Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 14 notices 1 document

61--CABLE ASSEMBLY,SPEC N0010425QFE38

Solicitation N0010425QFE38 Copied Notice ID 1c35770805184095babcb02a01cd488a Copied DEPT OF DEFENSE — NAVSUP WEAPON SYSTEMS SUPPORT MECH
SAM.gov
Posted
Jun 05, 2026
Deadline
Jul 06, 2026
Set-aside
None
NAICS
335311
PSC
6150

Summary

AI-generated · Aug 24, 2025

Supply 10 cable assemblies, 61--CABLE ASSEMBLY,SPEC, for a crucial shipboard system. Must be manufactured to Dry Deck Shelter DDSP requirements (S-5343934-2, part 1208208-0509) and use MIL-DTL-24231 in place of MIL-C-24231, with wiring/molding performed by an NAVSEA-approved vendor listed in ECDS. If a non-prime vendor is used, that vendor must be named on the Special Emphasis Certificate of Compliance. Each assembly must pass Navy Quality Conformance tests (per S-5343934-2 with required CSD031 modifications), undergo First Article testing, and show 100% inspection of required data. The material includes non-metallic components that must meet toxicity and flammability standards (SS800-AG-MAN-010/P-9290) and Mercury-free requirements, and must maintain traceability to the required objective quality evidence. A ISO 9001–based quality system (or MIL-I-45208 with ISO-17025 calibration as an acceptable alternate) must be in place, with government at-source quality assurance and comprehensive Certificate of Compliance data. Final delivery is spread over a 210-day period, with certification data due ahead of delivery and government review requirements specified; the contract also requires strict configuration control, waiver/ECP processes, and documentation tied to CDRLs and applicable quality standards.

In the latest notice, the submission deadline has been extended; all other technical, testing, and documentation requirements remain unchanged.

NSN 1H-6150-012714911-D4, TDP VER 006, QTY 10 EA, DELIVER TO N50286, PORTSMOUTH NAVAL SHIPYARD L1SS, KITTERY, ME 03904. The proposed acquisition is 100% set aside for small business concerns (see FAR clause 52.219-6, Notice of Total Small Business Set-Aside). The specific type of set-aside will be addressed in the solicitation through inclusion of one of the appropriate clauses listed here: FAR 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award FAR 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside FAR 52.219-29 Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business Concerns FAR 52.219-30 Notice of Set-Aside for Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program DFARS 252.226-7000 Notice of Historically Black College or University and Minority Institution Set-Aside Interested parties may obtain copies of Military and Federal Specifications and Standards, Qualified Products Lists (QPLs), Qualified Product Databases (QPDs), Military Handbooks, and other standardized documents from the DoD Single Stock Point (DODSSP) at Document Automation and Production Service (DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSIST Help Desk at 215-697-2667 or 215-697-2179(DSN: 442-2667), or mail their requestDLA Document Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094.

From Presolicitation posted on Jun 18, 2025

CONTACT INFORMATION|4|N743.43|WWJ|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (210 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=S-5343934-2 |53711| G|PS |D|0001 | G|49998|0006770 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0002 | G|49998|0065427 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0003 | G|49998|0066314 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0004 | G|49998|0067102 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0005 | G|49998|0067471 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0006 | G|49998|0067654 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0007 | G|49998|0067056 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0008 | G|49998|0065247 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0009 | G|49998|0066592 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0010 | G|49998|0065586 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0011 | G|49998|0065340 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0012 | G|49998|0069404 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0013 | G|49998|0066344 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0014 | G|49998|0065445 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0015 | G|49998|0071369 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0016 | G|49998|0067353 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0017 | G|49998|0067656 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0018 | G|49998|0071052 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0019 | G|49998|0068417 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0020 | G|49998|0067377 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0021 | G|49998|0068241 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0022 | G|49998|0068866 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0023 | G|49998|0068702 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0024 | G|49998|0068065 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0025 | G|49998|0067709 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0026 | G|49998|0066916 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0027 | G|49998|0066393 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0028 | G|49998|0066198 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0029 | G|49998|0068711 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0030 | G|49998|0089786 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0031 | G|49998|0029775 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0032 | G|49998|0030019 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0033 | G|49998|0084327 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0034 | G|49998|0085842 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0035 | G|49998|0084383 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0036 | G|49998|0044587 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0037 | G|49998|0101905 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0038 | G|49998|0033628 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0039 | G|49998|0091810 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0040 | G|49998|0074342 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0041 | G|49998|0086740 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0042 | G|49998|0074050 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0043 | G|49998|0109000 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0044 | G|49998|0078604 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0045 | G|49998|0085872 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0046 | G|49998|0081248 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0047 | G|49998|0090059 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0048 | G|49998|0081329 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 ;This Cable Assembly must be manufactured in accordance with Dry Deck Shelter (DDS) procurement specification S-5343934-2, specification sheet S-5343934-2/6, part number 1208208-0509, except as amplified or modified herein.; 3.2 ;MIL-DTL-24231 and the required slash sheets must be used in lieu of MIL-C-24231.; 3.3 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.3.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.4 Each cable assembly must be subjected to the Quality Conformance tests of specification S-5343934-2 Tables 2 and 3; except that Table 3 of S-5343934-2 must be modified by CSD031 of the Contract Support Library. 1. Examination of Product IAW paragraph 3.4 and tested to paragraph 4.6 2. Dielectric Withstanding Voltage IAW paragraph 3.6.1 and tested to paragraph 4.7.1 3. Continuity IAW paragraph 3.6.2 and tested to paragraph 4.7.2 4. Insulation Resistance IAW paragraph 3.6.3 and tested to paragraph 4.7.3 5. Hydrostatic Pressure IAW paragraph 3.6.4 and tested to paragraph 4.7.4 6. Post-Test Examination of Product IAW paragraph 4.6.1 3.4.1 Each conformance test must be listed separately on the Navy Special Emphasis Program (NSEP) Certificate of Compliance (C of C) as being performed and found acceptable. 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD031; in ECDS at https://register.nslc.navy.mil/ 3.7 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.10.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.17 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.17.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.18 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.18.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.18.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.18.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.19 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.19.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.20 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one Cable Assembly, consisting of one-three contact plug assembly with 90 degree backshell, one-seven contact straight plug assembly and one conduit 30 inches long; unit(s) in accordance with requirements ;of S-5343934-2 Paragraph 4.4; . 3.21 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. Note: These requirements do not apply to tack/spot welds. 3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.21.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.21.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.21.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.21.6 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.21.7 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.22 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.23 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.23.1 Direct reading of O-ring surface diameters with specified standard. 3.24 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contractor's authorized personnel must sign at the completion of all required testing indicating acceptance of all recorded data and certifying the satisfactory completion of the required test(s).NOTE: The Test Acceptance Signature must be annotated as attesting that the person who actually performed or witnessed the test is verifying that all associated test parameters were met. 4. The contractor's internal test documentation must note acceptability by the initials and date of the person performing the test and must be maintained by the contractor in accordance with contract requirements. 5. Identification for each cable or lot of cables tested together and identified with component serial number to the objective quality evidence (test records held at manufactures facility...

