins.1@us.af.mil, a sentence was deleted out of shipping information as it is no longer required, and on the list of attachments on page 6 attachment 11 was added. Due date does not change. *This RFP had to be amended on 06/13/2025 to post attachment 12 ABDR Trailer Planning Contractor Q & A Number 2 (13 Jun 25) and to extend the due date to 06/25/2025. *This RFP had to be amended on 06/18/2025 to post revised copies of CSS, Attachment 1 Statement of Work, Attachment 10 pricing matrix, Attachment 11 Q & A number 1, and Attachment 12 Q & A number 2. On the revised CSS please see section 2 as that had to be updated and attachment 10 had to be revised to reflect the changes to the CSS. For attachment 1 Statement of Work please see paragraphs 1.3.7, 1.3.9, and 1.5.1. On attachment 11 and 12 Q&A please see highlighted portions as those are the portions that had to be revised. Due date does not change. * This RFP was amended on 06/20/2025 to post a revised CSS document. The revised CSS properly reflects the proposal due date of 25 June 2025 by 4 PM, Central Standard. In addition, the revision to the CSS corrects the list of attachements by adding Attachment 12, which has already been provided in the past, and correcting some of the listed document dates. * Attachment 6 Instructions to Offerors, paragraph 6.1.1 should state ‘Offer shall complete Sections 1, 2, and signature and date for Section 3 of the Combined Synopsis / Solicitation. Signature by the offeror on the Combined Synopsis / Solicitation constitutes an offer, which the Government may accept. The "original" copy should be clearly marked under separate cover.’ CUI//SSEL Request for Proposal Subject: Aircraft Battle Damage Repair (ABDR) Trailers NAICS: 336214 Solicitation Number: FA8100-25-R-B007 Contracting Office Address: 7858 5th St. Bldg. 3, Tinker AFB, OK 73145-3303 Contracting Officer: Brent Rockow, brent.rockow.1@us.af.mil Tanner Mullins, tanner.mullins.1@us.af.mil Purpose: Produce and deliver ABDR Trailers that will reside at multiple OCONUS locations. The internal contents within the trailer must follow the basic configuration design of the current ABDR Tool Trailer located at Wright Patterson AFB. The ABDR Trailer is a commercial item, and/or comprised of a combination of commercial products, with modifications customarily available in the commercial marketplace which was developed at United States Government expense. ABDR Trailers must be capable of long-term sustainment in harsh weather environments and must include maintenance data necessary for lifetime sustainment. These trailers must contain non-hazardous tooling and parts required for execution of rapid repairs for aircraft. These trailers would be stored in facilities ranging from fully enclosed supply buildings to open-ended hangar storage, but deployed to Forward Operating Bases, and improvised landing locations outside, in order to support mission requirements. Desired end state is to have a mobile, self-sustained tool and working platform to increase out employment during a war time scenario. Contract Length: The ordering period under this proposed indefinite delivery indefinite quantity (IDIQ) contract action shall be from intiial contract award through each exercised option ordering periods for a Maximum contract length of ten (10) years. Electronic procedures will be used for this solicitation.

From Combined Synopsis/Solicitation posted on Jun 25, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Jun 25, 2025 View

Details

Solicitation number FA8100-25-R-B007
Notice ID ece8ab359e50448bbcd6f0d9aae1c2f1
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 2330
NAICS 336214
Place of performance S Coffeyville, Oklahoma
Archive date Jul 10, 2025

Award Information

Not yet awarded

Contacts

primary
Tanner Mullins

Email

secondary
Brent Rockow

Email

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE MATERIEL COMMAND
AIR FORCE SUSTAINMENT CENTER
FA8100 AFSC PZIEC

Place of Performance

S Coffeyville, Oklahoma
USA

Dates

Posted Jun 25, 2025 1 year ago
Last Updated Aug 05, 2026 2 days ago
Due Jun 25, 2025 1 year ago