63100PR260007463 SCBA Bottles 63100PR260007463
Summary
AI-generated · Jan 17, 2026Replace 33 end-of-life SCBA cylinders with matching G1 low-profile fire responder packs to support the above TPOs in firefighting. The new cylinders must match the current cylinders in use and provide the required on-air rating and dove-tail configuration, as specified in SFLC Engineering Advisory 002-25, Maintenance Procedure Card R-Q-17849, and Naval Ships Technical Manual 077.
Supply 33 G1 low-profile cylinders with the dove-tail configuration, rated at 4,500 PSI. Freight is the contractor’s responsibility, with delivery to Training Center Yorktown (TCY) on an FOB Destination basis.
OBJECTIVE The main objective for this statement of work is to have the 33 cylinders that have reached the end-of-life service requirements replaced with matching configurations of the G1 fire responder packs. These cylinders are required to support the above TPO s in firefighting. These specifications match the current cylinders in use and will provide the needed on-air rating and dove tail configuration as specified per SFLC Engineering Advisory 002-25, Maintenance Procedure Card R-Q-17849, and Naval Ships Technical Manual 077, Personal Protective Equipment. 2.0 SPECIFIC REQUIREMENTS/TASKS 2.1 Contractor will supply thirty-three (33) G1 low profile cylinders with the dove tail configuration and rated at 4,500 PSI. 2.2 FOB Destination: Contractor will be responsible for freight transportation to TRAINING CENTER YORKTOWN (TCY).
From Solicitation posted on Jan 16, 2026Notice history
2-
-
Award Notice LATEST Posted Jan 26, 2026
Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| FIRE & SAFETY EQUIPMENT CO. INC. | TRSEM3JVAWN5 | 8B2U1 | Concord, VA |
Contacts
Agency
Place of Performance
USA