From Solicitation posted on Jun 18, 2025

NSN 1H-6150-012714911-D4, TDP VER 006, QTY 10 EA, DELIVER TO N50286, PORTSMOUTH NAVAL SHIPYARD L1SS, KITTERY, ME 03904. The proposed acquisition is 100% set aside for small business concerns (see FAR clause 52.219-6, Notice of Total Small Business Set-Aside). The specific type of set-aside will be addressed in the solicitation through inclusion of one of the appropriate clauses listed here: FAR 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award FAR 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside FAR 52.219-29 Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business Concerns FAR 52.219-30 Notice of Set-Aside for Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program DFARS 252.226-7000 Notice of Historically Black College or University and Minority Institution Set-Aside Interested parties may obtain copies of Military and Federal Specifications and Standards, Qualified Products Lists (QPLs), Qualified Product Databases (QPDs), Military Handbooks, and other standardized documents from the DoD Single Stock Point (DODSSP) at Document Automation and Production Service (DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSIST Help Desk at 215-697-2667 or 215-697-2179(DSN: 442-2667), or mail their requestDLA Document Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094.

From Presolicitation posted on Aug 04, 2025

CONTACT INFORMATION|4|N743.43|WWJ|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The hour and date specified for receipt of offers has been extended to 4:30PM EST on 21 August 2025. 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (210 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=S-5343934-2 |53711| G|PS |D|0001 | G|49998|0006770 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0002 | G|49998|0065427 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0003 | G|49998|0066314 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0004 | G|49998|0067102 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0005 | G|49998|0067471 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0006 | G|49998|0067654 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0007 | G|49998|0067056 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0008 | G|49998|0065247 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0009 | G|49998|0066592 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0010 | G|49998|0065586 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0011 | G|49998|0065340 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0012 | G|49998|0069404 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0013 | G|49998|0066344 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0014 | G|49998|0065445 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0015 | G|49998|0071369 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0016 | G|49998|0067353 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0017 | G|49998|0067656 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0018 | G|49998|0071052 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0019 | G|49998|0068417 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0020 | G|49998|0067377 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0021 | G|49998|0068241 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0022 | G|49998|0068866 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0023 | G|49998|0068702 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0024 | G|49998|0068065 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0025 | G|49998|0067709 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0026 | G|49998|0066916 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0027 | G|49998|0066393 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0028 | G|49998|0066198 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0029 | G|49998|0068711 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0030 | G|49998|0089786 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0031 | G|49998|0029775 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0032 | G|49998|0030019 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0033 | G|49998|0084327 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0034 | G|49998|0085842 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0035 | G|49998|0084383 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0036 | G|49998|0044587 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0037 | G|49998|0101905 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0038 | G|49998|0033628 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0039 | G|49998|0091810 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0040 | G|49998|0074342 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0041 | G|49998|0086740 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0042 | G|49998|0074050 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0043 | G|49998|0109000 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0044 | G|49998|0078604 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0045 | G|49998|0085872 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0046 | G|49998|0081248 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0047 | G|49998|0090059 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0048 | G|49998|0081329 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 ;This Cable Assembly must be manufactured in accordance with Dry Deck Shelter (DDS) procurement specification S-5343934-2, specification sheet S-5343934-2/6, part number 1208208-0509, except as amplified or modified herein.; 3.2 ;MIL-DTL-24231 and the required slash sheets must be used in lieu of MIL-C-24231.; 3.3 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.3.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.4 Each cable assembly must be subjected to the Quality Conformance tests of specification S-5343934-2 Tables 2 and 3; except that Table 3 of S-5343934-2 must be modified by CSD031 of the Contract Support Library. 1. Examination of Product IAW paragraph 3.4 and tested to paragraph 4.6 2. Dielectric Withstanding Voltage IAW paragraph 3.6.1 and tested to paragraph 4.7.1 3. Continuity IAW paragraph 3.6.2 and tested to paragraph 4.7.2 4. Insulation Resistance IAW paragraph 3.6.3 and tested to paragraph 4.7.3 5. Hydrostatic Pressure IAW paragraph 3.6.4 and tested to paragraph 4.7.4 6. Post-Test Examination of Product IAW paragraph 4.6.1 3.4.1 Each conformance test must be listed separately on the Navy Special Emphasis Program (NSEP) Certificate of Compliance (C of C) as being performed and found acceptable. 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD031; in ECDS at https://register.nslc.navy.mil/ 3.7 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.10.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.17 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.17.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.18 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.18.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.18.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.18.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.19 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.19.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.20 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one Cable Assembly, consisting of one-three contact plug assembly with 90 degree backshell, one-seven contact straight plug assembly and one conduit 30 inches long; unit(s) in accordance with requirements ;of S-5343934-2 Paragraph 4.4; . 3.21 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. Note: These requirements do not apply to tack/spot welds. 3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.21.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.21.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.21.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.21.6 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.21.7 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.22 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.23 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.23.1 Direct reading of O-ring surface diameters with specified standard. 3.24 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contractor's authorized personnel must sign at the completion of all required testing indicating acceptance of all recorded data and certifying the satisfactory completion of the required test(s).NOTE: The Test Acceptance Signature must be annotated as attesting that the person who actually performed or witnessed the test is verifying that all associated test parameters were met. 4. The contractor's internal test documentation must note acceptability by the initials and date of the person performing the test and must be maintained by the contractor in accordance with contract requirements. 5. Identification for each cable or lot of cables tested together and identified with ...

