635 Condensate Return Pump Replacement 36C25925Q0399
Summary
AI-generated · Aug 23, 2025Replace the condensate return skid/pump (identified as the Skidmore pump) in Building 1 sub-basement, including its connection to the condensate return lines. The contractor must verify and validate all information in the statement of work, fully evaluate the condition of existing structures, and confirm the current site conditions before proceeding.
A mandatory site visit is required, with site visit documents issued and the schedule/location to be provided. Amendments clarify the set-aside type and extend the proposal due date.
This is a Solicitation amendment posted on 06/17/2025. This is amendment is post answered questions and extension of the proposal due date This is a Solicitation amendment posted on 06/10/2025. This is amendment is post Site Visit documents and extension of the proposal due date. This is a Solicitation amendment posted on 06/09/2025. This is amendment is to clarify set-aside type and schedule site visit and location. This project is to Remove and Replace the condensate return Skid. Skidmore pump is in the building 1 Sub-basement. Which is connected to the condensate return lines. The contractor is fully responsible for verifying and validating all information contained within this statement of work. The contractor must fully evaluate the condition of the existing structures and verify the current condition of the project site.
From Combined Synopsis/Solicitation posted on Jun 17, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA