61--POWER SUPPLY SPE7L725T6040
Summary
AI-generated · Sep 03, 2025Power supply required (NSN 6130-200-016218), quantity 1 each, to be delivered to W1A8 DLA Distribution. Delivery must be made within 154 days after award. The RFQ will be available via the link in the notice; hard copies and any drawings or specifications are not provided. Quotes must be submitted electronically.
Approved sources are 38370 832-01A/B/AY-DWG REV U; 38370 832-01B; 38370 832-01B-PL REV U. The solicitation is an RFQ; all responsible sources may submit a quote which, if timely received, will be considered, and quotes must be submitted electronically.
Proposed procurement for NSN 6130200016218 POWER SUPPLY: Line 0001 Qty 1 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0154 DAYS ADO Approved sources are 38370 832-01A/B/AY-DWG REV U; 38370 832-01B; 38370 832-01B-PL REV U. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
From Combined Synopsis/Solicitation posted on Sep 02, 2025Notice history
1Details
Award Information
Not yet awarded