From Solicitation posted on Aug 04, 2025

CONTACT INFORMATION|4|N743.43|WWJ|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The hour and date specified for receipt of offers has been extended to 4:30PM EST on 28 November 2025. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 21 August 2025. 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (210 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=S-5343934-2 |53711| G|PS |D|0001 | G|49998|0006770 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0002 | G|49998|0065427 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0003 | G|49998|0066314 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0004 | G|49998|0067102 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0005 | G|49998|0067471 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0006 | G|49998|0067654 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0007 | G|49998|0067056 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0008 | G|49998|0065247 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0009 | G|49998|0066592 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0010 | G|49998|0065586 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0011 | G|49998|0065340 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0012 | G|49998|0069404 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0013 | G|49998|0066344 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0014 | G|49998|0065445 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0015 | G|49998|0071369 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0016 | G|49998|0067353 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0017 | G|49998|0067656 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0018 | G|49998|0071052 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0019 | G|49998|0068417 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0020 | G|49998|0067377 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0021 | G|49998|0068241 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0022 | G|49998|0068866 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0023 | G|49998|0068702 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0024 | G|49998|0068065 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0025 | G|49998|0067709 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0026 | G|49998|0066916 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0027 | G|49998|0066393 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0028 | G|49998|0066198 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0029 | G|49998|0068711 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0030 | G|49998|0089786 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0031 | G|49998|0029775 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0032 | G|49998|0030019 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0033 | G|49998|0084327 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0034 | G|49998|0085842 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0035 | G|49998|0084383 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0036 | G|49998|0044587 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0037 | G|49998|0101905 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0038 | G|49998|0033628 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0039 | G|49998|0091810 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0040 | G|49998|0074342 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0041 | G|49998|0086740 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0042 | G|49998|0074050 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0043 | G|49998|0109000 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0044 | G|49998|0078604 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0045 | G|49998|0085872 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0046 | G|49998|0081248 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0047 | G|49998|0090059 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0048 | G|49998|0081329 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 ;This Cable Assembly must be manufactured in accordance with Dry Deck Shelter (DDS) procurement specification S-5343934-2, specification sheet S-5343934-2/6, part number 1208208-0509, except as amplified or modified herein.; 3.2 ;MIL-DTL-24231 and the required slash sheets must be used in lieu of MIL-C-24231.; 3.3 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.3.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.4 Each cable assembly must be subjected to the Quality Conformance tests of specification S-5343934-2 Tables 2 and 3; except that Table 3 of S-5343934-2 must be modified by CSD031 of the Contract Support Library. 1. Examination of Product IAW paragraph 3.4 and tested to paragraph 4.6 2. Dielectric Withstanding Voltage IAW paragraph 3.6.1 and tested to paragraph 4.7.1 3. Continuity IAW paragraph 3.6.2 and tested to paragraph 4.7.2 4. Insulation Resistance IAW paragraph 3.6.3 and tested to paragraph 4.7.3 5. Hydrostatic Pressure IAW paragraph 3.6.4 and tested to paragraph 4.7.4 6. Post-Test Examination of Product IAW paragraph 4.6.1 3.4.1 Each conformance test must be listed separately on the Navy Special Emphasis Program (NSEP) Certificate of Compliance (C of C) as being performed and found acceptable. 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD031; in ECDS at https://register.nslc.navy.mil/ 3.7 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.10.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.17 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.17.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.18 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.18.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.18.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.18.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.19 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.19.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.20 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one Cable Assembly, consisting of one-three contact plug assembly with 90 degree backshell, one-seven contact straight plug assembly and one conduit 30 inches long; unit(s) in accordance with requirements ;of S-5343934-2 Paragraph 4.4; . 3.21 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. Note: These requirements do not apply to tack/spot welds. 3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.21.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.21.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.21.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.21.6 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.21.7 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.22 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.23 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.23.1 Direct reading of O-ring surface diameters with specified standard. 3.24 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contractor's authorized personnel must sign at the completion of all required testing indicating acceptance of all recorded data and certifying the satisfactory completion of the required test(s).NOTE: The Test Acceptance Signature must be annotated as attesting that the person who actually performed or witnessed the test is verifying that all associated test parameters were met. 4. The contractor's internal test documentation must note acceptability by the initials and date of the person performing the test and must be maintained by the contractor in accordance with contra...

