9930--Supply & Inscribe F1 Marble Markers for MPS 36C78625Q0096
Summary
AI-generated · Aug 23, 2025Procure and deliver a finished, all-inclusive product: manufacture, inscribe, package, palletize, and deliver F1 Marble Markers for MPS to CONUS destinations. Markers are white marble with exact sample dimensions of 24 inches wide, 12 inches tall, and 3/4 inch thick (the required sample will include lithochrome lettering). Deliveries must occur within 26 calendar days after manufacture for normal CONUS items, and the contract covers all labor, materials, engraving, packaging, and destination delivery.
Key changes noted in amendments: the procurement is clarified as a supply contract (not a service contract), with SCA wage determinations removed; granite was removed from evaluation factors; the Statement of Work now requires aging reports and adds lithochrome application to samples; delivery and reporting requirements (including weekly status reports and minimum invoice content) were updated, and the Gantt Chart submission guidance was corrected. Quoters must acknowledge all amendments; there is no SF30 signing for amendments, and failure to acknowledge makes a bidder non-responsive.
Supply & Inscribe F1 Marble Markers for MPS
From Combined Synopsis/Solicitation posted on Jun 25, 2025Supply & Inscribe F1 Marble Markers for MPS The purpose of this amendment is to address submitted questions and to provide a revised combined synopsis/solicitation and Statement of Work. The response due date and time is NOT extended and remains on 25 July 2025 at 10:00 a.m. CST. The Combined Synopsis/Solicitation and Statement of Work have been revised and are attached separately to this amendment. The Combined Synopsis/Solicitation has been revised to include but not limited to, add clarifying information regarding sample and to remove references to Service Contract Act Wage Determinations, including Attachment D. The Statement of Work has been revised, to include but not limited to, changing the marble color from gray to white (Section 4.3), to solidify the requirement delivery of 26 calendar days for normal CONUS items, to revise the elements of the required Weekly Status Report and to add the minimum content items required for invoices. Note: There will not be a SF30 to sign for this amendment. Quoters shall provide a statement of acknowledgement and receipt of any and all amendments. Failure to acknowledge all amendments will result in the Interested Quoter being considered non-responsive and ineligible for award. Questions and Answers: Q: The sample in the combined synopsis is asking for a 24 x 13 stone engraved. The F1 marker is a 24 x12 stone. Would you still like the sample to be 24 x 13 or should we make it 24 x 12 ? A: Sample dimensions shall be: Width - 24 in., Thickness - 3/4 in. and Height - 12 in. The combined synopsis/solicitation document has been revised to reflect this and is attached separately to this amendment. Q: In the Statement of Work, 5.4 Performance Period, it states the contractor will have 26 calendar days for manufacture and deliver CONUS. But on 8.1 Normal Delivery: it states, "All markers shall be manufactured and placed on a transportation carrier for delivery within 26 calendar days." Which do you want? A: Section 8.1 has been revised to match Section 5.4. See revised SOW. Q: Why do you have this contract as a Service Contract instead of a Supply Contract? It is clear by the statement of work that this is classic example of a Supply Contract. 3.0 General: "The contractor shall be responsible for providing all labor and materials needed to manufacture, inscribe, package, palletize and deliver. (providing a tangible finished product). 3.0 Unit price: "the unit price is all-inclusive and covers the completed monuments delivered FOB destination." Again an all inclusive tangible finished product. This is much different than for instance an on-site engraving contract where the government is furnishing stones and the contractor is only doing the engraving. That is clearly a service contract. This contract is for an all-inclusive delivered finished product and the core purpose of the contract is for the government and its veterans to receive finished goods. I'm pretty sure this was litigated a few years back and it was determined that these contracts are in fact Supply Contracts. A: The NAICS used for this requirement is 327991, Cut Stone and Stone Product Manufacturing, and the PSC is 9930, Memorials; Cemeterial and Mortuary Equipment and Supplies. Reference to the Service Contract Act Wage Determinations and Attachment D are removed from the solicitation. The combined synopsis/solicitation document has been revised to reflect this.
From Combined Synopsis/Solicitation posted on Jul 11, 2025Supply & Inscribe F1 Marble Markers for MPS The purpose of this amendment is to provide revised combined synopsis/solicitation and Statement of Work documents. The response due date and time is NOT extended and remains on 25 July 2025 at 10:00 a.m. CST. The Combined Synopsis/Solicitation and Statement of Work have been revised and are attached separately to this amendment. The Combined Synopsis/Solicitation has been revised to add the requirement of lithochrome application to the samples. The Statement of Work has been revised to include information regarding the Aging Report. Note: There will not be a SF30 to sign for this amendment. Quoters shall provide a statement of acknowledgement and receipt of any and all amendments. Failure to acknowledge all amendments will result in the Interested Quoter being considered non-responsive and ineligible for award.
From Combined Synopsis/Solicitation posted on Jul 15, 2025Supply & Inscribe F1 Marble Markers for MPS The purpose of this amendment is to provide a revised combined synopsis/solicitation which is attached separately to this amendment. The response due date and time is NOT extended and remains on 25 July 2025 at 10:00 a.m. CST. The Combined Synopsis/Solicitation has been revised to remove granite from the evaluation factors and to correct the item required for the Gantt Chart submission. Note: There will not be a SF30 to sign for this amendment. Quoters shall provide a statement of acknowledgement and receipt of any and all amendments. Failure to acknowledge all amendments will result in the Interested Quoter being considered non-responsive and ineligible for award.
From Combined Synopsis/Solicitation posted on Jul 17, 2025Notice history
4-
Combined Synopsis/Solicitation Posted Jun 25, 2025
-
Combined Synopsis/Solicitation Posted Jul 11, 2025View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation Posted Jul 15, 2025View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation LATEST Posted Jul 17, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Contacts
Weston Worsham and Patara Mcdonald
Phone