Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SDVOSBC Expired 1 notice 3 documents

6110--689-26-3-4807-0126: Replace Variable Frequency Drive Units (VA-26-00053945) 36C24126Q0551

Solicitation 36C24126Q0551 Copied Notice ID d9ccbd384e1543fda50bca2113b5eb9c Copied VETERANS AFFAIRS, DEPARTMENT OF — 241-NETWORK CONTRACT OFFICE 01 (36C241)
SAM.gov
Posted
Jun 16, 2026
Deadline
Jun 23, 2026
Set-aside
SDVOSBC
NAICS
238220
PSC
6110

Summary

AI-generated · Jun 17, 2026

Replace Variable Frequency Drive (VFD) units across multiple mechanical spaces under a professional services contract; this is not construction, so there is no site superintendent or construction-management requirement. Startup and verification must be performed by qualified personnel, with OSHA requirements met for the work area, and installation reports and equipment warranties must be provided. The contractor will physically connect to the building management system (BMS); however, programming setup and integration to the BMS are handled by the VA, with the contractor responsible for coordinating schedule and activities with VA.

ICRA requirements are location-specific, so there isn’t a single level that applies to all areas; the contractor must coordinate with the government before work begins in each area to determine applicable ICRA requirements. Temporary containment (e.g., plastic panels) may be considered but must be approved per location. Work is allowed during normal business hours with no forced off-hours shutdowns, and the contractor is responsible for any applicable taxes. Roles such as SSHO or QA/QC are not required for this professional services contract; start-up should be performed by personnel with the necessary equipment-specific qualifications.

Amendment No.: 0002 Solicitation No.: 36C24126Q0551 Date: June 16, 2026 Purpose of Amendment The purpose of this amendment is to provide responses to questions submitted regarding the solicitation. As a result of these questions and responses, the response due date will be extended to June 23, 2026 at 10am. Question: Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification. Question: If no to the question above, will the SSHO need to be full-time for this project? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification. Question: Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification. Question: If no to the question above, will the QA/QC need to be full time for this project? Answer: Personnel performing startup of equipment should be those with the qualifications necessary to the specific equipment. Please submit appropriate installation report(s) as required along with equipment warranties. Question: Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification. Question: Please confirm if tax should be included in our proposal? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification. Question: Advise what is the ICRA Level required for the areas of the VFDs. Answer: This question has been addressed previously. The contractor is responsible for determining any applicable tax obligations, incorporating into proposals as necessary. The VA cannot provide tax advice or make tax determinations on behalf of the contractor. Question: Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? Answer: The VFD's are in multiple mechanical spaces throughout the facility. There's no single ICRA level that applies to all locations. The Contractor shall coordinate with the government prior to commencing work in each area as the ICRA requirements will be determined based on the specific location, adjacent patient care activities, and scope of work. Question: Confirm project work hours. Can work be completed during normal work hours? Answer: The acceptability of temporary containment systems. Cannot be determined generically for this project. Requirements will vary based on specific work location activities and ICRA requirements. Question: Will shutdowns be required to be done during off hours or weekends? Answer: Normal business hours no off time schedule is required. Question: Description of Services line 4 states to coordinate with FMS for BMS controls connections to VFDs. Advise if BMS controls connections, programming setup, and integration to BMS are by the VA. Is the contractor to only coordinate schedule and activities? Answer: Connection is to be made by contractor. Programming setup, and integration to BMS are by the VA. The contractor to only coordinate schedule and activities with VA.

From Combined Synopsis/Solicitation posted on Jun 16, 2026

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Jun 16, 2026

Details

Solicitation number 36C24126Q0551
Notice ID d9ccbd384e1543fda50bca2113b5eb9c
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 6110
NAICS 238220
Place of performance West Haven, CT
Archive date Jul 08, 2026

Award Information

Awardees
0

Contacts

primary
Yolanda Rankin

Contract Specialist

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
241-NETWORK CONTRACT OFFICE 01 (36C241)

Place of Performance

VA Connecticut Healthcare System West Haven VA Medical Center
950 Campbell Avenue
West Haven, CT 06516

Dates

Posted Jun 16, 2026 1 month ago
Last Updated Aug 06, 2026 2 days ago
Due Jun 23, 2026 1 month ago