From Solicitation posted on Aug 27, 2025

CONTACT INFORMATION|4|N743.43|WWJ|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The hour and date specified for receipt of offers has been extended to 4:30PM EST on 27 March 2026. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 28 November 2025. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 21 August 2025. 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (210 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=S-5343934-2 |53711| G|PS |D|0001 | G|49998|0006770 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0002 | G|49998|0065427 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0003 | G|49998|0066314 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0004 | G|49998|0067102 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0005 | G|49998|0067471 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0006 | G|49998|0067654 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0007 | G|49998|0067056 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0008 | G|49998|0065247 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0009 | G|49998|0066592 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0010 | G|49998|0065586 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0011 | G|49998|0065340 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0012 | G|49998|0069404 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0013 | G|49998|0066344 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0014 | G|49998|0065445 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0015 | G|49998|0071369 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0016 | G|49998|0067353 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0017 | G|49998|0067656 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0018 | G|49998|0071052 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0019 | G|49998|0068417 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0020 | G|49998|0067377 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0021 | G|49998|0068241 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0022 | G|49998|0068866 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0023 | G|49998|0068702 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0024 | G|49998|0068065 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0025 | G|49998|0067709 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0026 | G|49998|0066916 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0027 | G|49998|0066393 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0028 | G|49998|0066198 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0029 | G|49998|0068711 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0030 | G|49998|0089786 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0031 | G|49998|0029775 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0032 | G|49998|0030019 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0033 | G|49998|0084327 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0034 | G|49998|0085842 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0035 | G|49998|0084383 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0036 | G|49998|0044587 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0037 | G|49998|0101905 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0038 | G|49998|0033628 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0039 | G|49998|0091810 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0040 | G|49998|0074342 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0041 | G|49998|0086740 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0042 | G|49998|0074050 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0043 | G|49998|0109000 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0044 | G|49998|0078604 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0045 | G|49998|0085872 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0046 | G|49998|0081248 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0047 | G|49998|0090059 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0048 | G|49998|0081329 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 ;This Cable Assembly must be manufactured in accordance with Dry Deck Shelter (DDS) procurement specification S-5343934-2, specification sheet S-5343934-2/6, part number 1208208-0509, except as amplified or modified herein.; 3.2 ;MIL-DTL-24231 and the required slash sheets must be used in lieu of MIL-C-24231.; 3.3 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.3.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.4 Each cable assembly must be subjected to the Quality Conformance tests of specification S-5343934-2 Tables 2 and 3; except that Table 3 of S-5343934-2 must be modified by CSD031 of the Contract Support Library. 1. Examination of Product IAW paragraph 3.4 and tested to paragraph 4.6 2. Dielectric Withstanding Voltage IAW paragraph 3.6.1 and tested to paragraph 4.7.1 3. Continuity IAW paragraph 3.6.2 and tested to paragraph 4.7.2 4. Insulation Resistance IAW paragraph 3.6.3 and tested to paragraph 4.7.3 5. Hydrostatic Pressure IAW paragraph 3.6.4 and tested to paragraph 4.7.4 6. Post-Test Examination of Product IAW paragraph 4.6.1 3.4.1 Each conformance test must be listed separately on the Navy Special Emphasis Program (NSEP) Certificate of Compliance (C of C) as being performed and found acceptable. 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD031; in ECDS at https://register.nslc.navy.mil/ 3.7 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.10.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.17 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.17.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.18 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.18.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.18.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.18.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.19 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.19.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.20 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one Cable Assembly, consisting of one-three contact plug assembly with 90 degree backshell, one-seven contact straight plug assembly and one conduit 30 inches long; unit(s) in accordance with requirements ;of S-5343934-2 Paragraph 4.4; . 3.21 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. Note: These requirements do not apply to tack/spot welds. 3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.21.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.21.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.21.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.21.6 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.21.7 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.22 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.23 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.23.1 Direct reading of O-ring surface diameters with specified standard. 3.24 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contractor's authorized personnel must sign at the completion of all required testing indicating acceptance of all recorded data and certifying the satisfactory completion of the required test(s).NOTE: The Test Acceptance Signature must be annotated as attesting that the person who actually performed or witnessed the test is verifying that all associated test parameters were met. 4. The contractor's internal test documentation must note acceptability by the initials and date ...

From Solicitation posted on Sep 05, 2025

CONTACT INFORMATION|4|N743.43|WWJ|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The hour and date specified for receipt of offers has been extended to 4:30PM EST on 27 March 2026. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 28 November 2025. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 21 August 2025. 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (210 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=S-5343934-2 |53711| G|PS |D|0001 | G|49998|0006770 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0002 | G|49998|0065427 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0003 | G|49998|0066314 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0004 | G|49998|0067102 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0005 | G|49998|0067471 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0006 | G|49998|0067654 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0007 | G|49998|0067056 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0008 | G|49998|0065247 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0009 | G|49998|0066592 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0010 | G|49998|0065586 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0011 | G|49998|0065340 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0012 | G|49998|0069404 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0013 | G|49998|0066344 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0014 | G|49998|0065445 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0015 | G|49998|0071369 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0016 | G|49998|0067353 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0017 | G|49998|0067656 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0018 | G|49998|0071052 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0019 | G|49998|0068417 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0020 | G|49998|0067377 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0021 | G|49998|0068241 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0022 | G|49998|0068866 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0023 | G|49998|0068702 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0024 | G|49998|0068065 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0025 | G|49998|0067709 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0026 | G|49998|0066916 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0027 | G|49998|0066393 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0028 | G|49998|0066198 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0029 | G|49998|0068711 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0030 | G|49998|0089786 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0031 | G|49998|0029775 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0032 | G|49998|0030019 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0033 | G|49998|0084327 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0034 | G|49998|0085842 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0035 | G|49998|0084383 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0036 | G|49998|0044587 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0037 | G|49998|0101905 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0038 | G|49998|0033628 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0039 | G|49998|0091810 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0040 | G|49998|0074342 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0041 | G|49998|0086740 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0042 | G|49998|0074050 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0043 | G|49998|0109000 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0044 | G|49998|0078604 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0045 | G|49998|0085872 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0046 | G|49998|0081248 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0047 | G|49998|0090059 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0048 | G|49998|0081329 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 ;This Cable Assembly must be manufactured in accordance with Dry Deck Shelter (DDS) procurement specification S-5343934-2, specification sheet S-5343934-2/6, part number 1208208-0509, except as amplified or modified herein.; 3.2 ;MIL-DTL-24231 and the required slash sheets must be used in lieu of MIL-C-24231.; 3.3 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.3.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.4 Each cable assembly must be subjected to the Quality Conformance tests of specification S-5343934-2 Tables 2 and 3; except that Table 3 of S-5343934-2 must be modified by CSD031 of the Contract Support Library. 1. Examination of Product IAW paragraph 3.4 and tested to paragraph 4.6 2. Dielectric Withstanding Voltage IAW paragraph 3.6.1 and tested to paragraph 4.7.1 3. Continuity IAW paragraph 3.6.2 and tested to paragraph 4.7.2 4. Insulation Resistance IAW paragraph 3.6.3 and tested to paragraph 4.7.3 5. Hydrostatic Pressure IAW paragraph 3.6.4 and tested to paragraph 4.7.4 6. Post-Test Examination of Product IAW paragraph 4.6.1 3.4.1 Each conformance test must be listed separately on the Navy Special Emphasis Program (NSEP) Certificate of Compliance (C of C) as being performed and found acceptable. 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD031; in ECDS at https://register.nslc.navy.mil/ 3.7 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.10.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.17 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.17.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.18 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.18.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.18.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.18.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.19 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.19.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.20 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one Cable Assembly, consisting of one-three contact plug assembly with 90 degree backshell, one-seven contact straight plug assembly and one conduit 30 inches long; unit(s) in accordance with requirements ;of S-5343934-2 Paragraph 4.4; . 3.21 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. Note: These requirements do not apply to tack/spot welds. 3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.21.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.21.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.21.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.21.6 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.21.7 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.22 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.23 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.23.1 Direct reading of O-ring surface diameters with specified standard. 3.24 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contractor's authorized personnel must sign at the completion of all required testing indicating acceptance of all recorded data and certifying the satisfactory completion of the required test(s).NOTE: The Test Acceptance Signature must be annotated as attesting that the person who actually performed or witnessed the test is verifying that all associated test parameters were met. 4. The contractor's internal test documentation must note acceptability by the initials and date ...

