AATTC Trailer Reconfiguration W50S7G26RA005
Summary
AI-generated · Jan 09, 2026A three-phase trailer reconfiguration project at AATTC involves upgrading the South trailers and then decommissioning the North trailer group. Phase 1 focuses on interior facility upgrades to the AATTC South trailers, while Phase 2 covers exterior facility upgrades to the AATTC South trailers.
Phase 3 decommissions and removes the North trailer group from the base, repairs the decking where North and South trailer groups join, constructs new guardrails and stairs on the decking, removes cameras and low-voltage wiring from the North trailers, and removes the North trailer skirting and lockable access panel.
AATTC North and South Trailer Reconfiguration Phase 1 involves interior facility upgrades to AATTC South trailers. Phase 2 focuses on exterior facility upgrades to the AATTC South trailers. Phase 3 - Decommission and remove North trailer group from base and repairs to the existing decking that joined North and South trailer groups, construction of new guardrail and stairs on decking, removal of cameras and low-voltage wiring from North trailers, removal of North trailer skirting and lockable access panel.
From Solicitation posted on Jan 08, 2026AATTC North and South Trailer Reconfiguration Phase 1 involves interior facility upgrades to AATTC South trailers. Phase 2 focuses on exterior facility upgrades to the AATTC South trailers. Phase 3 - Decommission and remove North trailer group from base and repairs to the existing decking that joined North and South trailer groups, construction of new guardrail and stairs on decking, removal of cameras and low-voltage wiring from North trailers, removal of North trailer skirting and lockable access panel. 09 Jan 2026 - Added missing document.
From Solicitation posted on Jan 09, 2026AATTC North and South Trailer Reconfiguration Phase 1 involves interior facility upgrades to AATTC South trailers. Phase 2 focuses on exterior facility upgrades to the AATTC South trailers. Phase 3 - Decommission and remove North trailer group from base and repairs to the existing decking that joined North and South trailer groups, construction of new guardrail and stairs on decking, removal of cameras and low-voltage wiring from North trailers, removal of North trailer skirting and lockable access panel. 09 Jan 2026 - Added missing document. 21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time.
From Solicitation posted on Jan 21, 2026AATTC North and South Trailer Reconfiguration Phase 1 involves interior facility upgrades to AATTC South trailers. Phase 2 focuses on exterior facility upgrades to the AATTC South trailers. Phase 3 - Decommission and remove North trailer group. 09 Jan 2026 - Added missing document. 21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time. 22 Jan 2026 - Uploaded Amendment 0001 and Revision 01 of the Statement of Work. Please have completed background check forms submitted to MSgt Glise by 10AM Local Time on January 23rd, 2026.
From Solicitation posted on Jan 22, 2026AATTC North and South Trailer Reconfiguration Phase 1 involves interior facility upgrades to AATTC South trailers. Phase 2 focuses on exterior facility upgrades to the AATTC South trailers. Phase 3 - Decommission and remove North trailer group. 09 Jan 2026 - Added missing document. 21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time. 22 Jan 2026 - Uploaded Amendment 0001 and Revision 01 of the Statement of Work. Please have completed background check forms submitted to MSgt Glise by 10AM Local Time on January 23rd, 2026. 28 Jan 2026 - Uploaded Solicitation W50S7G26RA0050002 conformed, Amendment 0002, Revision 02 of the Statement of Work, Question and Answers dated 28 January 2026 and three photos (decking north trailer side, decking south trailer side and additional floor box). *** NOTE: Solicitation W50S7G25RA0050002 Conformed contains revised contract line item descriptions for proposal pricing.***
From Solicitation posted on Jan 28, 2026AATTC North and South Trailer Reconfiguration Phase 1 involves interior facility upgrades to AATTC South trailers. Phase 2 focuses on exterior facility upgrades to the AATTC South trailers. Phase 3 - Decommission and remove North trailer group. 09 Jan 2026 - Added missing document. 21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time. 22 Jan 2026 - Uploaded Amendment 0001 and Revision 01 of the Statement of Work. Please have completed background check forms submitted to MSgt Glise by 10AM Local Time on January 23rd, 2026. 28 Jan 2026 - Uploaded Solicitation W50S7G26RA0050002 conformed, Amendment 0002, Revision 02 of the Statement of Work, Question and Answers dated 28 January 2026 and three photos (decking north trailer side, decking south trailer side and additional floor box). *** NOTE: Solicitation W50S7G25RA0050002 Conformed contains revised contract line item descriptions for proposal pricing.*** 29 Jan 2026 - Uploaded Sign-in sheet from the Site Visit held on January 27th, 2026. Uploaded an informational drawing for the south trailer group, "ULYB262003 South Trailer Group First Floor Plan"
From Solicitation posted on Jan 29, 2026Notice history
6-
-
Solicitation Posted Jan 21, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Jan 27, 2026 → Jan 30, 2026
Details
Award Information
Not yet awarded
Contacts