61--Power Supply Assembly SPE7LX-26-R-0042
Summary
AI-generated · Feb 24, 2026Power Supply Assembly (1 NSN) will be procured under an Indefinite Quantity Contract with a base year plus four option years, not to exceed five years in total. Competition will be conducted using FAR Part 12 procedures for commercial products, and each NSN on the RFP will have contract minimum and maximum values established at the NSN level to determine if cost and pricing data are required (subject to applicable exceptions). The RFP will specify inspection at destination, along with technical and packaging requirements.
The award will consider a mix of price, past performance, delivery, and other factors described in Sections L and M; while price may be significant, final decisions will be based on a combination of factors. The solicitation covers a single NSN and will be posted on the DIBBS portal.
The Defense Loglstlcs Agency ( DLA) wlll issue a Request for Proposal on February 24 2026 at https://www.dibbs.bsm.dla.mll /. The proposed contract wlll be soliclited as 100% Small Business Set Aside. The NSNs listed on the Request For Proposal (RFP) will have a contract minimum and maximum set at the NSN level. This will be used to determine if cost and pricing data will be required with any proposals if none of the exceptions apply. An Indefinite Quantity Contract with one base year and four (4) possible option years is anticipated. The total duration, base period plus option years, shall not exceed 5 years. The solicitation is for 1 NSN and will be solicited using FAR Part 12 Acquisition of Commercial Products procedures. Inspection point of Destination will be noted in Section B as well as any other technical and packaging requirements. While price may be a significant factor in the evaluation of offers, the final decision will be based on a combination of price, past performance, delivery, and other factors listed in Sections L and M of the solictation.
From Combined Synopsis/Solicitation posted on Feb 23, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Feb 23, 2026
Details
Award Information
Not yet awarded
Contacts
Phone