From Solicitation posted on Sep 22, 2025

NSN 1H-6150-012714911-D4, TDP VER 006, QTY 10 EA, DELIVER TO N50286, PORTSMOUTH NAVAL SHIPYARD L1SS, KITTERY, ME 03904. The proposed acquisition is 100% set aside for small business concerns (see FAR clause 52.219-6, Notice of Total Small Business Set-Aside). The specific type of set-aside will be addressed in the solicitation through inclusion of one of the appropriate clauses listed here: FAR 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award FAR 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside FAR 52.219-29 Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business Concerns FAR 52.219-30 Notice of Set-Aside for Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program DFARS 252.226-7000 Notice of Historically Black College or University and Minority Institution Set-Aside Interested parties may obtain copies of Military and Federal Specifications and Standards, Qualified Products Lists (QPLs), Qualified Product Databases (QPDs), Military Handbooks, and other standardized documents from the DoD Single Stock Point (DODSSP) at Document Automation and Production Service (DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSIST Help Desk at 215-697-2667 or 215-697-2179(DSN: 442-2667), or mail their requestDLA Document Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094.

From Presolicitation posted on Sep 23, 2025

CONTACT INFORMATION|4|N743.43|WWJ|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Updated the solicitation closing date. \ The hour and date specified for receipt of offers has been extended to 4:30PM EST on 27 March 2026. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 28 November 2025. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 21 August 2025. 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (210 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=S-5343934-2 |53711| G|PS |D|0001 | G|49998|0006770 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0002 | G|49998|0065427 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0003 | G|49998|0066314 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0004 | G|49998|0067102 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0005 | G|49998|0067471 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0006 | G|49998|0067654 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0007 | G|49998|0067056 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0008 | G|49998|0065247 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0009 | G|49998|0066592 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0010 | G|49998|0065586 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0011 | G|49998|0065340 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0012 | G|49998|0069404 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0013 | G|49998|0066344 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0014 | G|49998|0065445 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0015 | G|49998|0071369 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0016 | G|49998|0067353 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0017 | G|49998|0067656 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0018 | G|49998|0071052 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0019 | G|49998|0068417 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0020 | G|49998|0067377 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0021 | G|49998|0068241 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0022 | G|49998|0068866 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0023 | G|49998|0068702 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0024 | G|49998|0068065 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0025 | G|49998|0067709 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0026 | G|49998|0066916 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0027 | G|49998|0066393 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0028 | G|49998|0066198 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0029 | G|49998|0068711 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0030 | G|49998|0089786 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0031 | G|49998|0029775 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0032 | G|49998|0030019 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0033 | G|49998|0084327 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0034 | G|49998|0085842 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0035 | G|49998|0084383 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0036 | G|49998|0044587 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0037 | G|49998|0101905 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0038 | G|49998|0033628 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0039 | G|49998|0091810 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0040 | G|49998|0074342 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0041 | G|49998|0086740 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0042 | G|49998|0074050 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0043 | G|49998|0109000 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0044 | G|49998|0078604 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0045 | G|49998|0085872 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0046 | G|49998|0081248 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0047 | G|49998|0090059 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0048 | G|49998|0081329 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 ;This Cable Assembly must be manufactured in accordance with Dry Deck Shelter (DDS) procurement specification S-5343934-2, specification sheet S-5343934-2/6, part number 1208208-0509, except as amplified or modified herein.; 3.2 ;MIL-DTL-24231 and the required slash sheets must be used in lieu of MIL-C-24231.; 3.3 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.3.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.4 Each cable assembly must be subjected to the Quality Conformance tests of specification S-5343934-2 Tables 2 and 3; except that Table 3 of S-5343934-2 must be modified by CSD031 of the Contract Support Library. 1. Examination of Product IAW paragraph 3.4 and tested to paragraph 4.6 2. Dielectric Withstanding Voltage IAW paragraph 3.6.1 and tested to paragraph 4.7.1 3. Continuity IAW paragraph 3.6.2 and tested to paragraph 4.7.2 4. Insulation Resistance IAW paragraph 3.6.3 and tested to paragraph 4.7.3 5. Hydrostatic Pressure IAW paragraph 3.6.4 and tested to paragraph 4.7.4 6. Post-Test Examination of Product IAW paragraph 4.6.1 3.4.1 Each conformance test must be listed separately on the Navy Special Emphasis Program (NSEP) Certificate of Compliance (C of C) as being performed and found acceptable. 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD031; in ECDS at https://register.nslc.navy.mil/ 3.7 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.10.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.17 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.17.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.18 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.18.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.18.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.18.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.19 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.19.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.20 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one Cable Assembly, consisting of one-three contact plug assembly with 90 degree backshell, one-seven contact straight plug assembly and one conduit 30 inches long; unit(s) in accordance with requirements ;of S-5343934-2 Paragraph 4.4; . 3.21 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. Note: These requirements do not apply to tack/spot welds. 3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.21.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.21.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.21.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.21.6 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.21.7 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.22 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.23 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.23.1 Direct reading of O-ring surface diameters with specified standard. 3.24 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contractor's authorized personnel must sign at the completion of all required testing indicating acceptance of all recorded data and certifying the satisfactory completion of the required test(s).NOTE: The Test Acceptance Signature must be annotated as attesting that the person who actually performed or witnessed the test is verifying that all associated test parameters were met. 4. The contractor's internal test documentation must not...

