61--POWER SUPPLY SPE7LX26U0719
Summary
AI-generated · Oct 22, 2025Power supply (NSN 6130014759150) is being acquired via RFQ for 6 units, to be delivered within 171 days after award. The items will be shipped to multiple CONUS and OCONUS DLA depots through a consolidation/containerization process. This is a source-controlled drawing item with approved sources 06ES8 TAB401 and 15420 58LS1-005. Hard copies of the solicitation are not available, and all required drawings and military specifications are accessible electronically; quotes must be submitted electronically.
The contract may establish an automated Indefinite Delivery Contract with a one-year term or until the total orders reach $350,000, whichever comes first, with an estimated four orders per year and a guaranteed minimum quantity of 1. All responsible sources may submit a timely quote. Quotes must meet the drawing requirements and be submitted electronically.
Proposed procurement for NSN 6130014759150 POWER SUPPLY: Line 0001 Qty 6 UI EA Deliver To: By: 0171 DAYS ADO This Solicitation may result in an Automated IDC (Indefinite Delivery Contract). The term of the contract/order will be one year or until the aggregate total of orders placed against the contract/order reach 350000.00. The estimated number of orders per year is 4. The Guaranteed Minimum quantity will be 1. Items will be shipped to various CONUS and OCONUS (via consolidation and containerization point) DLA Depots. This is a source controlled drawing item. Approved sources are 06ES8 TAB401; 15420 58LS1-005. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. The items furnished must meet the requirements of the drawing cited in the solicitation. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
From Combined Synopsis/Solicitation posted on Oct 21, 2025Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Oct 21, 2025
Details
Award Information
Not yet awarded