6515--Ultrasonic Cleaning System 36C24826Q0364
Summary
AI-generated · Feb 27, 2026Procurement of an Ultrasonic Cleaning System under RFQ 36C24826Q0364, with the effort moving from a presolicitation to a formal solicitation and bidders responding via the RFQ process. No specific brand-name, certifications, or site-visit requirements are indicated in the provided notices.
No award information has been posted yet; award dates and amounts are not provided, suggesting no contract has been issued at this time. The notices do not reveal any additional or unique requirements beyond the basic Ultrasonic Cleaning System need.
See attached Presolicitation Notice for 36C24826Q0364 Ultrasonic Cleaning System
From Presolicitation posted on Feb 26, 2026See attached Solicitation for RFQ 36C24826Q0364 - Ultrasonic Cleaning System
From Solicitation posted on Feb 26, 2026Amendment to provide response to Questions for RFQ 36C24826Q0364. RFQ 36C24826Q0336 QUESTIONS & RESPONSES Q1. Is this an SDVOSB set-aside? A1. It is 100% SDVOSB Set-Aside Q2. Can we be considered for rule of 2? A2. As indicated in Block 10 of the 1449 (first page of RFQ), only SDVOSB distributors will be considered for this solicitation since it is a 100% Set-Aside. Q3. Clarify the required tank capacity, internal dimensions, and any maximum footprint constraints for the Ultrasonic cleaning system? A3. Twin basins 30 gallon/basin, 80lb total weight capacity Q4. Clarify the minimum essential features, modes, or functionalities required for this Ultrasonic Cleaning System?" A4. Twin basins Q5. Is there a specific manufacturer required, or is this a "Brand Name or Equal" requirement? A5. Getinge Triton 72 or equal. Q6. Are we required to include starter consumables (e.g., enzymatic detergents) or specific instrument baskets/trays in our quote? A6. Contractor will provide startup supplies Q7. Does the Government require the contractor to provide inside delivery, uncrating, setup, installation, and/or user training, or will VA Sterile Processing Service (SPS) personnel handle the installation? A7. Contractor will be responsible for delivery, uncrating and installation. Q8. What are the electrical requirements for the designated installation space (e.g., 110V, 208V, or 240V; single or three-phase)? A8. 208V Q9. Are there specific plumbing requirements or constraints at the installation site for water supply and drainage? A9. No special plumbing or drainage requirement at site. Q10. Is there an existing unit that needs to be decommissioned, removed, and disposed of by the contractor? A10. No Q11. What is the anticipated Required Delivery Date (RDD) for this procurement? A11. Within 60 days of contract award Q12. Does the Orlando VA have a loading dock available for receiving, or will a delivery truck with a lift-gate be required? A12. Delivery will be at a loading dock Q13. Are there any doorway width or elevator size restrictions along the delivery path from the loading dock to the final installation room? A13. No Q14. What are the Government's warranty requirements (e.g., 1-year parts and labor)? A14. 1 year
From Solicitation posted on Mar 11, 2026Notice history
3-
-
Solicitation Posted Feb 26, 2026View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Set-Aside: Service-Disabled Veteran-Owned Small Business Set Aside → None
Details
Award Information
Contacts
Contract Specialist