From Solicitation posted on Sep 23, 2025

NSN 1H-6150-012714911-D4, TDP VER 006, QTY 10 EA, DELIVER TO N50286, PORTSMOUTH NAVAL SHIPYARD L1SS, KITTERY, ME 03904. The proposed acquisition is 100% set aside for small business concerns (see FAR clause 52.219-6, Notice of Total Small Business Set-Aside). The specific type of set-aside will be addressed in the solicitation through inclusion of one of the appropriate clauses listed here: FAR 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award FAR 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside FAR 52.219-29 Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business Concerns FAR 52.219-30 Notice of Set-Aside for Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program DFARS 252.226-7000 Notice of Historically Black College or University and Minority Institution Set-Aside Interested parties may obtain copies of Military and Federal Specifications and Standards, Qualified Products Lists (QPLs), Qualified Product Databases (QPDs), Military Handbooks, and other standardized documents from the DoD Single Stock Point (DODSSP) at Document Automation and Production Service (DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSIST Help Desk at 215-697-2667 or 215-697-2179(DSN: 442-2667), or mail their requestDLA Document Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094.

From Presolicitation posted on Nov 25, 2025

CONTACT INFORMATION|4|N743.43|WWJ|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Qty decrease. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 22 January 2026. \ The qty has been updated. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 10 Novemeber 2025. \ Updated the solicitation closing date. \ The hour and date specified for receipt of offers has been extended to 4:30PM EST on 27 March 2026. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 28 November 2025. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 21 August 2025. 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (210 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=S-5343934-2 |53711| G|PS |D|0001 | G|49998|0006770 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0002 | G|49998|0065427 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0003 | G|49998|0066314 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0004 | G|49998|0067102 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0005 | G|49998|0067471 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0006 | G|49998|0067654 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0007 | G|49998|0067056 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0008 | G|49998|0065247 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0009 | G|49998|0066592 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0010 | G|49998|0065586 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0011 | G|49998|0065340 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0012 | G|49998|0069404 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0013 | G|49998|0066344 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0014 | G|49998|0065445 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0015 | G|49998|0071369 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0016 | G|49998|0067353 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0017 | G|49998|0067656 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0018 | G|49998|0071052 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0019 | G|49998|0068417 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0020 | G|49998|0067377 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0021 | G|49998|0068241 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0022 | G|49998|0068866 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0023 | G|49998|0068702 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0024 | G|49998|0068065 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0025 | G|49998|0067709 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0026 | G|49998|0066916 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0027 | G|49998|0066393 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0028 | G|49998|0066198 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0029 | G|49998|0068711 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0030 | G|49998|0089786 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0031 | G|49998|0029775 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0032 | G|49998|0030019 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0033 | G|49998|0084327 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0034 | G|49998|0085842 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0035 | G|49998|0084383 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0036 | G|49998|0044587 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0037 | G|49998|0101905 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0038 | G|49998|0033628 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0039 | G|49998|0091810 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0040 | G|49998|0074342 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0041 | G|49998|0086740 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0042 | G|49998|0074050 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0043 | G|49998|0109000 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0044 | G|49998|0078604 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0045 | G|49998|0085872 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0046 | G|49998|0081248 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0047 | G|49998|0090059 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0048 | G|49998|0081329 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 ;This Cable Assembly must be manufactured in accordance with Dry Deck Shelter (DDS) procurement specification S-5343934-2, specification sheet S-5343934-2/6, part number 1208208-0509, except as amplified or modified herein.; 3.2 ;MIL-DTL-24231 and the required slash sheets must be used in lieu of MIL-C-24231.; 3.3 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.3.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.4 Each cable assembly must be subjected to the Quality Conformance tests of specification S-5343934-2 Tables 2 and 3; except that Table 3 of S-5343934-2 must be modified by CSD031 of the Contract Support Library. 1. Examination of Product IAW paragraph 3.4 and tested to paragraph 4.6 2. Dielectric Withstanding Voltage IAW paragraph 3.6.1 and tested to paragraph 4.7.1 3. Continuity IAW paragraph 3.6.2 and tested to paragraph 4.7.2 4. Insulation Resistance IAW paragraph 3.6.3 and tested to paragraph 4.7.3 5. Hydrostatic Pressure IAW paragraph 3.6.4 and tested to paragraph 4.7.4 6. Post-Test Examination of Product IAW paragraph 4.6.1 3.4.1 Each conformance test must be listed separately on the Navy Special Emphasis Program (NSEP) Certificate of Compliance (C of C) as being performed and found acceptable. 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD031; in ECDS at https://register.nslc.navy.mil/ 3.7 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.10.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.17 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.17.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.18 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.18.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.18.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.18.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.19 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.19.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.20 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one Cable Assembly, consisting of one-three contact plug assembly with 90 degree backshell, one-seven contact straight plug assembly and one conduit 30 inches long; unit(s) in accordance with requirements ;of S-5343934-2 Paragraph 4.4; . 3.21 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. Note: These requirements do not apply to tack/spot welds. 3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.21.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.21.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.21.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.21.6 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.21.7 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.22 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.23 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.23.1 Direct reading of O-ring surface diameters with specified standard. 3.24 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contractor's authorized personnel must sign at the completion of all required testing indicating acceptance of all recorded data and certifying the satisfactory completion of the required t...

From Solicitation posted on Nov 25, 2025

NSN 1H-6150-012714911-D4, TDP VER 006, QTY 10 EA, DELIVER TO N50286, PORTSMOUTH NAVAL SHIPYARD L1SS, KITTERY, ME 03904. The proposed acquisition is 100% set aside for small business concerns (see FAR clause 52.219-6, Notice of Total Small Business Set-Aside). The specific type of set-aside will be addressed in the solicitation through inclusion of one of the appropriate clauses listed here: FAR 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award FAR 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside FAR 52.219-29 Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business Concerns FAR 52.219-30 Notice of Set-Aside for Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program DFARS 252.226-7000 Notice of Historically Black College or University and Minority Institution Set-Aside Interested parties may obtain copies of Military and Federal Specifications and Standards, Qualified Products Lists (QPLs), Qualified Product Databases (QPDs), Military Handbooks, and other standardized documents from the DoD Single Stock Point (DODSSP) at Document Automation and Production Service (DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSIST Help Desk at 215-697-2667 or 215-697-2179(DSN: 442-2667), or mail their requestDLA Document Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094.

