66--PROCESSOR SOLID - AND OTHER REPLACEMENT PARTS N0038326QNA12
Summary
AI-generated · Oct 30, 2025Replacement parts are needed for a flight-critical item identified as NSN 1R-6605-016904017-V2 (Processor Solid and related components), with an order quantity of 25 each, delivered FOB origin. The government cannot obtain the necessary technical data or adequately description the item for a competitive solicitation, so the procurement will be conducted as a sole-source action with only previously approved sources asked to respond. If a new source approval is required, it must be completed before award; otherwise the contract may proceed to meeting fleet support needs.
Interested providers that are not yet approved must submit the required information per NAVSUP Weapon Systems Support source-approval brochures (spares or repair). Proposals from all responsible sources will be considered, but approval timing can affect award, and the government may proceed without delay if approval cannot be obtained in time. The notice notes a 45-day (or 30 days under an existing BOA) window for responses, and emphasizes that the final decision to pursue competition rests with the government.
NSN 1R-6605-016904017-V2, TDP VER 001, QTY 25 EA, DELIVERY FOB ORIGIN. The data needed to acquire/repair this part competitively is not physically available, it cannot be obtained economically, nor is it possibleto draft adequate specifications or any other adequate, economical description of the material for a competitive solicitation. The subject item requires Government source approval prior to contract award, as the item is flight critical and/or the technical data available has not been determined adequate to support acquisition via full and open competition. Only the source(s) previously approved by the Government for this item have been solicited. The time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source. If you are not an approved source you must submit, together with your proposal, the information detailed in one of the NAVSUP Weapon Systems Support (NAVSUP WSS) Source Approval Information Brochures listed below. Spares: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Sup port/Business-Opps/ Repair: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP -Weapon-Systems-Support/Business-Opps/ technical data required to be submitted based on your company's experience in production of the same or similar item, or if this is an item you have never made. If your request for source approval is currently being evaluated at NAVSUP WSS submit with your offer a copy of the cover letter which forwarded your request for source approval. Offers received which fail to provide all data required by the Source Approval Brochure or document previous submission of all data required by the Source Approval Brochure will not be considered for award under this solicitation. Please note, if evaluation of a source approval request submitted hereunder cannot be processed in time and/or approval requirements preclude the ability to obtain subject items in time to meet Government requirements, award of the subject requirement may continue based on Fleet support needs. The NAVSUP WSS Commercial Item Identification Brochure is now available at: "https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Bus iness-Opps/" Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-2667 or 215-697-2179 (DSN: 442-2667), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.
From Presolicitation posted on Oct 29, 2025CONTACT INFORMATION|4|N731.53|M3K|7712292576|DINA.M.WOJCIECHOWSKI.CIV@US.NAVY.MIL| COMMERCIAL PRODUCT PROCUREMENT NOTICE|5|||||| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORTS (COMBO)|INSPECTION SITE SOURCE FINAL ACCEPTANCE SITE SOURCE|TBD|N00383|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 YEAR AFTER DATE OF DELIVERY|45 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVEORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2025)(DEVIATION 2025-O|81|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| CUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2025)(DEVIATION|16||||||||||||||||| SERVICES (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|335999|600||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)|4||||| This RFQ is for a repair. The Small Business Administration representative at NAVSUP WSS has reviewed this requirement and determined that a set-aside recommendation was not applicable for this procurement. This contract/purchase order is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/purchase order. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
From Solicitation posted on Nov 18, 2025Notice history
2-
-
Solicitation LATEST Posted Nov 18, 2025View changes (4)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Dec 15, 2025 → Nov 28, 2025
- NAICS Codes: None → 335311
Details
Award Information
Not yet awarded