From Presolicitation posted on Mar 10, 2026

CONTACT INFORMATION|4|N743.43|WWJ|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Qty is updated. \ Qty decrease. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 22 January 2026. \ The qty has been updated. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 10 Novemeber 2025. \ Updated the solicitation closing date. \ The hour and date specified for receipt of offers has been extended to 4:30PM EST on 27 March 2026. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 28 November 2025. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 21 August 2025. 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (210 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=S-5343934-2 |53711| G|PS |D|0001 | G|49998|0006770 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0002 | G|49998|0065427 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0003 | G|49998|0066314 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0004 | G|49998|0067102 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0005 | G|49998|0067471 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0006 | G|49998|0067654 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0007 | G|49998|0067056 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0008 | G|49998|0065247 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0009 | G|49998|0066592 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0010 | G|49998|0065586 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0011 | G|49998|0065340 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0012 | G|49998|0069404 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0013 | G|49998|0066344 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0014 | G|49998|0065445 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0015 | G|49998|0071369 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0016 | G|49998|0067353 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0017 | G|49998|0067656 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0018 | G|49998|0071052 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0019 | G|49998|0068417 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0020 | G|49998|0067377 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0021 | G|49998|0068241 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0022 | G|49998|0068866 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0023 | G|49998|0068702 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0024 | G|49998|0068065 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0025 | G|49998|0067709 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0026 | G|49998|0066916 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0027 | G|49998|0066393 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0028 | G|49998|0066198 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0029 | G|49998|0068711 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0030 | G|49998|0089786 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0031 | G|49998|0029775 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0032 | G|49998|0030019 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0033 | G|49998|0084327 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0034 | G|49998|0085842 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0035 | G|49998|0084383 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0036 | G|49998|0044587 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0037 | G|49998|0101905 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0038 | G|49998|0033628 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0039 | G|49998|0091810 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0040 | G|49998|0074342 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0041 | G|49998|0086740 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0042 | G|49998|0074050 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0043 | G|49998|0109000 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0044 | G|49998|0078604 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0045 | G|49998|0085872 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0046 | G|49998|0081248 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0047 | G|49998|0090059 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0048 | G|49998|0081329 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 ;This Cable Assembly must be manufactured in accordance with Dry Deck Shelter (DDS) procurement specification S-5343934-2, specification sheet S-5343934-2/6, part number 1208208-0509, except as amplified or modified herein.; 3.2 ;MIL-DTL-24231 and the required slash sheets must be used in lieu of MIL-C-24231.; 3.3 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.3.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.4 Each cable assembly must be subjected to the Quality Conformance tests of specification S-5343934-2 Tables 2 and 3; except that Table 3 of S-5343934-2 must be modified by CSD031 of the Contract Support Library. 1. Examination of Product IAW paragraph 3.4 and tested to paragraph 4.6 2. Dielectric Withstanding Voltage IAW paragraph 3.6.1 and tested to paragraph 4.7.1 3. Continuity IAW paragraph 3.6.2 and tested to paragraph 4.7.2 4. Insulation Resistance IAW paragraph 3.6.3 and tested to paragraph 4.7.3 5. Hydrostatic Pressure IAW paragraph 3.6.4 and tested to paragraph 4.7.4 6. Post-Test Examination of Product IAW paragraph 4.6.1 3.4.1 Each conformance test must be listed separately on the Navy Special Emphasis Program (NSEP) Certificate of Compliance (C of C) as being performed and found acceptable. 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD031; in ECDS at https://register.nslc.navy.mil/ 3.7 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.10.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.17 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.17.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.18 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.18.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.18.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.18.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.19 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.19.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.20 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one Cable Assembly, consisting of one-three contact plug assembly with 90 degree backshell, one-seven contact straight plug assembly and one conduit 30 inches long; unit(s) in accordance with requirements ;of S-5343934-2 Paragraph 4.4; . 3.21 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. Note: These requirements do not apply to tack/spot welds. 3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.21.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.21.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.21.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.21.6 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.21.7 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.22 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.23 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.23.1 Direct reading of O-ring surface diameters with specified standard. 3.24 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contractor's authorized personnel must sign at the completion of all required testing indicating acceptance of all recorded data and certifying the satisfactory completion...

From Solicitation posted on Mar 10, 2026

CONTACT INFORMATION|4|N743.43|WWJ|717-605-3992|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335311|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The qty was updated. \ The hour and date specified for receipt of offers has been extended to 4:30PM EST on 27 May 2026. Small Business set-aside is dissolved. \ Qty is updated. \ Qty decrease. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 22 January 2026. \ The qty has been updated. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 10 Novemeber 2025. \ Updated the solicitation closing date. \ The hour and date specified for receipt of offers has been extended to 4:30PM EST on 27 March 2026. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 28 November 2025. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 21 August 2025. 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (210 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=S-5343934-2 |53711| G|PS |D|0001 | G|49998|0006770 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0002 | G|49998|0065427 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0003 | G|49998|0066314 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0004 | G|49998|0067102 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0005 | G|49998|0067471 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0006 | G|49998|0067654 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0007 | G|49998|0067056 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0008 | G|49998|0065247 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0009 | G|49998|0066592 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0010 | G|49998|0065586 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0011 | G|49998|0065340 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0012 | G|49998|0069404 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0013 | G|49998|0066344 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0014 | G|49998|0065445 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0015 | G|49998|0071369 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0016 | G|49998|0067353 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0017 | G|49998|0067656 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0018 | G|49998|0071052 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0019 | G|49998|0068417 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0020 | G|49998|0067377 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0021 | G|49998|0068241 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0022 | G|49998|0068866 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0023 | G|49998|0068702 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0024 | G|49998|0068065 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0025 | G|49998|0067709 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0026 | G|49998|0066916 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0027 | G|49998|0066393 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0028 | G|49998|0066198 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0029 | G|49998|0068711 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0030 | G|49998|0089786 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0031 | G|49998|0029775 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0032 | G|49998|0030019 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0033 | G|49998|0084327 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0034 | G|49998|0085842 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0035 | G|49998|0084383 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0036 | G|49998|0044587 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0037 | G|49998|0101905 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0038 | G|49998|0033628 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0039 | G|49998|0091810 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0040 | G|49998|0074342 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0041 | G|49998|0086740 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0042 | G|49998|0074050 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0043 | G|49998|0109000 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0044 | G|49998|0078604 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0045 | G|49998|0085872 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0046 | G|49998|0081248 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0047 | G|49998|0090059 DRAWING DATA=S-5343934-2 |53711| G|PS |D|0048 | G|49998|0081329 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3. REQUIREMENTS 3.1 ;This Cable Assembly must be manufactured in accordance with Dry Deck Shelter (DDS) procurement specification S-5343934-2, specification sheet S-5343934-2/6, part number 1208208-0509, except as amplified or modified herein.; 3.2 ;MIL-DTL-24231 and the required slash sheets must be used in lieu of MIL-C-24231.; 3.3 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.3.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.4 Each cable assembly must be subjected to the Quality Conformance tests of specification S-5343934-2 Tables 2 and 3; except that Table 3 of S-5343934-2 must be modified by CSD031 of the Contract Support Library. 1. Examination of Product IAW paragraph 3.4 and tested to paragraph 4.6 2. Dielectric Withstanding Voltage IAW paragraph 3.6.1 and tested to paragraph 4.7.1 3. Continuity IAW paragraph 3.6.2 and tested to paragraph 4.7.2 4. Insulation Resistance IAW paragraph 3.6.3 and tested to paragraph 4.7.3 5. Hydrostatic Pressure IAW paragraph 3.6.4 and tested to paragraph 4.7.4 6. Post-Test Examination of Product IAW paragraph 4.6.1 3.4.1 Each conformance test must be listed separately on the Navy Special Emphasis Program (NSEP) Certificate of Compliance (C of C) as being performed and found acceptable. 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD031; in ECDS at https://register.nslc.navy.mil/ 3.7 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.10.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.17 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.17.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.18 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.18.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.18.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.18.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.19 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.19.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.20 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one Cable Assembly, consisting of one-three contact plug assembly with 90 degree backshell, one-seven contact straight plug assembly and one conduit 30 inches long; unit(s) in accordance with requirements ;of S-5343934-2 Paragraph 4.4; . 3.21 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. Note: These requirements do not apply to tack/spot welds. 3.21.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.21.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.21.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.21.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.21.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.21.6 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.21.7 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.22 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Component Serial Number 5. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 6. Cure date ("N/A" when Not Applicable). 7. Manufacturer's compound number ("N/A" when Not Applicable). 8. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 9. A statement listing each contractually invoked Hull Mechanical and Electrical (HM&E) testing by name, and that it was performed satisfactorily. ("N/A" when Not Applicable) 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specifications and drawings. 11. Contractor's or authorized personnel's signature and printed name. 3.23 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate of Compliance must also include the information below: 3.23.1 Direct reading of O-ring surface diameters with specified standard. 3.24 For all electrical components, the following applies: 1. First Article Inspection: As specified elsewhere in Paragraph 3 per applicable manuals, instruction, drawings, or specifications. Cables that have been repaired and returned to service will require First Article Inspection to be performed at the time of rectification for use. 2. For C of C involving more than one cable assembly, the date of testing must be marked as the day in which the final cable assembly for the contract lot was tested. 3. Test Acceptance Signature: Contracto...

From Solicitation posted on Jun 05, 2026

Notice history

14
  1. Presolicitation Posted Jun 18, 2025 View
  2. Solicitation Posted Jun 18, 2025
    • Title: 61--CABLE ASSEMBLY,SPECCABLE ASSEMBLY,SPEC
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Set-Aside: Total Small Business Set-Aside (FAR 19.5)None
    • NAICS Codes: None335311
  3. Presolicitation Posted Aug 04, 2025
    • Title: CABLE ASSEMBLY,SPEC61--CABLE ASSEMBLY,SPEC
    • Description: Description was updated
    • Notice Type: SolicitationPresolicitation
    • Response Deadline: Jul 18, 2025Aug 21, 2025
    • Set-Aside: NoneTotal Small Business Set-Aside (FAR 19.5)
    • NAICS Codes: 335311None
  4. Solicitation Posted Aug 04, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Set-Aside: Total Small Business Set-Aside (FAR 19.5)None
    • NAICS Codes: None335311
  5. Solicitation Posted Aug 27, 2025
    • Description: Description was updated
    • Response Deadline: Aug 21, 2025Nov 28, 2025
  6. Solicitation Posted Sep 05, 2025
    • Description: Description was updated
    • Response Deadline: Nov 28, 2025Mar 27, 2026
  7. Solicitation Posted Sep 22, 2025
    No changes from previous notice
  8. Presolicitation Posted Sep 23, 2025
    • Description: Description was updated
    • Notice Type: SolicitationPresolicitation
    • Response Deadline: Mar 27, 2026Oct 24, 2025
    • Set-Aside: NoneTotal Small Business Set-Aside (FAR 19.5)
    • NAICS Codes: 335311None
  9. Solicitation Posted Sep 23, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Set-Aside: Total Small Business Set-Aside (FAR 19.5)None
    • NAICS Codes: None335311
  10. Presolicitation Posted Nov 25, 2025
    • Description: Description was updated
    • Notice Type: SolicitationPresolicitation
    • Response Deadline: Oct 24, 2025Jan 22, 2026
    • Set-Aside: NoneTotal Small Business Set-Aside (FAR 19.5)
    • NAICS Codes: 335311None
  11. Solicitation Posted Nov 25, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Set-Aside: Total Small Business Set-Aside (FAR 19.5)None
    • NAICS Codes: None335311
  12. Presolicitation Posted Mar 10, 2026
    • Description: Description was updated
    • Notice Type: SolicitationPresolicitation
    • Response Deadline: Jan 22, 2026Apr 09, 2026
    • Set-Aside: NoneTotal Small Business Set-Aside (FAR 19.5)
    • NAICS Codes: 335311None
  13. Solicitation Posted Mar 10, 2026
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Set-Aside: Total Small Business Set-Aside (FAR 19.5)None
    • NAICS Codes: None335311
  14. Solicitation LATEST Posted Jun 05, 2026
    • Description: Description was updated
    • Response Deadline: Apr 09, 2026Jul 06, 2026

Details

Solicitation number N0010425QFE38
Notice ID 1c35770805184095babcb02a01cd488a
Notice type Solicitation
Product / Service (PSC) 6150
NAICS 335311
Archive date Jul 21, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Telephone: 7176053992

Email

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
NAVSUP
NAVSUP WEAPON SYSTEMS SUPPORT
NAVSUP WSS MECHANICSBURG
NAVSUP WEAPON SYSTEMS SUPPORT MECH

Dates

Posted Jun 05, 2026 2 months ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 06, 2026 1 month ago